12/05/08 Linac Machine Coordinator Linac Week Report – 11/21-11/28 Linac OverviewLinac Overview SUMMARY OF EVENTS Operational Source: H - Output: 53.1.

Slides:



Advertisements
Similar presentations
Motor Starter Coordination
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
FNAL Linac Downtime Overview Proton Source Workshop Fernanda G. Garcia Accelerator Division Proton Source Department December 7-8, 2010
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Proton Source Task Shutdown 2014 RFQ Injection Linac Tank 1 to 2 emmittance probe and Collimator NTF Beam Line Repair 400 MeV Turbo Station Replacement.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Linac Marx Modulator Update Trevor Butler & Howie Pfeffer 2/25/2015.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
PIP Update Dec. 4th Agenda Summary Update – Current Activities/Updates – Recent PIP News – Upcoming Talks, Reports, Meetings Updates/Talks: Trevor.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
PIP Status Report Linac Startup plans 12/05/2012.
F All Experimenters' Mtg - 07 Jul 03 Week in Review: 06/30/03 –07/07/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
PIP Status Report Linac Startup plans 12/05/2012.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
PIP Update Aug. 21 st Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: B Pellico.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
PEP-II Reliability and Uptime Roger Erickson 13 October 2003 With thanks to C.W. Allen, W. Colocho, P. Schuh, M. Stanek, and the Operations staff members.
Operational experience of high-power RF at Diamond Light Source
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
4K Wave Cold in both rings PS gave us e-lens PS work during Day PP12 lattice test evening First Collisions Overnight Stores 109x109 Start Physics The Story.
03/30/2009F.G. Garcia Linac Group Meeting – March 30, 2009 Agenda: 1) Linac week’s performance 2) Ongoing projects – Status report 3) AOB.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
Aug 23, 2006 Low Power HLRF System and Impact on Distributed RF System Shigeki Fukuda and Task Force Team of DRFS in KEK KEK.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
ALBA RF Systems Francis Perez.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
Brian Drendel May 21, Stacking Pbars stacked: E10 Time stacking: Hr Average stacking rate: E10/Hr Uptime Number of pulses.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
Friday, Feb 12, 2010 Accelerator Status1 Accelerator Week in Review Part I: Regular 9am Scheduling Meeting –Crew Chief Summary –24 hour machine summaries.
Linac Weekly Operational Report May 9 th – May 16 th 2008.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Modeling SNS Availability Using BlockSim Geoffrey Milanovich Spallation Neutron Source.
ESS LLRF and Beam Interaction
PS status 10 August – 17 August 2017
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Failure analysis at BEPCII
Magnet Power Supplies for SuperKEKB Main Ring
LIPAc Control System Reliability improvements
Linac4 RF System Operation for the Reliability Run in 2017
SNS Operational History
WP02 PRR: Master Oscillator and RF Reference Distribution
Project to Develop a Fully Autonomous Vehicle for a Field Environment
Alexander Herlert, CERN (PH-SME-IS)
K. Foraz on behalf of OSS members
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LLRF and Beam-based Longitudinal Feedback Readiness
Stores and Operations Summary Standard Plots
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Operations Department
RF systems introduction
Introduction CDR Normal Conducting Linac LLRF
SBAC Testing Schedule 2017.
Presentation transcript:

12/05/08 Linac Machine Coordinator Linac Week Report – 11/21-11/28 Linac OverviewLinac Overview SUMMARY OF EVENTS Operational Source: H - Output: 53.1 mA Linac output: 36.0 mA 92.4% uptime –Major sources of downtime Swap source KRF3 PFN switch imbalance LRF2 modulator problem KRF5 coil#3 PS replacement NTF patient treatment

12/05/08 Linac Machine Coordinator H-Source ProblemsH-Source Problems Linac Week Report 11/21-11/28 Cover plate with the exit slit. Problem: A piece of molybdenum blocked part of the slit.

12/05/08 Linac Machine Coordinator Linac Week Report – 11/28-12/05 Linac OverviewLinac Overview SUMMARY OF EVENTS Operational Source: I - Output: 56.6 mA Linac output: 37.6 mA 98.9% uptime –Major sources of downtime QPS109 PS replacement RF misc. trips NTF patient treatment

12/05/08 Linac Machine Coordinator Linac Weekly Report W e e k’ s S c h e d u l e Next week’s forecast -Continue to provide beam to HEP and NTF -NTF Schedule 8:30am – 12:00pm - Finalize H - maintenance - Take necessary steps to make new LLRF operational 24/7 in LRF5 - If opportunity arises - continue ongoing installation of QPS control cards (can use anytime > 0.5 hr) - replace 3 PS in Buncher, LRF1 & 3 (ripple) - replace a fan in QPS220 - General station tuning MonTueWedThurFri