GREDP Monitoring QSE Manager’s Working Group December 15, 2010.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

IMPACT TO FREQUENCY CONTROL DURING STARTUP AND SHUT DOWN OF UNITS
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
QSE Managers Working Group July 11, 2011 Base Point Deviation – NPRR377 ERCOT Settlement & Billing Group.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
1 Cutover Daily Call 4:30 PM November 23, :30.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
Special WMS Meeting PRR 525 December 3, 2004 Austin Energy Proposal Leonard Stanfield.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
Nodal Reliability Performance Measures Workshop Project No Public Utility Commission of Texas June 12,
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
NPRR425 - Creation of a WGR Group for GREDP and Base Point Deviation Evaluation and Mixing Turbine Types Within a WGR Art Deller, P.E. RARF Workshop 8/29/13.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
D.R.E.A.M Task Force Distributed Resource Energy/Ancillary Market Task Force September 2015 Meeting.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
QMWG 10/7/13 Generation Resource Energy and Regulation Deployment Performance.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Graph Trend Definitions Telemetered SCE: Sum of all QSE’s Telemetered SCE (uses “Left” scale). Regulation Deployed: Sum of all Regulation Ancillary Service.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
Project Funding Report November 1, Business Integration Update – Agenda –Project Portfolio Updatep Revision Request Funding Reconciliation.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1 Market Trials Real-Time Market / LFC Weekly Update July 30, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
ERCOT Ancillary Services Workshop. Legal Disclaimers and Admonitions ANTITRUST ADMONITION ERCOT strictly prohibits market participants and their employees,
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
PRR525 SCE Method Comparison ERCOT Compliance December 3, 2004.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
QMWG February 7, 2011 January 2011 GREDP Performance Summary.
SGR issues associated with ICCP. 2 ICCP handbook update Split Generation Resources Split Generation Resources are modeled separately by each.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Cutover Daily Call 10:30 AM November 23, :30.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
Analysis for the Determination of X, Y, and Z for Compliance Monitoring NATF.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
1 Market Trials Update NATF January 5, 2010.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
QSE Managers Working Group October 12, 2010 Base Point Deviation Issues – Short Term and Long Term Solutions Nodal Settlement & Billing Group.
QMWG June 2012 Generation Resource Energy and Regulation Deployment Summary.
Generation Resource Energy and Regulation Deployment Performance Report for June 2017 QMWG 07/10/2017.
Non-IRR GREDP < 85% August 2017
May 2012 Generation Resource Energy and Regulation Deployment Performance QMWG 6/8/2012.
Compliance Report to ERCOT TAC February 2007
Presentation transcript:

GREDP Monitoring QSE Manager’s Working Group December 15, 2010

2 QSE Managers Working Group15 December 2010 Agenda GREDP Summary for NON-IRRs GREDP Summary for IRRs Communication to MPs

3 QSE Managers Working Group15 December 2010 GREDP Summary for NON-IRRs (12/1 – 12/13) GREDP Calculation GREDP (%) = ABS[((ATG – AEPFR)/(ABP + ARI)) – 1.0]*100 GREDP(MW) = ABS(ATG – AEPFR – ABP - ARI) Stipulations/Exclusions Must be online and released to SCED Net MW > LSL Intervals must have GREDP % < 8% or GREDP MW < 8 MW Intervals passed/Intervals scored > 85% Excludes forced outages, emergency BPs, or frequency deviations Score Summary 344 On-line and released to SCED at one point, 253 received a GREDP score 23 Resources < 85% Monthly GREDP Compliance 21 Resources < 3% of the month released to SCED 2 Resources ~ 65% of the month released to SCED 1 Data Issue 1 Resource consistently not following BPs

4 QSE Managers Working Group15 December 2010 GREDP Summary for IRRs (12/1 – 12/13) GREDP Calculation GREDP (%) = ABS[((ATG – AEPFR)/(ABP + ARI)) – 1.0]*100 GREDP MW = ATG – AEPFR – ABP – ARI Stipulations/Exclusions Must be online and released to SCED Net MW > LSL Resource must be curtailed (HSL-BP >= 2) Interval must have GREDP % < 10 or GREDP MW must be positive Intervals passed/Intervals scored > 95% Excludes forced outages, emergency BPs, or frequency deviations Score Summary 85 WGRs total, 42 received a GREDP score 29 WGRs < 95% Monthly GREDP Compliance Nearly all WGRs released to SCED ~ 100% 5 WGRs Monthly GREDP Compliance % < 20% 2 WGRs Monthly GREDP Compliance % >= 20% and < 60% 22 WGRs Monthly GREDP Compliance % >= 60%

5 QSE Managers Working Group15 December 2010 Monitoring and Communication Resources not meeting GREDP requirements ERCOT plans to contact QSEs that are responsible for these resources QSEs will be made aware and will have an opportunity to improve their score First GREDP report will be released in the first week of January. Report is available on the MIS Compliance and Disclosure > Compliance Reports – QSE > “Monthly Energy Resource Deployment Report” Protocol View > Section 8 > (4) > “Monthly Energy Resource Deployment Report” Proper venue to discuss appropriateness of the GREDP Metric