Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.

Slides:



Advertisements
Similar presentations
MONITORING OF SUBGRANTEES
Advertisements

Preparing for Confirmation of Candidature
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Conference Title L. Stringhetti, IASF Milano, ASTRI Meeting #9, Bologna 24 Feb Status of the ASTRI/CTA project and organization/management issues.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
© L.A.C.E. Research Group, 2003 University of Cadiz Eudoxos Project Teaching Science with a Robotic Telescope EVALUATION OF THE EUDOXOS PROJECT The evaluation.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Copyright © 2009 NDIA PMSC Robert Loop August 2009 NDIA PMSC Guides Working Group Status.
#17 - Involve Users in the Development Model of Multinational Corporations - Is it worth it? Experience Report IRCSE '08: IDT Workshop Friday 31 October.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
Session 1: Towards international recommendations for energy statistics Vladimir Markhonko International Workshop on Energy Statistics, Aguascalientes,
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
7/26/2006 Wyatt Merritt 1 DECam Preparations for Critical Decision 2/3a Preparations for CD2 Preparations for CD3a DECam MOUs.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Telescope Integration and Tests Tuesday Afternoon.
Post-Secondary Education Program Joint AFN/INAC PSE Program Review with representation from NAIIHL and the Labrador Inuit Regional Information Process.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
2011 RTF Projects RTF Input on SOW Outlines: - Deemed Measure Reviews - Measure Life Guidelines -Measure Cost Guidelines Regional Technical Forum April.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Preparation of the International Recommendations for Energy Statistics (IRES) UNSD Report 3 rd UNCEEA Meeting New York, June 2008.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
D EMO W IND 2 – Delivering Cost Reduction in Offshore Wind ERA-NET Briefing Event 1 December, 2015 Sally Fenton, DemoWind Co-ordinator For further information,
Recent Results of JCA-NID and TSAG Byoung Nam LEE HyoungJun KIM ETRI, Korea.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
Costing review Extract from slide of Philippe: The Panel was impressed by the quality of the presentations and degree of detail to which the value.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Slide 1 Software Construction Software Construction Lecture 3.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
SCT-OS Discussion Notes Vladimir Vassiliev, UCLA.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
Cooperative Development of Operational Safety and Continuing Airworthiness Programme COSCAP South East Asia COSCAP-SEA Action on Decisions 16 th Steering.
German Hermann, MPI für Kernphysik Project Committee Camera developments for CTA Meeting on January 25, 2011 Participants.
Camera PDR/CD1 Planning 19 September 2008
B. Humensky 2/24/2012 CTA-SCT Mtg - SLAC
SCT Project Management Issues
Organization and Goals for the Workshop
Solar-B Science Working Group
S4 will be a “big” Collaboration:
The DBD: Outline and Scope
Marine Strategy Framework Directive (MSFD)
Marine Strategy Framework Directive (MSFD)
Preliminary Project Execution Plan
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB

Recent Lessons LearnedRecent Lessons Learned Preparation of multi-million dollars R&D and MRI proposals was clearly lacking adequate level of technical and cost documentation and was only possible because of the “page limit” requirement (my opinion). If by the time when we receive MRI funds we do not have improved level of documentation, we will likely fail due to very aggressive MRI schedule and significantly underfunded manpower. Our attempt to develop PTDR during last few weeks has demonstrated glaring documentation problems, lack of available technical information, need for definition of “dependencies” between different subsystems, and significant amount of work required to define technical design. Currently available level of documentation is far insufficient for the SCT prototype construction readiness review.

Documentation Development Strategy The project is not yet funded but further progress is slowed down and in some cases is even compromised due to the lack of available organizational, technical, and cost documentation. In this view our approach to the development of the project documentation should be balanced and mostly focused on immediate goals such as preliminary design of the prototype SCT and critical inputs for planning CTA-US participation in CTA. The time scale for the development of minimal set of documentation is a few months (before next CTA meeting in May, 2012) and extensive set of documents for SCT prototype needs to be in place earlier than project start date of MRI (August 1st, 2012). What documentation do we need? PBS + Specs -> WBS -> ICDs -> PTDR

Product Breakdown Structure Approved by PC on 31 Oct Management Plan For the various branches of the PBS a hierarchy of responsible people would be defined. Initially names would need to be identified for the highest level PBS and then later for all further structures. CTA Ref: MAN-PO/111031

PBS in MRI Example PBS levels down to level 3 are approved by the Project Committee. Level 3, however, may have some specifics not common to all telescopes. The approved PBS structure is more or less preserved in MRI

PBS Request 1 Define PBS level 3 and 4, if necessary, and identify responsible people SCT (V. Vassiliev) SCT-MECH (V. Guarino) SCT-OPT (V. Vassiliev) Primary Mirror (…) Secondary Mirror (…) Alignment (…) Mirror Panel Stewart Platform (…) Mirror Panel Edge Sensors (…) Mirror Panel Controller Board (…) Focal Plane Alignment (…) Global Alignment (…) Stray Light Control (…) SCT-CAM (J. Buckley) SCT-FOUND (…) SCT-AUX (…) PBS at CTA-

Referencing DocumentsReferencing Documents

WBS Request 2 Develop WBS down to level 5 (not necessarily with all cost info) Example: Level 1SC- Telescope Level 2 Optical System (SCT-OPT) Level 3 Alignment System Level 4 Focal Plane Stewart Platform (hexapod) Level 5 Hexapod components, machine shop labor, software development, etc

Interface Control Documents Request 3 Define list of required ICDs but not necessarily define full content Example (by M. Errando) : Stray Light Control: ICD 1 with SCT-CAM (Photosensors) Angular acceptance curve of the chosen photo-sensor ICD 2 with SCT-CAM (Camera mechanical structure & Aux) Definition of camera entrance window and camera mechanical support ICD 3 with SCT-MECH Position of baffles, weight, material, etc. ICD 4 with OBS-SOUTH Background light distribution as function of solid angle (snow, etc.)

Specs Level A Preliminary CTA System Performance Requirements

Specs Level B Preliminary CTA Sub-System Performance Requirements CTA Requirements Review Scheduled for March

SCT Specs Request 4 Define list of SCT specifications sufficient to produce preliminary SCT design (Level “B-C”) SST Requirements Example: Define list of specifications for SCT-MECH, SCT-OPT, SCT-CAM Identify specifications requiring further justifications (sims, interaction with industry etc.) Plan (e.g. sim study, memo, who, when, etc.)

PTDR outline & status 10.1 SCT: Introduction (1 page) 10.2 SCT: Justification & simulations (<8 Pages) Coordinator: Brian Humensky 10.3 SCT Optical System Overview (1 page) Primary mirror Segmentation (2 pages) Specifications (2 pages) Mirror panel technologies (1 page) Coating and overcoating (0.5 page) Cost (… later) Secondary mirror Segmentation (2 pages) Specifications (2 pages) Mirror panel technology (1 page) Coating and overcoating (0.5 page) Cost (… later) Stray light control (2 pages) Alignment System Overview (1 page) Panel-to-panel alignment system (2.5 pages) Global alignment system (1.5 page) Cost (… later) Coordinator: Vladimir Vassiliev 10.4 SCT Mechanical System Overview (1 page) Optical Support Structure Overview (P, S, and C) (5 pages) Mirror panels support (1 page) Cost (… later) Telescope positioning system Mechanical system & foundation (4 pages) Electrical system (3 pages) Safety (1 page) Cost (… later) Coordinator: Victor Guarino 10.5 SCT Camera Overview (1page) Mechanical structure (2 pages) Photosensors (2 pages) Front-end electronics (5 pages) Camera DAQ (data flow backplane) (3 pages) Trigger (full concept) (2 pages) Calibration System (1 page) Auxiliary Systems (1 page) Cost (… later) Coordinator: James Buckley Desired due date: March 1 (first draft of contributions was due on February 20)

PTDR Request 5 Discuss status of PTDR Definition and changes of the outline & content Remaining uncertainties and dependencies Identify relevant memos to be written Plan work (sims, etc.) needed for completion Define responsibilities Establish due dates PTDR is expected to evolve into TDR which is the main document containing all technical details required for construction of SCT CTA PTDR -

CTA-SCT Home Page Documentation Example

SCT-X discussions Suggested Template PBS (structure and responsibilities) WBS ICDs Specs PTDR Focus on items requiring collective input or decisions

SCT AOBSCT AOB CTA Consortium meeting May 2012, Amsterdam Input needed for schedule planning How many people plan to go? Do we need special session for SCT WP? If yes, how many people plan to attend it? What time should be allocated for SCT session, if we request one?