 NT-01: Developed internal water leak after a few weeks of operation (may have been related to a beam incident). Managed internal water leak using helium.
Advertisements

3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
1. Diaphragm Meters n Principles of Operation. 1. Diaphragm Meters.
"AIR COOLER" Heat Exchanger
Optimizing valve maintenance using condition analysis IPPTA seminar 17-18th July, 2014.
Super Conducting Fault Current Limiters
MERIT Primary Containment Inspection Van Graves MERIT Video Conference October 13, 2010.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Given Connections Solution
GET CONNECTED INTELLIGENCE FOR YOUR BUSINESS. SUSTAINABLE WATER USAGE? A national transport business recently discovered that R1million of its R1.5 million.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
Metallic phosphoric acid heaters in place of graphite block heaters Vincent PERROT1 SYMPHOS 2013 in AGADIR Morocco.
High Energy Dump LSS5 STI Cost Estimate A.PERILLO MARCONE & F.PASDELOUP 2015/04/16 With contribution of R.FOLCH & D.GRENIER.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
MSIS 630: Week 13 System Implementation and Support
Fermilab PIP Booster Accelerator RF Cavity Refurbishment Matt Slabaugh ARW April 2015.
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
CERN Rüdiger Schmidt Review 30 July 2014page 1 Summary: LIU-SPS external beam dump review SPS external dump review.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
ENEN H- INJECTION: STATUS ON MECHANICAL DESIGN - VACUUM SECTORIZATION - BHZ162 CHAMBER MODIFICATIONS - DUMP AREA - BHZ11 CHAMBER MODIFICATIONS.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Internal H0/H- dump M. Delonca, C. Maglioni On behalf of EN/STI Thanks to: A. Christov, S. Mathot, C. Pasquino, A. Patapenka.
CMS Proposal for a Maintenance & Operation agreement with EN/CV/DC for fluorocarbon detector cooling circuits v.2 P. Tropea For the CMS experiment.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1LIU - PSB Ho-H- Injection Meeting.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
TIDVG2014 PRODUCTION AND INSTALLATION STATUS 23/07/2014 – “TIDVG Follow-up Meeting” Ivo Leitão.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Discussion and preliminary conclusions LIU-SPS dump review.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
1 Evolution and Revolution: Windows 7 and Desktop Virtualization Changing the Desktop Support Landscape Denise Harrison, CIO and Vice President.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
Radiological Safety for Experiment T-489 Irradiation Experiment in Endstation A Spring 2007 ITEMS: Experimental Setup Long-Term Radiation inside ESA Short-Term.
SPS High Energy LSS5 Thermal contact & cooling aspects
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
National Research Center” Kurchatov Institute”
REVIEW AND RECOMMENDATIONS
Impact of TIDVG problem on LSS5 dump design schedule
Preliminary Y-chamber specifications – First draft
Design of TIDVG#4 A. Perillo-Marcone (EN-STI).
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Planned activities on collimator for LS1
EOB Methodology Overview
Beam Dump outline work plan (UK perspective)
Fans & Heaters technical seminar
التدريب الرياضى إعداد الدكتور طارق صلاح.
Industrial Training Provider ,
HiRadMat Test Facility
Its strengths, your benefits
n_TOF Target #3 Baseline Design
Presentation transcript:

RECENTLY OBSERVED PROBLEMS WITH PRESENT TIDVG 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão

Present TIDVG Upper Yoke Core Lower Yoke Graphite Aluminium Copper Tungsten * More details on current and previous design: Pasdeloup’s presentation TIDVG2013 (BA1-SPS)  Known issues:  Prone to water leaks  High degassing rate  Very Radioactive

Damaged TIDVG * TIDVG’s downstream side Aluminium Debris  Is the damage acceptable?

Damaged TIDVG *Video made with industrial endoscope on the TIDVG2013 (downstream side) currently installed in the BA1-SPS

TIDVG2014  (New) TIDVG2004 should be ready by 31th/Aug. Bldg. 954

ProblemCauseLSS1 Corrective Solution(s)Future Solution(s) Water connections prone to leaks Old design (70’s) Fragile connections Aluminium gaskets Copper gaskets solution In situ water leak test New design (robust connections) High degasing rate Graphite blocks Graphite blocks bake-out Core bake-out In situ bake-out* External beam design (using a beam window?) Damaged Dump (Aluminium block) Excessive Beam Load New spare** Temperature sensors Controlled beam load (?) New design (considering future upgrades?) Maintenance operations with high accumulated dose Very radioactive device Specific training Tools and procedures optimization Remote handling (Telemax) Include design for “remote handling” and “end-of-life considerations“ Problems/Causes/Solutions * To be confirmed ** Should be ready by the 31th Aug.

Future implications  Maximum admissible beam load must be defined and controlled in order to avoid further accidents.  Do we have other beam dumps in similar conditions?

THANK YOU 30/07/2014 – “LIU-SPS External Beam Dump” Ivo Leitão