Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.

Slides:



Advertisements
Similar presentations
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
CERN, Main challenges for the ATLAS upgrade project in the coming year.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
TS/CV/DC CFD Team June 2005 – CERN & CFD Presentation1M. Battistin TS/CV/Detector Cooling - CFD Team CERN June 24 th 2005 Michele Battistin CERN presentation.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
PH Theme 3 R&D Introduction Lucie Linssen Meeting with WP leaders 3/11/2008.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
DT News CJ Survey techniques for experiments and advanced 3D Digital Reconstruction Andrea Catinaccio, Aurelie Maurisset, Christophe Bault DT Science-Techno.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
I. Bergevoet - Training preparation
Detector Technology Group (PH/DT)
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
DT-PO Section Meeting Tuesday 30th June , 15:00 Hrs, room 155-R-047
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
CMS gas systems meeting
Merging DT1 + DT2 FH /
M. Battistin CERN EN/CV/DC 9th July 2009
4th FRC meeting, Antti Onnela, CERN-PH-DT
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
European Detector R&D: AIDA
Upgrade Strategy for the Experimental Vacuum Systems
Update on ATLAS insertable B-layer
Tasks, Responsibilities Expectations and Needs
Presentation transcript:

Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia transfer status (Christophe, Philippe) Tour de table: status of various activities (All) AOB DT-PO Section Meeting

News organization from 1/1/09

3

4

New organization CERN – Detector cooling. Transfer of activity to PH (i.e. most likely DT) under discussion – TS/LEA gas supply: Transfer of activity to PH/DT (will possibly happen). – TS/LEA EAM. Will merge with some people from AB/ATB (Gatignon, EFTHYMIOPOULOS, etc.) + a LHC planning group (?) to engineering dept (EN). – TS/SU: will become a section in AB/ABP – IT/CO: will be merged with some people from AB/CO and then form a group in engineering department, GL Roberto Saban. PH would like to preserve JCOP, and also Wayne as coordinator. DT structure – Allain Gonidec stays Dep. Dep. Leader (DDL) throughout 2009 – 2nd DDL position (currently M. Doser) will be suppressed – Linear Collider / CLIC detector study L. Linssen in charge, together with W.D. Schlatter + some fellows/students – A. Gonidec will from 2009 on be in charge of White Paper R&D WPs. There will be a review committee set up to assess progress and objectives. Yearly reviews. – Detector Cooling  See slides. White Paper R&D WP being created. A technical student, Joao Noite (PT), selected (supervision by Antti, prel.). Starts 1 of Jan – Discussion with A. Ceccucci on NA62 (Ferdi present). Several possible involvements of DT: e.g. straw tracker, gas systems (straws, RICH), RICH vessel, controls, Gigatracker mechanics. Approval by RB expected. Then search for funding. Draft MOU exists.

Safety matters In the new CERN organigram Safety commission seems to be located similarly as today… 4 December 20086DT coordination meeting, A. Onnela Here !

Safety matters Building repair status: – Building 25 roof being re-worked right now with heavy equipment Removal of an old concrete layer. Is the building safe during the operation? We, e.g. TSO, not too much informed … 7DT coordination meeting, A. Onnela

Workshop matters DT gluing service / succession plan for D. Fraissard: – 13 Nov: Visits to TS/MME Polymers & Resins workshop (Paolo Chiggiato) and to DT gluing lab (Daniel Fraissard) TS Polymer lab: ”Material science oriented”, electrical insulations, feed- throughs, several ovens and vacuum chambers for resin preparation and curing. ~2 technicians quasi- permanently. DT gluing lab: ”Assembly gluing oriented”, one big oven, space for lamination work and large assemblies. <1 person part-time. – Preserving and promoting the DT gluing lab seems justified, needed in our projects and complementary to what TS/MME has. – Next step: Choosing of successor(s) for Daniel Fraissard Diego Perini, Hans Danielsson, Andrea Catinaccio, Antti Onnela to meet and select candidate(s) Check with Daniel Fraissard + Christian + Ferdi + possible project leader before asking the candidate(s) 4 December 20088

December 1 st 2008Roberto Saban - Status of the LHC & Plans for JanFebMarAprMayJunJulAug Last magnet goes into sector 34 LHC cold 2009 Dec Removal of damaged magnets Cleaning and repair Cold testing Reinstallation Interconnection Pressure testing Cool down LHC schedule

PH Department / Detector Technology Group PH/DT 10 Future of Detector Cooling 1. The new detector cooling project in PH-DT Initial Mandate (preliminary) Build up theoretical and practical expertise for future ‘advanced’ detector cooling systems (PFC, CO 2, not H 2 O) Supports consolidation efforts for existing detector cooling systems Develop thermal management solutions for detector upgrades Contribute to standardization (equipment, controls) If this approach is successful it is expected that CERN can reinforce this team to a central unit, which can undertake the construction and maintenance of the future detector cooling systems. Foreseen resources 1 engineer a 2 nd cooling expert should be hired during FTE of technicians, one PJAS working on controls (already working with MB) 1 tech. Student, 1 Fellow Lab space and Mechanical support Synergies with DT gas systems and magnet controls PH will create a R&D WP (White paper funds, theme 3) for cooling.

PH Department / Detector Technology Group PH/DT Set up a Cooling Working Group (CWG) Initial Mandate (preliminary) Consolidation: ( ) -Understand shortcomings of present systems -Examine present running experience and future operation requirements (e.g. radiation aspects) -Support technical groups and experiments in improving the present systems -Define activities of common interest for the DT Cooling team LHC upgrade phase 1:Pixel Detector Exchange (B-layer in ATLAS, Pixel replacement in CMS) (2009 – 2011) -Define and examine the present requirements of the cooling systems for the new Pixel Detectors in ATLAS and CMS -Work out cooling system proposals for the pixel detectors (where possible these systems should be prototype cases for the upgrade detectors). LHC upgrade phase 2: ( ) -Define and examine the present requirements of the cooling systems for the upgrade Trackers of ATLAS and CMS. Follow up changes in the requirements (and their consequences) in a transparent and traceable way. -Work on a consensus for a common cooling technology for these systems and propose coherent and costed design layouts. The design proposals should include the control system and exploit at best standardizations between ATLAS and CMS. -Steer and rationalize the R&D projects and the construction of selected prototype systems -Work out a QA plan for the construction, installation and commissioning of the future systems.

PH Department / Detector Technology Group PH/DT 12 Experiments 3. Configuration A EN/CV DT Cooling Project TE/CRG Experiments Experiments define clear interfaces and internal structure for all cooling related issues. EN/ICE Cooling Working Group EN/CV-DC  Scope of Detector Cooling WG  The CWG mandate should extend over all parts of the detector cooling systems (including heaters or heat exchangers inside the experiments). The CWG has no executive power. The final technical choices remain the responsibility of the experiments. Foreseen composition Experiments (consolidation + future) DT Cooling Project EN/CV-DC EN/CV EN/ICE Chair  ~ 12 external groups

PH Department / Detector Technology Group PH/DT 13 Experiments 4. Configuration B EN/CV DT Cooling Project (incl. ex- TS/CV-DC section) TE/CRG Experiments EN/ICE Cooling Working Group DT manpower and TS/CV-DC merge to a DT Cooling project avoids doubling of infrastructure and resources avoids artificial split between M&O (CV-DC) and future systems (DT) efficient training of new DT personnel efficient integration of new DT personnel in consolidation efforts simplification for CWG (deals with a single cooling team) external groups

PH Department / Detector Technology Group PH/DT Organisational aspects for configuration B 5.1 Integration in DT group DT intends to split its DI (Detector Infrastructure) section into two sections Detector Cooling Gas systems Magnet controls Irradiation facilities Silicon facility / bond lab Thin Film lab SL: F. HahnSL: NN ~ 25 staff + 2 FSU B-field measurements ~ 12 staff 7 projects with project leaders.

PH Department / Detector Technology Group PH/DT Lab and office space, access to workshops B187 PH/DT Cooling B155 PH/DT Gas B166 PH/DT Mech. workshop B187 is a high quality work area (air conditioned) of about 300 m 2. It is in direct proximity to the gas systems team (welding, electrical and small mech. workshop) and to the DT main mech. workshop B166. Office space is available in B20/21.

PH Department / Detector Technology Group PH/DT Transition During the LHC shutdown period 08/09, consolidation work on the cooling systems of ATLAS and CMS is of highest importance. It should not be compromised by removols of offices and labs. Proposal: CV-DC personnel remain in their offices and labs In parallel, office space and lab space in 187 is prepared Removal around mid 2009 The formal transfer of CV-DC to PH could take place as soon as formal aspects (budgets, maintenance contract, quota for fellow and students) are clarified, ideally on 1 Jan Computational Fluid Dynamics The CFD activities, which rely currently on student and fellow manpower, supervised by M. Battistin, should be continued as a service for the whole of CERN. The service could be part of the PH cooling team or remain in EN/CV.

13 Nov Preliminary. WPs in preparation M&O Projects ALICE Operation LHCb Operation Gas M&O Magnet M&O ATLAS Operation 4.1 CMS Operation TOTEM Operation Total LHC NA48/ CAST M&O Total Non - LHC LHC Non - LHC WPs agreed Requires 2 nd iteration Resource allocation

13 Nov Existing commitments only (preliminary) Construction Projects and Design Studies LHC Construction LHC Upgrade Non- LHC ALICE HMPID2.2 ALICE Tech. Support5.5 ALICE TPC2.5 ATLAS ALFA ATLAS ID3.9 ATLAS Tech. Support2.1 CMS ECAL1.3 CMS Pre-shower CMS Tech. Support1.0 CMS Tracker1.0 LHCb Muon2.1 LHCb RICH2.9 LHCb Tech. Support1.8 TOTEM RP TOTEM T1/T Gas Systems3.7 Magnet Control3.0 Total LHC Construction ATLAS Upgrade CMS Upgrade LHCb Upgrade ALICE Upgrade Total LHC Upgrade Cloud T2K Field Mapper + MSS NA48/ AD / AEGIS 0.3 Total Non LHC LHC constructions end mostly in 2008/09 Extract from DT steering meeting: 13 Nov 2008

General approach for new projects Avoid fragmentation into too many mini projects (~1-2 FTE) Collaborate with experiment’s CERN group Try to apply available expertise and infrastructure (DSF, bond lab, thin film lab, irradiation facilities, mechanical workshops, gluing lab...) Find interesting projects to keep phys/eng/tech up to date in new technologies  Aim for ~2-3 main projects with major hardware deliverable + a couple of smaller projects. + engineering/integration/installation support First discussions took place… ATLAS upgrade: pixel endcap,  -strip tracker endcap CMS upgrade: cooling (see next slide), muon RPCs, beam monitoring, humidity measurement ALICE upgrade: HMPID LHCb upgrade: VELO upgrade (40 MHz) TOTEM upgrade: Large GEM (T1), part of WP5 NA62: Giga tracker, Straw tracker, gas systems, controls, (RICH ?) 19

13 Nov Engineering R&D (discussion forum, all LHC experiments + DT participating, moderated by L.Linssen) We expressed interest to participate in a couple of common engineering R&D activities, e.g.  Detector cooling o DT/CMX/AT-CRG intend to study suitability of CO2 cooling for large scale detectors. Pilot case: New CMS pixel det.; Timescale 18 months. o Could be extended...  Reverse engineering = 3D models for high accuracy reconstruction of built structures. DT/TS-SU. 1 shared fellow requested. Time scale 2 years.  Material for future detectors (structural, thermal, radiation hard, pipework and joining techniques).

Resource allocation

Courses CATIA planned for beginning of next year, I hope Other… FEA etc – pls submit requests and input you may receive. AOB