Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
QA/QC working group Working group ATLAS NSW - QA/QC working group - J. GIRAUD (20/02/2014)1.
LUMI 1 LUMI Mechanical Design Details Bill Ghiorso.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
HPD Development Project is DONE! The Future is Quality assurance Database management Alignment Production of cookies and mounts Electronics interfacing.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
TPC Design Concept: From MicroBooNE to LAr20
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Materials Qualification for long drift Liquid Argon TPC Effect of water on electron drift lifetime Plans Material Tests, purging and H20 studies, Purity.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
CLAS12 Drift Chamber Prototyping
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Concept Design for LBNF Far detector (LAr single phase)
Installation of the T600 at Fermilab CSN2, September 22,
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DUNE (SP) and SBND TPC Field Cage Designs Bo Yu Brookhaven National Lab.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
ProtoDUNE TPC Electrical Design Bo Yu 7-March-2016.
Need for Quality Management Jim Stewart Dune Collaboration meeting UT Arlington January 13 th 2016.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Overview of 35ton Phase 2 Detector Bo Yu 35t Installation Readiness Review August 25, 2014.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
FC: Decisions, Issues, Next steps Bo Yu BNL Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
ProtoDUNE SP TPC Summary Bo Yu 12-June APA Design APA design has remained relatively stable since CD1-R 2.3m wide, 6m tall active area, 2560 readout.
Failure Mode: CPA. Surface Finish ProblemQA (Design)QC (Production) CPA edge tube surface scratches Shipping/handling procedures Visual inspection HV.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Planning for Proto-DUNE PD Installation and Cabling at CERN
ProtoDUNE High Voltage Design
Installation of the T600 at Fermilab
ProtoDUNE – DSS Installation, Alignment and QA
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Ensuring a successful TPC production
First tests on the roll-formed field cage.
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Opening Executive Session M.C.
Design Review: DUNE Single Phase Cathode Plane Assembly, Field Cage and High Voltage CloseOut CERN 10/11/16.
Vertex Detector Mechanical R&D Design Questions and Issues
Warm structure requirements :
NP04 CPA/FC/HV Interfaces
Pressure vs height (solid CPA plane)
TPC Field Cage Progress Report
TPC Support and Constraint TPC Support
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Undulator System Components Status Dean Walters
TEC assembly and commissioning at Lyon
Limited Streamer Tube Project Summary
DS20k Integration Workshop
Presentation transcript:

Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016

QA vs. QC Quality Assurance is process oriented and focuses on defect prevention, while quality control is product oriented and focuses on defect identification.

QA Program Integrate QA into the system design process  Design features that facilitate acceptance tests Define realistic tolerances on all components based on scientific requirements and fabrication limitations  In case of conflict, design features to minimize performance impact Automate key processes to minimize production variations and errors  Wire placement, wire tension control, wire tension measurement  Use commercial available components when possible Clearly define interface agreements  Cryostat, cryogenic system, photon detectors, cold electronics, beam window  All key TPC components are designed with close collaboration with the installation WBS

QA Program, cont. Lessons learned  From MicroBooNE: intermediate wire support, evaluate field cage + cathode transient response, hardening against HV discharge damages  From 35ton: avoid bonding wires across board boundaries, modify CE attachment, redesign bubble containment, allow proper clearances between interconnected parts full 3D model is essential to ensure successful integration/installation

QA Program, cont. Material tests  Wire bonding method studies (SBND)  Molded wrapping board edge bonding test (SBND)  CTE measurement of all structural materials  APA frame construction method (welded vs bolted)  CPA resistive materials (temperature, abrasion, discharge, electrical contact…)  Field cage profiles (HV test in pure LAr)  Destructive test of pultruded fiber glass beam to validate FEA  HV bus interconnect test (cold)  Outgassing test of all materials at FNAL MTS  Radioactivity measurements on CPA material Long term reliability study of components (?)

QA Program, cont. Mockups/prototypes & qualification tests  Full size APA frame, and process prototype assembly (thermal cycle, vibration)  TPC suspension feedthroughs and rail/carriages  Cryostat ceiling to investigate TPC suspension/installation/deformation  Full size field cage (thermal cycle, vibration?, HV)  Full size CPA module (thermal cycle, vibration?, HV)  CE/PD cable routing through APA frame  CE module mounting, and cable routing/strain relieve  Beam window integration (mechanical, electrical, thermal)  Shipping container

QA Program, cont. Define and document all QC procedures, acceptance criteria and corrective actions (at production site or at CERN) in case of defects Material review board  Review QC results and implement corrective actions Schedule reviews at key design phases  APA, CPA/FC, Integration Drawing revision control Travelers for all production modules Training of collaboration personnel responsible for handling the TPC components during design, production, testing and installation phases

QC Tasks: APAs (6 modules) Task NameWhereLaborEquipment APA frame material tolerance testPSL UK 2 persons 1 week Large flat table APA frame acceptance testPSL UK 3 persons 3 weeks Large flat table, crane, laser tracker Wire tension, pitch measurement (30 sec per wire) PSL UK 2 persons 1 month Tension meter Wire continuity testPSL UK 2 persons 1 month DVM, cable adapter CCR board leakage current test and HV test warm and cold PSL UK 1 person 1 month HV power supply, current meter APA acceptance test with cold electronics in warm and cold (1 day cool down, 1 day test, 1 day warm up) PSL UK 3 persons 1 month Large faraday cage, large cryostat, CE modules + miniDAQ PD integration test: PD insertion, cable connection test PSL UK 1 person 6 days Cable tester, mockup PD module

QC Tasks: CERN Task NameWhereLaborEquipment APA unpacking, acceptance test with cold electronics in CERN to check wire integrity CERN3 persons 2 weeks Large faraday cage, CE modules+miniDAQ APA wire tension spot check: Priority to board boundary wires CERN2 persons x weeks Tension meter The tasks below are deemed to be Installation activities APA integration with full CE moduleCERN APA integration with PDsCERN APA integration with DAQCERN Cold test of fully integrated APAsCERN3 persons 3 weeks Large shielded cryostat, DAQ

QC Tasks: TPC CPAs (~15 modules) Task NameWhereLaborEquipment CPA resistive material acceptance test: measure uniformity of surface resistivity and lamination quality CPA site2 persons 1 week Custom R probe CPA module acceptance test: dimensional tolerance, electrical contact check, surface finish check on tube section CPA site2 persons 3 weeks High -R meter, large flat table CPA module cold test with HV busCPA site2 persons 2 weeks Cryostat, hi-R meter CPA assembly test 2.3m x 6m assembly CPA site3 persons 1 week High ceiling, crane CPA HV test: Testing the CPA edges in air or LAr CPA site2 persons 2 weeks HV power supply, safety cage

QC Tasks: TPC CERN Task NameWhereLaborEquipment CPA unpacking and acceptance tests: Visual inspection of surfaces, electrical contact check, resistivity check CPA site2 persons 1 week High-R meter

QC Tasks: TPC Field Cage (24 modules, ≥ 6 with ground planes) Task NameWhereLaborEquipment Visual inspection of the metal profiles to identify deep scratches and sharp edges FC site1 person 1 week Cold test the resistors and varistors: Bin the resistors based on their cold resistance, verify the threshold voltage and resistance at operating bias FC site1 person 1 month HV supply, Hi-R meter HV breakdown test of UHMW caps in airFC site1 person 1 week HV supply Continuity test of the field cage/R-dividerFC site2 persons 1 week HV supply Hi-R meter Visual inspection of the ground plane panels to identify sharp edges in perforations. GP site2 persons 1 week HV breakdown test of ground plane in air: HV across a thin air gap, looking for corona GP site2 persons 1 week HV supply HV breakdown test of FC/GP assembly in assembly site (FC/GP could ship separately) FC site?2 persons 1 week HV supply

QC Tasks: TPC Field CERN Task NameWhereLaborEquipment Visual inspection of the assembly for shipping damages, Continuity test of the field cage/R- divider CERN2 persons 1 week HV supply Hi-R meter HV breakdown test of FC/GP assembly in air: If assembled at CERN CERN2 persons 1 week HV supply Beam window integration testCERN2 persons 1 week HV supply cryostat?

QC Tasks: TPC Integration Task NameWhereLaborEquipment TPC installation rail partial assembly with suspension feedthroughs PSL?3 persons 1 month High ceiling, crane 1/3 scale TPC integration trial: 2 APAs, 2 CPAs, 4 horizontal FCAs, 3 vertical FCAs. PSL?5 person 2 months High ceiling, crane, TPC assembly tools

QC Tasks: TPC HV System (1 feedthrough, 1 or 2 filters) Task NameWhereLaborEquipment Test the HV feedthrough in clean argon up to 250kV? HV site2 persons 1 month HV supply, large LAr dewar with purification Measure the HV filter efficiency at the frequency range of interest HV site1 person 2 days High ceiling, crane