Possible QXF v2 Fabrics E.F. Holik, Steve Krave, Miao Yu, Lucas Zimmerman QXF coil WG meeting 8/19/2015.

Slides:



Advertisements
Similar presentations
TQM05 (coil #36) Test Summary 1. TQ coil #36 in a mirror structure Coil #36 tested with a radiation resistant impregnation material 0.7-mm diameter Nb.
Advertisements

Coil TQ 36 size measurements F. Nobrega/ R. Bossert
HQ & LHQ End Parts Miao Yu Fermilab 08/27/12. HQ parts All the spacers are arriving within a week. 2.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
S2 Glass Insulation Hexcel Corporation S2 Fiberglass Cloth #4522 with F81 Silane Finish. 30” (0.762 m) wide roll, 125 yards long (114.3 m),.0051” (0.130.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
LHQ Coil 1 OL Curing LHQ Coil 1 Shipping Miao Yu 02/28/2013.
QXFSM1 Mirror Shim System R. Bossert Dec. 1, 2014 LARP Teleconference.
SQXF Practice Winding 1 L2 winding Miao Yu 01/23/2014.
1 What we know (and still don’t) on He II heat transfer through electrical insulation for accelerator magnets Bertrand Baudouy CEA, Irfu, SACM Gif-sur-Yvette.
Film Storage and book-keeping Scanning Quality Control Cosmic Ray Density Vertex Confirmation Vertex Location WG4 summary.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
HQ Coil 23 and 25 Status LARP Video Meeting September 19, 2013 Dan Cheng.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
DOE Review of LARP – February 17-18, 2014 QXF Conductor and Cable Arup K. Ghosh Feb
Susana Izquierdo Bermudez. With many contributions from Juho Rysti, Gerard Willering and all the people involved in the manufacturing and test of the magnet.
1 QXF heater design: current status and the path forward M. Marchevsky (LBNL) 03/06/2014 D.W. Cheng, H. Felice, G. Sabbi (LBNL), G. Ambrosio (FNAL)
HQ Splice Insulation QXF Coil working group Video Meeting August 22, 2013 Dan Cheng August 22, 2013.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Dan Cheng 1/13/2015 LARP Copper Plated Trace Development Update.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
CARE-HHH-AMT Workshop on Heat Generation & Transfer in Superconducting Magnets Paris, November 190th Experience at CEA Experience at CEA Jaroslaw.
1 QXF heater parameters G. Chlachidze, M. Marchevsky March 13, 2014.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
Surface Coatings & Tests for LARP Coil Endparts Task Force D.W.Cheng LBNL February 24, 2012.
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
HT/Armaflex.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
D. Cheng Feb 11, 2014 QXF Instrumentation Trace Update.
Mirror Fabrication via Glass Slumping Techniques Anita Schael Max-Planck-Institute for Extraterrestrial Physics in collaboration with: Monika Vongehr,
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
LHQ Coil 03 Winding and Curing Miao Yu, Steven Krave 05/23/2014.
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.
L/R Coil Asymmetry Coil Fabrication Working Group Trey Holik Wednesday, June 3 rd 2015.
Measuring Fabric Thickness due to Binder, Pressure, and HT T. Holik QXF coil WG meeting Wednesday, March 11, 2015.
QXF Coil Insulation during Each Step QXF Coil WG Miao Yu 08/22/2013.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
Nikolaj Zangenberg, Danish Technological Institute Dec 1st, 2015 HTS tape insulation.
QXF cable insulation at CERN Paolo Ferracin, Jorge Munoz Garcia, Laura Garcia Fajardo, Jacky Mazet Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA.
QXF Winding/Curing Tooling and Curing Mold Miao Yu, FNAL 04/09/2013 CM20_Napa Valley, CA.
Review of Modular Coil Winding Pack Configuration David Williamson March 19, 2004.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Superconductng cable for CBM magnet
QXF Coil Fabrication & Tooling Reaction / Impregnation
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
HQ Mirror Assembly R. Bossert
HQ Coil 19 Test Impregnation
MQXF Quench Protection and Meeting Goals
11 T dipole coil features and dimensions
Mechanical stability and QXF coil winding
the MDP High Field Dipole Demonstrator
MQXF quench heaters: tests and investigation (CERN)¶
Fred Nobrega September 4, 2019
Presentation transcript:

Possible QXF v2 Fabrics E.F. Holik, Steve Krave, Miao Yu, Lucas Zimmerman QXF coil WG meeting 8/19/2015

Possible OD/ID, Interlayer, Tape S-2 glass candidates were measured for thickness with and without binder. Measurements were taken with 1 to 12 layers of material between two 7cm x 7 cm plates from 1.75 to 5 Mpa. 2 What and How /ProposedPlanForMeasuringMaterialThickness.pptx turecoilWG/ _LARP_MQXFS_MeasuredMaterialThicknesses.pptx

3 Needed S-2 Glass 150 µm (6 mil) S2 glass 100 µm (4 mil ) Polyimide trace 310 µm S2 glass (Impreg) 100 µm (4 mil) Polyimide trace Midplane 660µm S2 glass 410 µm S2 glass (Reaction)

4 5 Fabrics Measured CompanyStyleSizingNom. Thk.Weaveoz/yd2g / ccWarpFillWarp CNTFill CNT BGF A0.0095"8H Satin SCG 75 1/ BGF6576tbd0.0116"8H Satin SCG 75 1/0SCG 150 1/ JPS (large order)26781tbd0.0090"8H Satin SCG 75 1/ JPS (to be verified)6781tbd0.0096"8H Satin SCG 75 1/ Hexcel4522F "Plain SCG 150 1/ Hexcel (large order)66281HTtbd0.0070"4H Satin SCG 75 1/ Satin weave is more pliable, incompressible, and dense when compared to plain weave Plain Weave 8H Satin Weave

5 Measured Thickness (single layer equivalent) Candidate / Test setup1.6 MPa5.0 MPa 1.6 MPa BGF layer plain BGF layer binder JPS single layer plain JPS layer plain JPS triple layer binder Hexcel 66281HT 10 layer plain Hexcel 66281HT 4 layer binder Hexcel layer plain Hexcel 4522 single layer plain BGF layer plain BGF 6781 single layer plain BGF layer binder layer plain: 10 sheets of fabric without binder were measured together Single layer plain: a single sheet of fabric without binder was measured 2 layer binder: binder was applied to 2 sheets of fabric and subsequently measured. Triple layer binder: binder was applied to 3 sheets of fabric and subsequently measured. 4 layer binder: binder was applied to 4 sheets of fabric and subsequently measured. Microns

6 Best Candidates Interlayer Insulation Reaction OD Impreg OD Impreg ID Microns Candidate / Test setupThicknessGoalDifferenceLayers BGF layer binder two layers BGF layer binder three layers JPS triple layer binder two layers Hexcel 66281HT 4 layer binder three layers BGF layer plain two layers JPS layer plain three layers Hexcel 66281HT 10 layer plain three layers Hexcel layer plain five layers BGF layer plain two layers JPS layer plain (large order) two layers JPS layer plain (estimate) two layers Hexcel 66281HT 10 layer plain three layers Hexcel layer plain three layers BGF layer plain two layers BGF layer plain one layer JPS single layer plain (large order)150 0one layer JPS 6781 single layer plain (estimate) one layer Hexcel 66281HT 10 layer plain one layer Hexcel 4522 single layer plain one layer BGF 6781 single layer plain one layer

7 Summary BGF 6576 with 497A (currently used) sizing seems to be the best candidate for the reaction OD and Interlayer insulation. JPS with 933 HTS (High Temperature Silane [AGY]) sizing seems to be the best candidate for impregnation ID and OD but has a 5800 yard minimum order. Can get fewer yards with CS767 JPS sizing (untested) JPS 6781 with CS767 JPS sizing is the next best candidate for impreg ID and OD. 125 micron tape was ordered but 175 micron tape was shipped. Corrected order is in progress. Coil Fab 5 Mpa (µm) Nom.W&CRXNIMPG ID150150, 158 OD Reaction (2 layers) OD Impregnation310314, 332 Interlayer (w/ binder) (2 layers) Tape (w/ binder)125N/A Tape (w/o binder)125N/A Many thanks to Lucas Zimmerman for data collection!