Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.

Slides:



Advertisements
Similar presentations
Project Management. Main Phases of Project Development.
Advertisements

Robo-FootballE2 Project Design Review 1 - 1/31/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
JASON BARROCAS KEVIN HERNANDEZ TANISHA RICHARD DEPARTMENT OF MECHANICAL ENGINEERING FLORIDA INTERNATIONAL UNIVERSITY - MIAMI, FLORIDA Enhanced Hurricane.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
P10057: Delivery and Scale-Up of a Monitoring Device for Human Smoking Behavior Ryan Miller – Project Manager Chris Oxley – Lead Engineer Ryan Enyeart.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Cook Stove for Haiti Project Date: February 22, 2011 Location: Time: 8am – 9am Managerial Design Review.
9/2/04 Pratham Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer: Nick Martin.
Project: Ink Slinger Team Members Mandi Fournier Stephen Gagnon Ryan Kittredge Matt Nusbaum Adam Ranney Denver Wilson.
Team Name Conceptual Design Review University/Institution Team Members Date.
Bad News Bots E2 Project Design Review 6 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Auto - Drive An Automated Driving Range. Team Members Mike Loiselle Jared Beland Jeremy Paradee.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Curry Mouse EE 296 Project Proposal Presentation February 11, 2006.
Interactive Xylophonic Keyboard Mini-Mozarts October 12, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Pratham Presenter: Nick Martin Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control Engineer:
Pratham Presenter: Reed Langton Team Leader: Matt Ryan Chief Engineer: Gabe Letona Fabrication: Reed Langton CADCAM: Fraterno Vila Electronics/Control.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
7 December 2004AME 470 – Team Unum Critical Design Review Team Unum University of Notre Dame AME 470 Ltd.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
A6: Team Rallye Potable Water Still Presented by: Entire Group September 28, 2006 Eric Sabelhaus Nicole Del Rey Mike McConnellTim Rodts.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
A6: Team Rallye Potable Water Still Presented by: Nicole Del Rey October 3, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Interactive Xylophonic Keyboard Mini-Mozarts November 9, 2006 Gordon Farmer Michael Johnson Eric Laumann Bryan Marek Philip Moss.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Human-Powered Potable Water Still A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
12/7/2004 AME470 Ltd. - Team Pratham 1Open-Aid TEAM PRATHAM Team Leader: Matt Ryan Chief Engineer: Nick Martin Fabrication: Reed Langton CADCAM: Fraterno.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Final Presentation.  Chris Johnson, Team Leader  Tim Hahn  Bradley Lesher  Michael LaPuma  Project Advisor: Gene Hou  Student Advisor: Stanton Coffey.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
EE/CS 480 Fall September, 2007 University of Portland School of Engineering Project Blue Heron Educational Ball and Beam Control System Team Bryan.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
Status Report #5 Automatic Child Safety Gate: Corry Winslow Roger Battles Philip So Description: A telescoping gate with sensor technology through the.
Automatic Shift Controls for ATV Sponsored by: Joel Notaro Polaris Industries Advised by : Professor George Slack Project Family: Modular, Scalable, Open.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Kaitlin Peranski Spencer Wasilewski Kyle Jensen Kyle Lasher Jeremy Berke Chris Caporale.
EML 2023 Portfolio. EML 2023 Department of Mechanical and Aerospace Engineering HW 1 – Three View Drawings 2 Problem 1.
Innovative Musical Instrument Mini-Mozarts Gordon Farmer Michael Johnson Eric Laumann Philip Moss Bryan Marek.
A6: Team Rallye Potable Water Still Presented by: Eric Sabelhaus October 12, 2006 Eric SabelhausNicole Del Rey Mike McConnellTim Rodts.
Team Concept and Key Issues AME 470: Senior Design ASME Bulk Material Transporter Matt Bertke, Paul DeMott, Patrick Hertzke, Will Sirokman 16 September.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Team John Deere Post-Midterm Review Week 8 Josh Ebeling Jamari Haynes James June Mike Reno Ben Spivey Gary Twedt Wade Burch.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
Human-Powered Potable Water Still A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
A6: Team Rallye Potable Water Still Presented by: Mike McConnell November 2, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
Toteable, Potable Water A2 Nate Barbera Katie Kimar Ryan Reis Connie Slaboch.
AME Senior Design Group E3: Hewlett-Packers February 7, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Motor Assisted Wheelchair Design Review 10/01/15.
Zach Bolotin Cody Hatch Robert Swartz
Stationary Balance Training Bicycle - P08001
Team P09009 One-Arm Wheel Chair System Level Design
P08351: Automated Oiling System
Software Development Process
Determination of MSW Specific Weight
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat Fox, Matt Medlock, Mike Tieu

Status of Design Concept Design currently visualized:

Status of Design Concept Design Status: Design Status: --Majority of parts are ordered including… -Pressure Sensors $40 -Finger Tip Slips $5 -drums $45! --housing unit design has been decided on

Status of Design Concept Project Scheduling Project Scheduling - Behind schedule but driving forward and under budget Showstoppers Showstoppers - How the selected solenoids will drive the drum stick

Last Week’s Action Items Item: Item: -Buy prototype components Action: Action: -had a meeting on the Tuesday before break to decide on specific parts Outcome: Outcome: - 17” long standard drum stick ¾” diameter - 0 to 1 lb pressure sensors - finger tip slips - electronic components from Mr. Brownell - electronic components from Mr. Brownell

Last Week’s Action Items Item: Item: -Decide on pivot configuration Action: Action: - met on 9/5/06 to discuss pivot design Outcome: Outcome: - trade studies were necessary - specifics not worked out 10.5” from pivot to drum tip

Last Week’s Action Items Item: Item: -Build frame to house components Action: Action: -had a meeting on the Tuesday before break to determine necessary materials and specific dimensions Outcome: Outcome: - Housing unit based on drum dimensions Smaller drum: diameter 14.5” height 10” Larger drum: diameter 15.5” height 12” - frame has not been built yet

This Week’s Action Items Item: Item: - Define quantifiable prototype requirements Action: Action: meet and decide on requirements such as… - frequency of drum impact - total weight - volume levels

This Week’s Action Items Item: Item: Order the two solenoids Action: Action: - Use trade studies - Ryan will order on this Tuesday

This Week’s Action Items Item: Item: Build housing frame Action: Action: - Pat Fox is building the frame by Sunday - Pat Fox is building the frame by Sunday

Questions????