NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet Group 1 Harsh Sopory Kaushik Narayanan Nafeez Bin Taher.
Advertisements

Hardware status GOLD Update 02 Feb Uli Schäfer 1.
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Chapter 7 Photonic Transmission Systems (Digital & Analog)
Transmission Media / Channels. Introduction Provides the connection between the transmitter and receiver. 1.Pair of wires – carry electric signal. 2.Optical.
A 10Gbps SMPTE 292M compatible optical interface July Sony Corporation.
The Optical Transmitters for the LHCb L0 Calorimeter Trigger G.Avoni, G. Balbi, A. Carbone, I. D’Antone, D. Galli, I. Lax, U. Marconi and V. Vagnoni, INFN,
March, 2013 Presenting: Avner Badihi TECHNOLOGY&MANUFACTURING XLoom Proprietary and Confidential 120GB-300Gb Optical Interconnect Solutions for Optical.
IEEE06/San Diego R. Kass N Bandwidth of Micro Twisted-Pair Cables and Spliced SIMM/GRIN Fibers and Radiation Hardness of PIN/VCSEL Arrays W. Fernando,
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
IEEE08/NSS R. Kass N Radiation-Hard/High-Speed Data Transmission Using Optical Links W. Fernando, K.K. Gan, A. Law, H.P. Kagan, R.D. Kass, J. Moore,
1 L0 Calorimeter Trigger LHCb Bologna CSN1 Assisi, 22/9/04 U. Marconi INFN Sezione di Bologna.
NA62 GigaTracKer Working Group meeting Integration and GTK-carrier PCB design April 9, 2013 Michel Morel.
SODA: Synchronization Of Data Acquisition I.Konorov  Requirements  Architecture  System components  Performance  Conclusions and outlook PANDA FE-DAQ.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
© 2001 By Default! A Free sample background from Slide 1 Optical Ethernet Design Results Status Presentation Receiver Group.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Developing fast clock source with deterministic jitter Midterm review Yulia Okunev Supervisor -Yossi Hipsh HS-DSL Laboratory, Dept. of Electrical Engineering.
A CTIVITY II: ALICE ITS R EADOUT E LECTRONICS S ERIAL L INK C HARACTERIZATION Hira Ilyas Madiha Tajwar Jibran Ahmed Raise Ikram (carrier board) Dr. Attiq.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Optical Readout and Control Interface for the BTeV Pixel Vertex Detector Optical interface for the PCI board –1.06 Gbps optical link receiver –Protocol.
JgimenoIWM-12/1/2004 Fiber Optic module 1 STUDIES AND DEVELOPMENT OF A FIRST FIBER OPTIC MODULE PROTOTYPE Javier Gimeno Vicente.
PROGRESS ON ENERGY SUM ELECTRONIC BOARD. VXS Backplane Energy Sum 18 fADC VME64 High Speed Serial VME64 16 CH Detector Signals Crate Sum to Trigger Energy.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
Implementing a 10 Gb/s VCSEL Driven Transmitter for Short Range Applications Irfan N. Ali Michael C. Clowers David S. Fink Sean K. Garrison Jeff A. Magee.
Part 3  Transmission Media & EM Propagations.  Provides the connection between the transmitter and receiver. 1.Pair of wires – carry electric signal.
Towards a 7-module Micromegas Large TPC prototype 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Agata Week – LNL 14 November 2007 LLP ATCA Carrier Status M. Bellato on behalf of the LLP Carrier Working Group.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Adam Marmbrant Samuel Silverstein Stockholm University Link Test Status.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
BPM stripline acquisition in CLEX Sébastien Vilalte.
16 February 2011Ian Brawn1 The High Speed Demonstrator and Slice Demonstrator Programme The Proposed High-Speed Demonstrator –Overview –Design Methodology.
Dirk Wiedner 16 th February OT/ITCALO MUON RICH1/TT RICH2 +TFC system.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
VC707 Evaluation Kit Xilinx Virtex-7 In_0 GTX MHz IDELAY 8B/10B Serilizer 7 0 7IDELAY 0=>K28.5 0=>K28.1 D(15:0) K(1:0) 8B/10B IDELAYCTRL LHC_Clk.
Performance characteristics of COTS 10Gb/s Optical Links for SLHC Experiments Jan Troska, Markus Axer, Karl Gill, Robert Grabit, Raquel Macias Jareno,
GBT protocol implementation on Xilinx FPGAs Csaba SOOS PH-ESE-BE-OT.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
Jitter and BER measurements on the CuOF prototype G. Dellacasa, G. Mazza – INFN Torino CMS Muom Barrel Workshop CERN, February 25th, 2011.
1 S. Russo, F. Ameli KM3Net WP3-WP5 Joint Meeting :: Paris :: February 2009 Copper backbone data transmission system: first results.
Data transmission characterization with underwater copper link
CLOCK measurements.
Update on CSC Endcap Muon Port Card
Large Area Endplate Prototype for the LC TPC
TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Subject Name: Optical Fiber Communication Subject Code: 10EC72
TTC System Status May 2007 System overview Production Status
TTC system for FP420 reference timing?
The Role of Light in High Speed Digital Design
B. Sc.Eng, M.Sc., C.Eng., FIE(SL), FIEE(UK), FBCS(UK), CITP, MIEEE
Commodity Flash ADC-FPGA Based Electronics for an
Test Bench for Serdes Radiation Qualification
New DCM, FEMDCM DCM jobs DCM upgrade path
GIGABIT ETHERNET DESIGN ECE Spring 2004
Digitally subtracted pulse between
Presentation transcript:

NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel2 Outline Integration of the heater mockup with GTK carrier board Clock measurements Serial Data transmission Single pulse transmission Conclusion Next steps

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel3 Integration of the heater mockup with GTK carrier board

Layout of GTK carrier equipped with ceramic heater December 13, 20114Giga Tracker Working Group meeting M.Noy & M. Morel Top view

Connections done with standard Al bonding wires December 13, 20115Giga Tracker Working Group meeting M.Noy & M. Morel Layout of GTK carrier equipped with ceramic heater

December 13, 20116Giga Tracker Working Group meeting M.Noy & M. Morel Bottom side of the GTK carrier Layout of GTK carrier equipped with ceramic heater

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel7 CLOCK measurements

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel8 Clock measurements on STX and SRX laser modules 300mm of micro strip, 6mm of bonding wires and SMA connectors Stanford CLK generator Lecroy SDA13000 Serial Data Analyser GTK test board 300m fiber Optical Attenuator

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel9 AFG3252 Pulse Generator Lecroy SDA13000 Serial Data Analyser GTK test board 300m fiber Clock measurements on STX and SRX laser modules 300mm of micro strip, 6mm of bonding wires and SMA connectors Choice between OCP and Finisar STX and SRX laser modules 300m of SM or MM optical fiber SY89113U 1:12 LVDS Fanout SY55855V PECL to LVDS Translator 300mm of micro strip line, vias and 6mm of bonding wires SMA connectors Optical Attenuator

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel10 attenuation dB RMS jitter in ps 20Mhz26.7Mhz250Mhz320Mhz400Mhz RMS Clock jitter measured on OCP STX/SRX with 300m of SM fiber

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel11 AFG3252 Pulse Generator Lecroy SDA13000 Serial Data Analyser GTK test board 300m fiber Clock measurements on STX and SRX laser modules 300mm of micro strip, 6mm of bonding wires and SMA connectors

December 13, 2011 Giga Tracker Working Group meeting M.Noy & M. Morel 12 Serial DATA transmission

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel13 Lecroy SDA13000 Scope GTK test board 300m MM fiber Mini-T Xilinx Virtex-5 SERIAL DATA 3.5Gb/s using REFLEXPHOTONICS SN-R12-C00501 SNAP 12 Receiver AFG3252 Pulse Generator Optical breakout

Bonds 2mmBonds 4mmBonds 5mm Bonds 6mm Bonds 8mmBonds 9mm SERIAL DATA 3.5Gb/s

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel15 GTK test board 300m MM fiber Xilinx VIRTEX-5 Minit-T BER 3.5Gb/s AFG3252 Pulse Generator Optical breakout

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel16 GTK test board optical modules tested - TYKO ZL60114 receiver (3.125Gb/s) - TYKO ZL60113 Transmitter (3.125Gb/s) Xilinx Mini-T Board: - AVAGO AFBR 810 TX (10Gb/s) - AVAGO AFBR 820 RX (10Gb/s) Channels selected: Ch#1: 350 mm of strip lines and 4mm of bonding wires + 4 pairs of vias Ch#2: 350 mm of micro strip lines and 2mm of bonding wires 2 pairs of vias bits sent without error Ch#1: 584mm of micro strip lines and 6mm of bonding wires + 4 pairs of vias Ch#2: 362mm of micro strip lines and 6mm of bonding wires + 4 pairs of vias bits sent without error BER 3.5Gb/s

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel17 Single pulse transmission

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel18 AFG3252 Pulse Generator Lecroy SDA13000 Serial Data Analyser GTK test board 300m fiber HP Pulse generator SINGLE pulse transmission from 0.05 to 100Mhz Optical transmitter: OCP (single mode) Finisar (multi mode) Measured with Photodiode

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel19 OCPFINISAR Below 1Mhz FINISAR optical transceiver starts to show irregularities on amplitude and offset and also in the form of the pulse. Good behavior of the OCP transceiver even with very low Frequency SINGLE pulse transmission from 0.05 to 100Mhz

December 13, Giga Tracker Working Group meeting M.Noy & M. Morel Conclusion GTK carrier board Delivery expected this week ; Clock distribution Both solutions tested and perform adequately up to 480 MHz; signal conversion, fan-out, full length PCB traces and bonding wires are all included in the measurements; OCP preferred to unify choice of fiber for control signals; Data transmission Tyco tested with 3.5Gb/s, full trace lengths (25-50 cm), and bonding wires; performance remains good even in most stringent cases; Single Pulse transmission OCP demonstrates good performance across whole range of repetition rates; Finisar exhibits variable offset and signal amplitude and sub-optimal pulse reconstruction in the lower part of the frequency range.

December 13, 2011Giga Tracker Working Group meeting M.Noy & M. Morel21 Next steps Integration of Ceramic and Silicon mock-ups with the GTK carrier Continue testing Data transmission with Multi Mode Optical attenuator which will be delivery early January Find and test a Photodiode with a very fast comparator (Evaluation board ordered, delivery time expected on 03/2012) and conclude the single pulse transmission tests.