BSOP 330 ASSIST Peer Educator/ bsop330assist.com FOR MORE CLASSES VISIT www.bsop330assist.com.

Slides:



Advertisements
Similar presentations
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Advertisements

Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
IES 371 Engineering Management Chapter 13: Forecasting
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Demand Management and Forecasting
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Demand Planning: Forecasting and Demand Management CHAPTER TWELVE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
1 Operations Management MRP Lecture 22 (Chapter 14)
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Operations Fall 2015 Bruce Duggan Providence University College.
Copyright 2013 John Wiley & Sons, Inc. Chapter 8 Capacity, Scheduling, and Location Planning.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Materials Requirements Planning
Lecture 3 Production Planning System Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Production Planning (Aggregate Planning). SOM 464: Manufacturing Resource Planning Study of the efficient allocation of resources (material, equipment,
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
BSOP 330 Entire Course All Discussion Questions, Lab Assignments, Quiz Case Study For more classes visit BSOP 330 Master Planning.
BUS 644 MART Peer Educator/ bus644mart.com FOR MORE CLASSES VISIT
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
DEVRY BSOP 209 E NTIRE C OURSE Check this A+ tutorial guideline at For more classes visit
DEVRY BSOP 209 W EEK 1 C ASE S TUDY 1 Check this A+ tutorial guideline at week-1-case-study-1 For more.
DEVRY BSOP 209 Week 7 Case Study 2 Check this A+ tutorial guideline at case-study-2 For more classes.
DEVRY BSOP 334 Complete Week 1 Check this A+ tutorial guideline at For more classes visit
DEVRY BSOP 334 Complete Week 4 Check this A+ tutorial guideline at week-4 For more classes visit
DEVRY BSOP 334 Complete Week 6 Check this A+ tutorial guideline at week-6 For more classes visit
DEVRY BSOP 334 Entire Course Check this A+ tutorial guideline at course For more classes visit.
DEVRY BSOP 429 C OMPLETE W EEK 5 Check this A+ tutorial guideline at For more classes visit
DEVRY BSOP 429 C OMPLETE W EEK 5 Check this A+ tutorial guideline at For more classes visit
DEVRY BSOP 429 C OMPLETE W EEK 5 Check this A+ tutorial guideline at For more classes visit
DEVRY BSOP 330 E NTIRE C OURSE I NCLUDES DQ' S, L AB A SSIGNMENTS, Q UIZ A ND C ASE S TUDY Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 1 L AB A SSIGNMENT P ROBLEMS 4.1, 4.5, 4.9 AND 4.11, PAGES Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 2 L AB A SSIGNMENTS C HAPTER F OUR P ROBLEMS 4.23, 4.27, 4.33, AND 4.35 Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 4 L AB A SSIGNMENTS C HAPTER 12, PROBLEMS 12.1, 12.5, 12.9, Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 5 H OMEWORK P ROBLEMS M ATER P RODUCTION S CHEDULE P ROBLEM 1, 2 AND 3 Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 5 Q UIZ Check this A+ tutorial guideline at 1.Question :(TCO 9,
DEVRY BSOP 330 W EEK 6 L AB A SSIGNMENTS C HAPTER 14, P ROBLEMS 14.1, 14.3, 14.9, Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 7 C ASE S TUDY F INAL Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 7 L AB A SSIGNMENTS C HAPTER 16, P ROBLEMS 16.1, 16.3, 16.5, AND 16.9 Check this A+ tutorial guideline at
DEVRY BSOP 330 W EEK 7 Q UIZ Check this A+ tutorial guideline at 1. (TCOs 5 & 12) Manufacturing.
BUS 644 Week 4 Assignment Inventory Control Inventory Control. Read the case study below “Harvey Industries”. Provide reasoning for the current financial.
ACCT 505 OUTLET Minds Online/acct505outlet.com
ACCT 505 OUTLET Your world-acct505outlet.com
BUS 307 CART Minds Online/bus307cart.com
Forecasting Methods Dr. T. T. Kachwala.
Chapter 4.
BUS 307 CART A Clearer path to student success/bus307cart.com
Chapter 16 Materials Requirements Planning
BSOP 326 Competitive Success-- snaptutorial.com
BSOP 334 Innovative Education--snaptutorial.com
BSOP 583 Innovative Education--snaptutorial.com
BUS 307 Possible Is Everything/snaptutorial.com
BUS 307Competitive Success/tutorialrank.com
BUS 307 HOMEWORK Education Your Life--bus307homework.com.
ACCT 505 OUTLET Lessons in Excellence--acct505outlet.com.
BSOP 326 Education for Service--snaptutorial.com
BUS 307 HOMEWORK Lessons in Excellence--bus307homework.com.
BUS 307 Education for Service-- tutorialrank.com.
ACCT 505 Lessons in Excellence / acct505.com
ACCT 505 HELP Education for Service-- acct505help.com.
BUS 644 Education for Service-- bus644.com. BUS 644 Entire Course (Ash Course) For more course tutorials visit BUS 644 Week 1 DQ 1 Ethical.
BSOP 326 Teaching Effectively-- snaptutorial.com
BUS 307 HOMEWORK Education for Service--bus307homework.com.
ACCT 346 Education for Service-- tutorialrank.com
BSOP 326 Inspiring Innovation-- snaptutorial.com
Presentation transcript:

BSOP 330 ASSIST Peer Educator/ bsop330assist.com FOR MORE CLASSES VISIT

BSOP 330 Entire Course All Discussion Questions, Lab Assignments, Quiz Case Study FOR MORE CLASSES VISIT BSOP 330 Master Planning All Weeks Discussion Questions Devry University BSOP330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages BSOP330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 BSOP330 Week 2 Southwestern Case study

BSOP 330 Master Planning All Weeks Discussion Questions (Devry) FOR MORE CLASSES VISIT BSOP 330 Master Planning All Weeks Discussion Questions Devry University

BSOP 330 Week 1 Lab Assignment Problems 4.1, 4.5, 4.9 and 4.11, pages (Devry) FOR MORE CLASSES VISIT Problems: 4.1, 4.5, 4.9 and 4.11, pages Problems: 4.1: The following gives the number of pints of type A blood used at Woodlawn Hospital in the past 6 weeks: a) Forecast the demand for the week of October 12 using a 3- week moving average. b) Use a 3-week weighted moving average, with weights of.1,.3, and.6, using.6 for the most recent week. Forecast demand for the week of October 12.

BSOP 330 Week 2 Lab Assignments Chapter Four Problems 4.23, 4.27, 4.33, and 4.35 (Devry) FOR MORE CLASSES VISIT Chapter Four Problems 4.23, 4.27, 4.33, and a) Compute MAD and MAPE for management’s technique b) Do management’s results outperform (i.e., have smaller MAD and MAPE than) a naive forecast? c) Which forecast do you recommend, based on lower forecast error?

BSOP 330 Week 2 Southwestern Case study (Devry) FOR MORE CLASSES VISIT Discussion Questions 1. Develop a forecasting model, justifying its selection over other techniques, and project attendance through What revenues are to be expected in 2006 and 2007? 3. Discuss the school’s options.

BSOP 330 Week 3 Lab Assignments Chapter 13 problems 13.3, 13.5, 13.9, (Devry) FOR MORE CLASSES VISIT Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system?

BSOP 330 Week 4 Lab Assignments Chapter 12, problems 12.1, 12.5, 12.9, (Devry) FOR MORE CLASSES VISIT Chapter 12, problems 12.1 L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An investigation of the company’s manufacturing facility in Charlotte yields the information presented in the table below. How would the plant classify these items according to an ABC classification system?

BSOP 330 Week 4 Quiz (Devry) FOR MORE CLASSES VISIT BSOP 330 Week 4 Quiz

BSOP 330 Week 4 Southwestern Case study Printing companies Programs and Inserts (Devry) FOR MORE CLASSES VISIT Southwestern University Case Study 1. For the programs, what are the EOQ's for both printing companies? How many orders of each size will be needed? 2. For the inserts, what are the EOQ's for both printing companies? How many orders of each size will be needed?

BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1, 2 and 3 (Devry) FOR MORE CLASSES VISIT BSOP330 Master Planning, Week 5, Problem 1 MASTER PRODUCTION SCHEDULE MAKE-TO-STOCK Beginning PAB prior to week number one is 500. If the forecast is larger than the book orders, complete the MPS using the forecast demand. If the booked orders is larger than the forecast complete the MPS using the booked orders

BSOP 330 Week 5 Quiz (Devry) FOR MORE CLASSES VISIT 1. Question : (TCO 9, 10, & 12) The MPS Student Answer: must sum up to the total in the production plan. can have any quantity necessary to meet customer demand. is only used in make-to-stock manufacturing. does not have to be tested for capacity limits.

BSOP 330 Week 6 Lab Assignments Chapter 14, problems 14.1, 14.3, 14.9, (Devry) FOR MORE CLASSES VISIT Chapter 14, problems 14.1 You have developed the following simple product structure of items needed for your gift bag for a rush party for prospective pledges in your organization. You forecast 200 attendees. Assume that there is no inventory on hand of any of the items. Explode the bill of material. (Subscripts indicate the number of units required.)

BSOP 330 Week 7 Case Study Final (Devry) FOR MORE CLASSES VISIT Question 1. Which variations in demand for police services should be considered in an aggregate plan for resources? Which variations can be accomplished with short-term scheduling adjustments?

BSOP 330 Week 7 Lab Assignments Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages 640) (Devry) FOR MORE CLASSES VISIT Chapter 16, problems 16.1, 16.3, 16.5, and 16.9 (pages ) 16.1 Leblanc Electronics, Inc., in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Larry Leblanc, to reduce inventory by introducing a kanban system.

BSOP 330 Week 7 Quiz (Devry) FOR MORE CLASSES VISIT 1. (TCOs 5 & 12) Manufacturing cycle time is best defined as the (Points : 4) length of the work shift, expressed in minutes per day. time it takes a unit to move from one workstation to the next. time between the start of one unit and the start of the next unit.

BSOP 330 ASSIST Peer Educator/ bsop330assist.com FOR MORE CLASSES VISIT