1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.

Slides:



Advertisements
Similar presentations
2010 HPRCT Presentation – Optimized Human Error Evaluation June 23 rd, 2010 Presenter: Terry J. Herrmann, P.E. Associate, Structural Integrity Associates.
Advertisements

Museum Presentation Intermuseum Conservation Association.
MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
INPO Update CMBG Meeting June 2013
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
1 Supplier Improvement Program PIA Government Systems Meeting Lexington, KY 6 August 2010.
NAVAL REACTORS PROGRAM TMDE Status
1 CMBG 2009 The Vendor Connection Engineering Human Performance June 29, 2009 Raymond Pace Entergy – Pilgrim Station.
Continuous Value Enhancement Process
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
ICASAS305A Provide Advice to Clients
The role of Obsolescence Management in reducing the threat of Counterfeits Stuart Kelly Anti Counterfeiting Forum 19 th February 2015.
Chapter 10 Systems Operation, Support, and Security
PURPOSE OF DFMEA (DESIGN FAILURE MODE EFFECTS ANALYSIS)
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Configuration Management for Transportation Management Systems Establishing and Maintaining System Integrity.
Basics of Good Documentation Document Control Systems
1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.
NASFAA 2003: Reconnecting With Students! 2 FSA Assessments: A Key to Compliance & Improvement Session #: S106.
Solution Overview for NIPDEC- CDAP July 15, 2005.
NANC Report Numbering Oversight Working Group (NOWG) January 19, 2005 Co-Chairs: Rosemary Emmer, Nextel Karen Riepenkroger, Sprint.
Presented by Joan Kossow Data Compliance Manager The Changing Face of Claims Processing &
April 2010 Copyright © 2010 Mississippi Department of Education Mattie T. Updated Timeline and Goals.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
© The Johns Hopkins University and The Johns Hopkins Health System Corporation, 2011 Using the Online HSOPS & RC Apps for CSTS Armstrong Institute for.
Food Safety Regulation and Standards
Regulatory Streamlining Implementing the Task Force Recommendations March 26, 2013 Regulatory Streamlining Implementing the Task Force Recommendations.
Comprehensive Review of the Public Safety Communications Center Phase 2 Report County of Dane, WI February 12, 2009.
Travel Website Enhancement Project Project Update First Name Last Name.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
2007 CMBG Conference David Hembree Institute of Nuclear Power Operations June 20, 2007 Charleston, SC INPO Perspective on Configuration Management.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Computer Scoring Le Grand Concours 2011 and beyond.
Project Status Report Presenter Name Presentation Date.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
Research & Technology Implementation TxDOT RTI OFFICE.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 Meeting on April 18, 2013 Washington DC Workshop on a Joint HDPE Roadmap for Current and Future Service.
Obsolescence Impact on Configuration Management
IBM Software Group ® Reseller of Transaction Changes to Reseller of Record May 2006 Release.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
John Maciejewski INPO I am John Maciejewski
Project Management Methodology
TGDC Meeting, July 2010 Report of the UOCAVA Working Group John Wack National Institute of Standards and Technology DRAFT.
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
Nuclear Standards for Polymeric Piping Aaron Forster, NIST Engineering Laboratory NIST, MS Bureau Drive Gaithersburg, MD (301)
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
2006 CMBG Conference Keith A. Reinsmith PPL Susquehanna 2006 CMBG Conference June 11-14, 2006 Richmond, VA Configuration Management Awareness Training.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
HIPAA Summit Practical Approaches to Sticky Payer Issues April 26, 2002 Bob Perlitz, AVP, HIPAA Compliance Officer.
2006 CMBG Conference BREAKOUT 2: Electronic Approval & Authorization Including E-Signatures John Parler South Carolina Electric & Gas & Diane Derr PPL.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Appending appending is a pre-requisite for developing marketing success; it creates multi-channel touch indicate connect to customers.
Standard Design Process Overview
EPRI Update Procurement and Supply Chain
Software Project Configuration Management
Let the IMPS program help you with your obsolescence!
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
DOE Nuclear Safety Research and Development Program
Fix it or Forget it? Dealing with Troubled Projects
Configuration Control and the Standard Nuclear Performance Model
Margin Management Configuration Management Benchmarking Group
Coordinate Operations Standard
IT Next – Transformation Program
Presentation transcript:

1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas

2 CMBG 2009 For the Uninformed here is the answer to all your obsolescence issues.

3 CMBG 2009 Obsolesence – What? Our Plant defines obsolescence as material that is still required to operate the plant but is no longer available or is hard to obtain (soon to be unavailable). Materials obsolescence directly impacts the ability to have needed spares to support plant operations.

4 CMBG 2009 Is it a real concern? The Nuclear Utilities Obsolescence Group (NUOG) developed the Proactive Obsolescence Management System (POMS) through PKMJ Technical Services to identify items. A download of all plant equipment with model numbers was done, PKMJ contacted the manufacturer of each specific model number and asked if they were still supported.

5 CMBG 2009

6 CMBG 2009

7 CMBG 2009

8 CMBG 2009 The Results (as of 2005) Total Equipment numbers 631,000 Equipment with no model 199,000 Waiting on manufacturer 273,000 Response from manufacturer 159,000 Bad model information 54,000 Obsolete 34,500 Still available 70,500 »Numbers are approx.

9 CMBG 2009 What that means As an industry for the identified equipment: We don't know what 31% of our equipment really is. We know that only 11% is still supported by the manufacturer 22% of the equipment that we have received a response from the manufacturer on, is obsolete

10 CMBG 2009 Is it better today?

11 CMBG 2009

12 CMBG 2009 What is being done? Concern was identified by Supply Chain initially and NUOG was formed (2/2000) With the help of RAPIDS the “Obsolete Items Replacement Database” (OIRD) was established Joint efforts between utilities addressed specific concerns Increased industry awareness expanded involvement to include more engineering

13 CMBG 2009

14 CMBG 2009

15 CMBG 2009

16 CMBG 2009 Available Guidance NX-1037 was produced by NUOG and distributed by INPO which outlines a basic program (12/2003) In November of 2008 EPRI issued report # which built on NX-1037 and provided specific recommendations for program development and ownership Current EPRI has a task team working on additional enhancements to their guidance

17 CMBG 2009 VCS Specific Program Overview Our program originally implemented in 2002 and we are currently on revision 3 with revision 4 in development It is based on the direction in NX-1037 It is a Station Administrative Procedure since it impacts multiple departments. SAP-1287

18 CMBG 2009 VCS Specific The program is "owned" by our Materials Group, who administer the process It does not matter who owns the program as long as there is a defined lead When an item is determined to be obsolete it is entered into our Corrective Action Program It is coded as obsolete and assigned to Materials

19 CMBG 2009 VCS Specific The potential impact of the obsolescence is determined and scored under our Plant Health Committee process The process is documented and tracked under our CAP program Actions are assigned to Materials to: –Update the OIRD for industry sharing –Identify replacement options

20 CMBG 2009 VCS Specific The options considered for resolution include: –Identification of an available equivalent replacement –Location of an after market supply –Reverse engineering the item –Modification to the plant

21 CMBG 2009 VCS Specific When a recommended solution has been determined by Materials it is sent to Plant Support Engineering for concurrence This review is to assure that the solution is in line with the long term plans for the system The solution is then incorporated into the schedule and worked based on its priority

22 CMBG 2009 VCS Specific If the solution is determined to be: –An equivalency the action is assigned to Materials (Procurement Engineering) to process –Reverse engineering Materials has the lead with support from PSE –A modification PSE has the lead to provide the project recommendation and submit it to Design Engineering

23 CMBG 2009 VCS Specific We found that the simple equivalency resolutions were able to be worked fairly quickly When setting the PHC score a major input is when the impact is expected and most obsolescence issues don't involve a current failure If the resolution involved a modification it normally does not have a high enough PHC score to be worked proactively

24 CMBG 2009 VCS Specific Recently we made a change to our PHC process because of the issue of not being able to proactively resolve these issues We now target obsolescence issues on our Plant Focus List for resolution, even when they score lower than other risks Currently two of the eleven items on our Focus List are proactive obsolescence items

25 CMBG 2009 VCS Specific Currently our challenge is the fact that the POMS data that we received indicates that 24% of our equipment is obsolete This equals over 7,200 components and our current process is not designed to address that large an input. One reason why we are currently developing a process revision

26 CMBG 2009 Summary The issue is major and growing bigger everyday As we upgrade our equipment most everything that is produced today has some digital component The Department of Defense has done detailed studies on the concern and the following graph shows the average timeline for a digital system The times are inline with what is expected at a nuclear plant

27 CMBG 2009

28 CMBG 2009 Summary It is not important who coordinates your program, what is important is that you have a defined program with a defined lead Programs that involve numerous organizations without a responsible lead tend to fail. Obsolescence is a Plant concern not just Materials or Engineering

29 CMBG 2009 Questions?