Throughput-time reduction and First Time Right production for the thermoform industry by introducing a predictive mould design and manufacturing system.

Slides:



Advertisements
Similar presentations
To find out more or to apply, please visit our career portal and post your CV. goodyear-dunlop.com/career The Opportunity Develop and apply skill to analyze.
Advertisements

Intern. Learning Platform on Int. Cooperation ERA-NET calls Brussels, September 24, 2009.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
H-KNOW NMP Advanced Infrastructure for Knowledge Based Services for Buildings Restoring Project Overview FSMLR/LABEIN Dr. Mikel Sorli.
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Individul Project: NPD-NET Component 4: Integration and Regional Adaptation of NPD Roadmap Kick-off meeting Region of Central Macedonia – URENIO Research.
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
Malta Council for Science and Technology Seventh Framework Programme (FP7) 15 July, 2008 Anthea Frendo FP7 National Contact Point.
Getting European Research Funds Dr Philip Griffiths Associate Head of School, Built Environment Centre for Sustainable Technologies University of Ulster.
University of Trieste PHD school in Nanotechnology Writing a proposal … with particular attention to FP7 Maurizio Fermeglia.
PERFORMER WP2 INTRODUCTION 13th of September 2013 CSTB Sophia Antipolis, France.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS WP5: “Integration and Usability validation of models”
WP3 - Proceedings Consortium Meeting, Graz (27. – ) Peter Wintersteller Iris Pein.
FP6 Non priority-specific activities. 2 Marie Curie fellowships fellowships for researchers to do research projects in another country than their own.
IST Programme project IST CELEBRATE Context e-Learning with Broadband Technologies.
The Relevance of Pro4Plast Bernd Altendorfer / Polyconcent.
Presentation Workpackage 3 simcon, Dr. Paul F. Filz.
World Congress and Expo on Recycling
1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Overview of activities of the first six months and of the.
CADIC Project Overview Cross-Organizational Assessment and Development of Intellectual Capital Kick-Off Meeting 21st September 2010, Brussels Scientific.
European Commission Competitiveness and Innovation Framework Programme (CIP)
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
Practical aspects Dr. Ir Matthijs Soede Senter/EG-Liaison “Practical Aspects of Preparation FP6 projects Poznan - 21 November 2002 Dr. Ir.
Framework of the Project Project on Dissemination of Quality/Productivity Improvement (KAIZEN) Practice for Small and Medium Enterprises in Jordan Japan.
VIRTUAL INFORMATION AND KNOWLEDGE ENVIRONMENT FRAMEWORK IP-FP
Josefina Lindblom European Commission DG Research - Unit T4: SMEs SMEs in the.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Science, research and development European Commission IDARI Project Meeting Tartu, June 2005 Martin Greimel Scientific Officer Directorate-E ‘Biotechnology,
RISK AWARE TITLE : RISK – Advanced Weather forecast system to Advise on Risk Events and management ACRONYM : RISK AWARE Duration: 36 months Status: Running.
Knowledge Transfer Programme: An Overview Marc Fleetham Director Business Solutions.
| Collaboration at Rural Business Approach.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
ELOGMAR-M Review Meeting, Shenzhen, 31/03/ First Review Meeting - Web-based and Mobile Solutions for Collaborative Work Environment with Logistics.
EUREKA UMBRELLA PROJECT: Technologies for a Sustainable and Competitive Construction Sector E! 3790 EUREKABUILD Closing EurekaBuild Achievements so far.
Presented To: Dr. Dina Rateb MOIS 549 Class Presented By: Karim Aguib.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
1 Bill Prymak, US Department of Energy Golden Field Office February 19, 2009 Energy Assessments: What are the Benefits to Small and Medium Facilities?
Erasmus for Young Entrepreneurs H ow to make the EU more entrepreneurial Christian WEINBERGER, Senior Adviser - Entrepreneurship & SME Policy European.
European Commission Research 1 Participation in the EU 6th Framework Programme for Research and Technological Development Peter Härtwich, DG Research,
© 2004 The IPR-Helpdesk is a project of the European Commission DG Enterprise, co-financed within the fifth framework programme of the European Community.
EVA Leonardo Project Synthesis of Intermediate Results February 2011 mettre logo europe.
Slide 1 Eurostat Unit B3 – Statistical Information Technology XBRL pilot Task Force 27 September 2006 Status of XDIS/XBRL pilot project Giuseppe Sindoni.
Jörg Niehoff European Commission DG Research - Unit T4: SMEs SMEs in the.
Erwin Laure ScalaLife Project Director.
Practical Aspects of Preparation FP 6 projects Senter/EG-Liaison Nationaal Contact Punt voor het 6de Kaderprogramma Sandra de Wild 11 december 2002.
FOSTERING INDUSTRIAL SYMBIOSIS FOR A SUSTAINABLE RESOURCE INTENSIVE INDUSTRY ACROSS THE EXTENDED CONSTRUCTION VALUE CHAIN This project has received funding.
H2020 The EU Framework Programme for Research and Innovation.
Contract No: COLL-CT SMEs Throughput-time reduction and First Time Right production for the thermoform industry by introducing a predictive.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
High Performance Injection Moulding Contract No: COLL-CT SMEs National Meeting, Bruxelles, October 20 th 2006 Denis Gravet CRIF.
Throughput-time reduction and First Time Right production for the thermoform industry by introducing a predictive mould design and manufacturing system.
The Alberta Centre for Advanced Micro and Nano Technology Products Speeding the Path From Prototype to Commercial Product Ken Brizel CEO, ACAMP
Grant n° FP  Duration: 3 years  Type: Collaborative research project  Funding: ◦ Budget: € ◦ Funding: € ◦
1 Open Discovery Space Overview Argiris Tzikopoulos, Ellinogermaniki Agogi Open Discovery Space [CIP-ICT-PSP ][elearning] A socially-powered and.
High Performance Injection Moulding Contract No: COLL-CT SMEs High Performance Injection Moulding Contract No: COLL-CT Hipermoulding.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Throughput-time reduction and First Time Right production for the thermoform industry by introducing a predictive mould design and manufacturing system.
ADDITIVE MANUFACTURING PROJECT CLUSTER MEETING Design for Additive Manufacturing (DfAM) Fundació CIM C/Llorens i Artigas, 12 Parc Tecnològic de Barcelona.
Piero Belforte, HDT, MERITA project 2000: objectives, activities and results by Carla GIACHINO .
1 Consortium 7 European countries Spain (6) Greece (5) Italy (5)
Introduction and the role of ISPT
HOLISDER Integrating Real-Intelligence in Energy Management Systems enabling Holistic Demand Response Optimization in Buildings and Districts Project presentation.
Civil Protection Financial Instrument – Prevention Projects
e-Invoicing – e-Ordering 20/11/2008
CORA ESSNet COmmon Reference Architecture starting ...
Presentation transcript:

Throughput-time reduction and First Time Right production for the thermoform industry by introducing a predictive mould design and manufacturing system SMEs Contract No: COLL-CT General Project Overview Contract COLL-CT (T-ForM)

2 Agenda of the meeting 10h00 Introduction (Dirk De Moor, Agoria) 10h10 Overview of the project and of the work achieved (J.Lecomte, CRIF) 10h30 User interface of the T-FORM simulation software. Characterisation tests on the materials (Robert Hick, CRIF) 11h00 Open discussion over the questions raised at the last meeting. Questions and answers. 11h45 Administrative issues 12h00 End of the meeting

3 Content History and project summary T-ForM approach Industrial involvement Know-how and dissemination Project organization How you can participate

4 Definition Collective Research: Research carried out by RTD performers, on behalf of Industrial Associations, to improve the knowledge base and competitiveness of large Groupings of Small and Medium Sized Enterprises. Available budget: 2-5 Million Euro Participation of an excellent consortium is requested Industrial Associations are owners of developed knowledge and Intellectual Property Rights

5 History + 5 YEARS Duration Possible audit 2013 Preparation Stage 1 3 YEARS End Preparation 12 M Waiting 10 M Start

6 Project Summary Consortium:6 IAGs, 13 Core-SMEs and 7 RTDs Start:1 st September 2005Duration: 36 Months Budget: 4.58 M€Grant: 2.85 M€ Objective: Development and dissemination of know-how in order to reduce Throughput Time and achieve First Time Right Production for the thermoform industry by introducing a predictive mould design and manufacturing system

7 Pre-production State of the art : Product design Mould design Production Mould manufacturing Thermo- forming What about possibilities and limitations material & process? Design geometry different from / usable for CAD design? Time consuming step and what about data exchange? Production Market requires improvements (cost-effective, leadtime, properties and dimensions) What about (optimized) process settings? Result not satisfactory? a magic touch is required !

8 Digital Machine information Material Part requirements Mould design Simulation Process settings (T03) Design guidelines (T01) Product design Digital T-ForM module (T02) Thermoforming Mould manufacturing Production Mould

9 Machine information Material Part requirements Mould design Simulation Process settings Design guidelines Product design Digital T-ForM module WP1 Modelling theory WPL Univ. Stuttgart WP2 Algorithms PMS WPL TNO WP3 Pred. Mould Syst. WPL ASCAMM WP4 Validation WPL CRIF WP5 Diss. And Exploitation WPL GTMA WP6 Training WPL RAPRA WP7 Cons. Management WPL TNO Algorithms for predictive thermoform settings Algorithms for predictive mould design Prototype software tool proving the predictive mould design and thermoform setting algorithms Validation of prototype software tool by performing 4 real life case studies Modelling theory Implementation of modelling theory in adapted Production Simulation software Guidelines for the design of thermoformed parts T-ForM methodology for industrial use Predictive mould design software tool enabling the T- ForM approach Validate the new costs, throughput time and energy consumption. Proof of meeting the technical objectives; compare the results with existing data on product and mould development time, cost analyses etc.

10 Benefits to participants Preferential access to new thermoforming process knowledge and technical developments in form of: Best practise guidance Training Software tools Collaboration with highly regarded and authoritative research establishments Company exposure at exhibitions

11 Industrial involvement Real industrial cases Extensively produced thermoforming parts used for validation Representative thermoplastics chosen by core SMEs Proof of research results In depth analysis of different cases driven by European Thermoforming Industry Comparison of conventional methodology Validation of the software using a range of SMEs Considerations Throughput time and cost analysis Full thermoforming process chain is covered

12 Dissemination activities Quarterly National dissemination meetings Latest project results presented Opportunity for participating SMEs to have their say Yearly dissemination days Report on achievements of project Demonstration facility Each country will have a demonstration facility Training Training modules will be developed, which will be used to train company staff

13 Work achieved today WP1: Report on process settings and materials properties: Still to be finished (take into account plug-assist cases) WP2: Algorithms for predictive mould settings: Choice of the platform, first software prototype (skeleton) WP4: Check list for the choice of the six validation cases. Research ongoing on existing software tools.

14 Project partners IAGs: KC (AU) PVT (NL) FEAMM (ES) GKV (DE) GTMA (UK) AGORIA (BE) Core-SMEs: Jacob Kunststoffe (DE) Unipa Kunststoffe (DE) Accuform (CR) Batelaan Kunststoffen (NL) Haarlemse Modelm. (NL) Linecross (UK) Midas (UK) Omniform (BE) Sabert Europe (BE) Decorchapa (ES) Plasvina (ES) Missler software (FR) Marcus Pammer (AU) RTDs: University Stuttgart (DE) TNO (NL) ASCAMM (ES) CRIF (BE) RAPRA (UK) AIMPLAS (ES) PERA (UK)

15 Jacky Lecomte CoordinatorScientific Officer Jan Willem Gunnink Yves Maisonny