SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 3: Performance Task Leader: Paul Green.

Slides:



Advertisements
Similar presentations
SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 2: Driving Task Demand Task Leaders:
Advertisements

1 SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 8: Intent Matthew Smith Aug 12, 2003.
IHRA-ITS UN-ECE WP.29 ITS Informal Group Geneva, March, 2013 Overview of International Activities to Limit Distraction Document No. ITS (21st ITS,
EMS/Trauma Registry Quarterly Update (June, July, August) August 13,
Test & Evaluation Master Plan (TEMP) Overview
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
USER DOCUMENTATION (Part of the development phase of the PSM) Mark Kelly
Measuring Cognitive Distraction in the Vehicle Joel Cooper Precision Driving Research David Strayer University of Utah.
International Journal of Industrial Ergonomics 35 (2005) 939–953 Situation awareness and workload in driving while using adaptive cruise control and a.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
Fall Graduate Seminar CHEM 691 Welcome Address from GPD.
RIS Research Consultation Outcome Survey Report to Public Services Council on the Pilot January 19, 2006 This report, the web questionnaire and related.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
Visual 5.1 Briefings Unit 5: Briefings. Visual 5.2 Briefings  Describe components of field, staff, and section briefings/meetings.  Plan to give an.
System Implementation
USE OF VISUAL OCCLUSION TO ASSESS IN-VEHICLE HMI Dean P. Chiang Dynamic Research, Inc., Torrance, CA 22 May 2003 ITS America Annual Meeting, Minneapolis.
ETSC Best in Europe Conference 2006 Changing Human Machine Interfaces Towards the development of a testing regime Samantha Jamson University of Leeds.
1 of 39 DQO Implementation Process: Flow Chart and Wall Charts 30 minutes DQO Training Course Day 2 Module 8 Presenter: Sebastian Tindall.
Driver Distraction: Results from Naturalistic Teenage Driving Studies Charlie Klauer, Ph. D. Research Scientist Group Lead: Teen Risk and Injury Prevention.
Voluntary Standards Development of Advanced Safety Systems
The Driver and Pedestrian Distraction Challenge Diane Wigle Safety Countermeasures Division National Highway Traffic Safety Administration (NHTSA) April.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Assignment 8 information
Chapter 16 Structured Systems Analysis. Learning Objectives Know goals, plans, tasks, tools, & results of systems analysis Understand/appreciate costs.
22C:082:001 Human-Computer Interaction. Fall Copyright © 2013 Juan Pablo Hourcade. 1 Group Project Phase 1.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Company Logo Add Your Company Slogan On the highway measures of driver glance behavior with an example automobile navigation system Dean P. Chiang*, Aaron.
Curriculum and Instruction iSupport Platform Presentation August 15, 2014.
WORKFLOW. What is workflow A system to manage and monitor working processes Defining and tracking the flow of work between individuals and/or departments.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 6: Telematics Task Leaders: Paul Green.
September 25, 2013 Greg Davis FHWA Office of Safety Research, Development and Test Overview of V2I Safety Applications.
Systems Analysis and Design in a Changing World, Fourth Edition
SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 1: Scenario Identification Task Leader:
Status of ITS research May Peter Sweatman David Kapp.
Toward a Multi-State Consensus on Rural Intersection Decision Support: Objectives u Gain understanding of issues involved with national rural intersection.
August 2005 TMCOps TMC Operator Requirements and Position Descriptions Phase 2 Interactive Tool Project Presentation.
Conducting Surveys Presented by: Kay Lam Gallaudet Research Institute address:
Issues in Evaluation Criteria Document November 15, 2006.
1 SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 9: Safety Warning Countermeasures.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
1 SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Overview Gerald Witt & Harry Zhang August.
Research on HMI Homework item 1 (ACSF-01-13)
SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 4: Distraction Mitigation John D. Lee.
EDGE™ Concept Level Project Plan P08210/11 – Ruggedization of a Data Recorder for a Forklift Truck Shadle Stewart ME Rick Chadwick ME.
©2012 RAY SVENSON CONSULTING, INC. 1 PHASE 2: DATA COLLECTION Why do data collection? Three categories of data collection:  Business Requirements —Business.
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Irish Forest Roads Update ROADEX Partnership Network Dr Robert Leonard Agricultural Inspector - Engineering 5 th April 2016.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
Presented by Sonya Stephens, PhD Common Core Summer Institute August 6, 2013.
For More Best A+ Tutorials PSYCH 610 Entire Course(UOP) PSYCH 610 Week 1 Individual Assignment  PSYCH 610 Week 1 Individual Assignment.
In-Vehicle Driver Distractions & Eye Movements
Managing the Project Lifecycle
Systems Analysis and Design
Shore Safety Specialist
1 3.
Initial Presentation Group 4
1. Overview. 1. Overview 1. Overview 1. Overview.
Producer Process Overview
Proposed RISC 2014 Deliverables, Activities, and Calendar
Effective Project Management: Traditional, Agile, Extreme
Safety Assessment of Automated Vehicles
Work plan and next steps – RDE-LDV working group
Presented by (Abdisamad Abdullahi Abdulle)
Third Grade Mrs. Johnson’s Sept , 2016 What We’re Learning
Working Group “Real-Driving Emissions of Light-Duty Vehicles” Work Progress – December
WORKSHOP Establish a Communication and Training Plan
Presentation transcript:

SAVE-IT SAfety VEhicles using adaptive Interface Technology Phase 1 Research Program Quarterly Program Review Task 3: Performance Task Leader: Paul Green

SAVE-IT Task 3: Performance u Objective: Determine measures performance measures that are diagnostic of distraction u Staffing: 3A: Green (0.8), grad (4) 3B: Green (1.39), Mayer, Zylstra=grad (7.65), undergrad (6.65) u Deliverables 3A: Literature Review (fall 03) 3B: Technical report (October 03)

SAVE-IT u Schedule u Experiment –May-July: Prepare test vehicle, plan route –August: Collect pilot and test data –August: Reduce data –September: Write report u Literature review –May-November: Assemble literature & produce report u Note: Because the start was shifted from Sept 02 to Feb 03, staff were not available until May 03. To complete phase 1 on time, the order of the lit reviews (which we know but need to summarize for others) and the experiments was reversed. The on- road experiment had to be finished during good summer weather & experiment 2b had to be completed before the start of 6b in fall of 03. These changes will have no impact on output quality or cost. Task 3: Performance

SAVE-IT Task 3a Performance Literature Review u Issues: 1. Based on the literature, which measures of driving performance (longitudinal control, lateral control, headway, etc.) are possibly affected by driving workload, how, and by how much? 2. What are typical values (mean, s.d., distribution type, etc.) for those measures?

SAVE-IT u Approach: u Look at previous summaries (e.g., Green, 1994) u Search UMTRI library and personal files u Develop scheme to select articles & prioritize; Summarize in table u Include stats for each measure by study (mean, s.d., etc.) & condition u In early stages Task 3a Performance Literature Review

SAVE-IT Task 3b: Identify Diagnostic Measures u Activities: u IRB approved u Prepared instrumented vehicle (lane tracker, headway sensor, u speed sensor, acquired & installed eye fixation system) u Route selected on public roads (mixed 2 lane & expressway) u Developed instructions & forms u Developed in-vehicle tasks u Conducted pilot test u Start main experiment in about 1 week (16 test subjects; , )

SAVE-IT Task 3b: Identify Diagnostic Measures u 3-Visual Manual Tasks u primary distraction u needed tasks that could be quickly prototyped meet schedule, budget u link to other UMTRI data & studies u only a few tasks to stay within time limit for 1 session & obtain u sufficient replications of each task in each condition u Radio tuning - in AAM guidelines as benchmark u Phone dialing - commonly used benchmark u Destination entry - relevant to SAE J2364, J2365

SAVE-IT Task 3b: Identify Diagnostic Measures

SAVE-IT Task 3b: Identify Diagnostic Measures Radio Interface (Tuning)

SAVE-IT Task 3b: Identify Diagnostic Measures Phone dialing

SAVE-IT Task 3b: Identify Diagnostic Measures Navigation-destination entry

SAVE-IT Task 3b: Identify Diagnostic Measures

SAVE-IT Task 3b: Identify Diagnostic Measures

SAVE-IT Task 3b: Identify Diagnostic Measures Show clips u tuner/dialing u destination, incorrrect u on road