November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 1 Status and plans of R&D for DHCAL in Russia Vladimir Ammosov Institute for High Energy Physics.

Slides:



Advertisements
Similar presentations
Particle rate in M1 and M2 Muon Meeting
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Digital Hadron Calorimetry using Gas Electron Multipliers Andy White University of Texas at Arlington.
4 November 2002Paul Dauncey - CALICE News1 News from CALICE Paul Dauncey Imperial College London.
Beam Position Monitors MICE CM Harbin January, 2009.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
30 October 2002Paul Dauncey - CALICE/PRC1 PRC – CALICE Progress Report Paul Dauncey, Imperial College London Representing the CALICE Collaboration.
Report from the the CALICE Collaboration 164 Physicists 26 Institutes 9 Countries 3 Regions José Repond Argonne National Laboratory CA lorimeter for the.
October-November 2003China - ALICE meeting1 PHOS in ALICE A PHOton Spectrometer with unique capabilities for the detection/identification of photons and.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Simulation of RPC avalanche signal for a Digital Hadron Calorimeter (DHCAL) Lei Xia ANL - HEP.
November 5, 2004V.Ammosov ITEP-Moscow, Russian CBM meeting 1 IHEP possible participation in CBM TOF system Vladimir Ammosov Institute for High Energy Physics.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
V. Ammosov 13th CBM meeting,GSI,March 10 1 Beam test of pad tRPCs with ultra-thin glass Status of IHEP+INR activity for high rate RPCs.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Diego Gonzalez Diaz University of Santiago de Compostela ITEP IHEP (Protvino), ITEP (Moscow), INR (Moscow), LIP(Coimbra), USC(Santiago de Compostela)
June 1, 2007V.Ammosov, LCWS2007/ILC2007 DESY Hamburg 1 Status of gaseous DHCAL R&D in Europe Vladimir Ammosov, IHEP – Protvino IPNL,LAL, LAPP, LLR, SACLAY.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
Contents Overview of 150 MeV FFAG Accelerator
CBM -Russia meeting, ITEP, 5 November 2004 DEVELOPMENT OF LOW RESISTIVE GLASS FOR HIGH RATE RPC F.Guber, INR, Moscow C B M.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
July 8, 2003V.Ammosov GSI, CBM meeting1 RPC TOF system for HARP experiment (Applicability for CBM) Vladimir Ammosov Institute for High Energy Physics Protvino.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
NASA 2001 Mars Odyssey page 1 Workshop HEND Russian Aviation and Space Agency Institute for Space Research Present knowledge of HEND efficiency.
1 Participation of the Joint Institute for Nuclear Research (Dubna) in PANDA experiment at Future GSI Facility Nuclear Structure Physics Physics with Antiprotons.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
November 15-18, 2002V. Obraztsov - Prague ECFA/DESY Workshop 1 Proposal for TESLA beam test zone at IHEP ( Protvino ) Vladimir Obraztsov Institute for.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
A Hadron Calorimeter with Resistive Plate Chambers José Repond Argonne National Laboratory CALOR 2006, Chicago, June 5 – 9, 2006.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Julie Prast, Calice Electronics Meeting at LAL, June 2008 Status of the DHCAL DIF Detector InterFace Board Sébastien Cap, Julie Prast, Guillaume Vouters.
Proposal of a digital-analog RPC front-end for synchronous density particle measure for DHCAL application R.Cardarelli and R.Santonico INFN and University.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
WP 13 Task Develop a complete system of large size RPC (single- gap/multi-gap) with timing capability better than few hundreds ps. This includes.
Recent test results of TGEM-Prototypes in INR, Moscow V.I.Razin, А.B.Kurepin, B.M.Ovchinnikov, A.I.Reshetin, E.A.Usenko, S.N.Filippov, D.A.Finogeev Institute.
V.Duk, INR Moscow Quarks-2008, May OKA Experiment for Studying Rare Kaon Decays Viacheslav Duk, INR Moscow for collaboration.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
PPAC Jonathan Olson University of Iowa Thesis Defense 8 April 2005.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
Trigger & Tracking detector for CMS
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
A high rate fast precision tracking trigger with RPCs
RPC with strip readout Last results from test of timing glass
The European DHCAL status
Digital HCAL readout studies
A proposal to equip the high eta muon stations with High Rate GRPC
DHCAL TECH PROTO READOUT PROPOSAL
Status of the DHCAL DIF Detector InterFace Board
GRPC activity for EuDHCAL in IHEP-Protvino
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
HYCAL Overview We started from the design.
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Presentation transcript:

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 1 Status and plans of R&D for DHCAL in Russia Vladimir Ammosov Institute for High Energy Physics Protvino Moscow region, Russia

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 2 Content 1. Tuning of RPC performance 2. RPC design for DHCAL 3. RO electronic activity 4. R&D plans

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 3 Tuning of RPC performance Use glass for anode and cathode ( standard RPC) Decrease the charge in the gas gap Consequences: Possibility to diminish ageing effects Possibility to increase maximal rate Joint adjustment of RPC and RO electronics Decision

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 4 Tuning of RPC performance

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 5 Tuning of RPC performance

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 6 Tuning of RPC performance - It seems that tuning should be done around basic TFE/ISO mixture - It is intended to study (10-100) pC region withh possibility to work at 50 mV threshold

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 7 RPC design for DHCAL

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 8 RPC design for DHCAL

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 9 RPC design for DHCAL Dead zones

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 10 RO electronic activity General scheme for 64 channel read out Two parts: 1.Conditioning (analog) 2.FPGA (digital)

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 11 RO electronic activity Steps for design and usage Approaches for conditioning - Comparators - Protvino - Trans impedance amplifiers (TIAs) - Minsk

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 12 RO electronic activity Conditioning - comparators

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 13 RO electronic activity Conditioning - comparators

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 14 RO electronic activity Conditioning - TIAs

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 15 RO electronic activity Conditioning - TIAs

November 15-18, 2002V.Ammosov Prague ECFA/DESY Workshop 16 R&D plans design and tests of approach-0 for RO electronics (step 1) Dec02 tuning of RPC performance to Dec02 decrease the gap charge design of a small RPC plane Dec02 construction of this plane with a few hundred RO channels (step 1) Mar03 beam tests of this plane in IHEP Apr03