Columbus Airport Authority We’re Really Taking Off! November 6, 2002.

Slides:



Advertisements
Similar presentations
Airport Planning and Design
Advertisements

Cheyenne Regional Airport New Airport Terminal Project December 1, 2011.
DRO AIRPORT TERMINAL EXPANSION Alliance Presentation – April 2013.
Burbank Bob Hope Airport Replacement Terminal and Opportunity Site Development October 28, 2013.
Tuesday, February 8, 2011 GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E. GOAA CONSTRUCTION Upcoming Projects Mike Patterson, P.E.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Public Border Operators Association Border Infrastructure Project Updates Canada – United States Transportation Border Working Group Meeting April 19 –
Infrastructure In Nunavut What we have and What we need Nunavut Mining Symposium April 17,2012 Presented by Rhoda Katsak Director Community Operations.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
AIRPORT A complex of runways and buildings for the
CITY HALL MATRIX AIRPORT PROSCONSDATA Existing Offices Existing Chambers Furniture in place Data/com in place Current EOC Sufficient Parking FAA timeline.
Anaheim Regional Transportation Intermodal Center Project Update.
Ballina Byron Gateway Airport Presentation November 2012.
2009 PACIFIC AVIATION DIRECTORS’ WORKSHOP May 4 – 6, 2009
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Washington Dulles International Airport
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
International Airport. LOCATION: On Jamaica Bay in the southeastern section of Queens County, New York City. The airport is located 15 miles by highway.
Chris Jones, Public Affairs & Marketing Manager Clark County Department of Aviation Oct. 8, 2012 McCarran International Airport – Gateway to Las Vegas.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Working Paper One/ Study Committee Meeting May 2015.
Current Construction Projects Major Projects Pinellas County.
Maryland Transportation Builders & Materials Association Paul L. Shank, P.E.,C.M. Chief Engineer November 14, 2014 October 30, 2014.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Good Afternoon!. Construction Update Airside Center Roof Construction began in May Currently 45% complete Scheduled Completion is December.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Federal Aviation Administration Friedman Memorial Replacement Airport EIS Date: August 6, 2008.
Kelowna International Airport 2010 Development Program September 17, 2007.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Dane County Department of Public Works, Highway & Transportation Jerry Mandli, P.E. Commissioner/ Director.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
St. Pete-Clearwater International (PIE). St. Pete-Clearwater Int’l Airport Enterprise operation supported by our own revenue sources * No county, state.
Successfully Diverse Partnerships = Economic Impact ACEC Indiana 10 th Annual Diversity Network Fair Shannetta Griffin, P.E.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
FUTURE OF AIRPORT MANAGEMENT 1. Though, we cannot predict precisely what airport management be in next 100 years, but it will evolve with changes in technologies,
Wherever Your Path May Lead …. RTS Takes You There!
Southwest Florida Freight Summit October 8, 2015 Ellen Lindblad Director, Planning & Environmental Compliance Lee County Port Authority.
Rochester International Airport 2016 Bonding Request.
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Magic Valley Regional Airport Terminal Expansion and Remodel Magic Valley Regional Airport Terminal Modification Feasibility Study.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
Ohio Aviation Association Airport Airspace Zoning Ohio Airports Conference April 12 and
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Terminal Development Program at Dallas/Fort Worth International Airport Briefing to the Fort Worth City Council June 8, 2010.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
North Terminal Project Overview July 16, North Terminal Program Schedule.
The 14-Gate Replacement Terminal Project at Hollywood Burbank Airport Presentation to the Construction Management Associates of America (CMAA) May 26,
Terminal B Redevelopment Lease George Bush Intercontinental Airport/Houston.
History of Fifth Avenue Landing Hotel Project
Kawartha Lakes Municipal Airport
VIRGIN ISLANDS PORT AUTHORITY
Transportation Research Board
CAPITAL PROGRAM OVERVIEW
Florida Transportation Commission FY 2009
McKinney Airport Master Plan Update April 3, 2018
URBAN TRAIL PROJECT UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
Pierre Regional Airport Master Plan Update
2019 Capital Program Title of Presentation
Logan Airport Parking Program Terminal E Garage
Project/program update
Presentation transcript:

Columbus Airport Authority We’re Really Taking Off! November 6, 2002

Briefing Overview  2003 Capital Projects  2004 and Beyond  Diversity in Contracting Program

2003 Capital Program Angela Tickle, P.E. Engineering and Construction Director Engineering and Construction Director

Port Columbus International Airport  Located six miles east of downtown Columbus  Began operating on a 768 acre site in 1929  Now operating on a 2000 acre site with nearly 7 million passengers  Average of 600 daily arriving and departing flights

Port Columbus International Airport  Two runways (an 8000 ft. north runway and a 10,250 ft. south runway)  >30 gates in three concourses servicing 12 major carriers and 12 regional carriers  Bolton Field Airport in southwest Columbus, created in 1970, serves as a reliever airport

 Approx. $50 million capital program  Pavement projects  Building projects  “Proposed projects” table 2003 Capital Program

Major Pavement Projects  Runway 10R-28L Rehabilitation  International Gateway Interchange  Sawyer Road Rehabilitation  Bridgeway Avenue Relocation  Bolton Taxiway A Rehabilitation & Extension  Bolton Expand South T-Hangar Apron

 Removal of top 2” of asphalt, replacement with 4” (total of 16” asphalt)  Installation of centerline and touchdown zone lights  Relocation and rehabilitation of Taxiway C to provide 400’ separation between runway  Expansion of 10R hold apron  $46 million over 4 years South Runway (Runway 10R-28L) Rehabilitation

South Runway Rehabilitation Phase Phase Phase

International Gateway Interchange  Estimated $36 million project (total cost)  Single point urban interchange (SPUI) and smaller interchange serving parking lots  Environmental clearance obtained  Initiating consultant selection this fall

International Gateway Interchange  Working on agreement between CAA, ODOT, and City for design and construction  Close coordination with Program Management effort  Design in  Construction in (dependent upon funding)

Other Major Roadway Projects  Bridgeway Avenue Relocation –Roadway moves to north for development –Utility Relocation in 2003 –Roadway Relocation in 2004  Sawyer Road Rehabilitation –Construction in 2003

Bridgeway Avenue Relocation

Major Bolton Field Projects  Taxiway A Rehabilitation and Extension –Construction in fall, 2003 –FAA grant funding required  South T-hangar Apron Expansion –Development/funding dependent

Bolton Taxiway Rehabilitation

Major Building Projects  New Air Traffic Control Tower  International Gate Expansion  Baggage Claim Renovations  Improvements to Short Term Garage  Elevator Rehabilitations

221’ New Airport Traffic Control Tower Critical to future airport development Necessary for FAA to upgrade technology Located at Sawyer Road & International Gateway Cost: $18.7 million Opening mid 2004

International Gate Expansion  Provides temporary expansion until new terminal provides state-of-the-art facility  Estimated cost is $2.3 million  Adds 8,800 sf to 23,700 sf facility  Preliminary design is underway  Construction in 2003

2003 Capital Program

Baggage Claim Renovations  Ceiling/lighting upgrades  Carpet replacement  Bag belt renovations  Long term checked bag screening

Short Term Garage Upgrades  Concrete deck sealing  Concrete repairs  Drainage improvements  Security enhancements

Elevator Rehabilitations  Rehabilitation of six elevators in the terminal  Estimated construction cost is $450,000  Construction is scheduled for early 2003

Rickenbacker Projects  Capital Program is approximately $57 million  Merger between RPA and CAA could occur by January 1 (Columbus Regional Airport Authority, CRAA)  Check for updates on CAA/CRAA capital program

CAA Project Management Staff  Dave Gotschall (Airfield, Rickenbacker, Bolton, CAD)  Glen Yoder (Terminal, Work Permit Programs, Interchange)  Unit Terminal Program Management Staff

Marketing Policy  Handout in packet  Intent of policy  Capital Projects Briefings  web site  Procurement “black out” period

Procurement Process  Consultant Questionnaire (in packet)  Consultant Procurement  Contractor Procurement  Advertisement Process  Board Meetings for contracts >$50,000

DBE/Diversity Emphasis  Concourse C Expansion success  Creating a Diversity Program through the Program Management contract  Intent is to build on Concourse C success and expand to “diversity” (beyond “DBE”)  DBE requirement on all Federally funded projects

Passenger Growth Expected to Continue

CAA Program Management Staff  Parsons/Baker/Resource International Team hired in July, 2002  Administration of new Unit Terminal design and construction contracts  Master schedule, budget, document controls for entire capital program

Capital Improvements 2004 and beyond… George Perinis, R.A. Capital Improvements Program Manager Capital Improvements Program Manager

Expanding Into the Future  PCIA has a strong history of growth.  Recent new facilities have been and are being constructed with customer convenience in mind.  PCIA is looking ahead to the future to ensure continued growth can be sustained.  Get back into the planes and in the air!

Airport Master Plan

Schedule Program Definition Design Phase Construction Phase Close Out

Total Capital Improvement Program Source: Port Columbus International Airport 2002 Capital Improvement Program Note: Gross project costs are expressed in millions.

Land Side Air Side Unit Terminal

Dual Crossover Taxiway Bridges Reduce Aircraft Delay

LONG Range: Third Runway

Land Side Air Side Unit Terminal

Terminal building - 360,000 square feetTerminal building - 360,000 square feet Eight (8) gates located in a linear concourse, all B757 capableEight (8) gates located in a linear concourse, all B757 capable International gate and FIS processing facilityInternational gate and FIS processing facility Dual level, eight lane curb front roadway systemDual level, eight lane curb front roadway system New Unit Terminal

Central energy plantCentral energy plant Can be expanded in phases as demand warrantsCan be expanded in phases as demand warrants Ultimate combined terminal capacity of 78 gates will accommodate 11.3 million enplanementsUltimate combined terminal capacity of 78 gates will accommodate 11.3 million enplanements New Unit Terminal (cont.)

PROJECT COST COST Program Definition $ 1,800,000. $ 1,800,000. Lease Terminations 11,100,000. Roadway43,100,000. Terminal and Curb front 161,600,000. Parking70,400,000. Airfield106,500,000. Program Management 7,600,000. Construction Management 13,600,000. TOTAL $ 415,700,000. Unit Terminal Program PhaseI Unit Terminal Program Phase I

Diversity in Contracting Program Shelton Russell

QUESTIONS?