Implementing a National Pavement Management System: New Zealand’s Pragmatic Approach Dr. Christopher R. Bennett HTC Infrastructure Management Ltd.

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Curriculum for Excellence Aberdeen City November 2008.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Develop an Information Strategy Plan
Environmental Management System Implementation
Enterprise Resource Planning
States’ Action Plans and Assistance to States
SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
How a Large Company Used the Principles to Establish its Corporate Information Governance Robin Woolen, MBA, IGP President / Principal.
Preparing your council’s Fit for the Future proposal
Dr. Julian Lo Consulting Director ITIL v3 Expert
System Development Life Cycle (SDLC)
HDM-4 Calibration. 2 How well the available data represent the real conditions to HDM How well the model’s predictions fit the real behaviour and respond.
Copyright 2003 Cuyahoga Community College District Knowledge Management: Making it Fly in Higher Education Presenter: Amy C. Eugene Director, Knowledge.
Good Customer Service Needs Good People Management.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
1.Database plan 2.Information systems plan 3.Technology plan 4.Business strategy plan 5.Enterprise analysis Which of the following serves as a road map.
Do not put content in the brand signature area BCCH presentation ING Financial Education program Hungary 2012 Renáta Pásztor Dániel Lackó June 5, 2012.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Product Quality, Testing, Reviews and Standards
Seminário O controle interno governamental no Brasil Velhos Desafios, Novas Perspectivas 14 a 16 de Maio Iguassu Resort – Foz do Iguaçu - Paraná International.
10 th Meeting of the UNCEEA, New York, June 2016 System of Environmental-Economic Accounting for Agriculture, Forestry and Fisheries Development.
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
Overview Asset Management (AM) is a systematic process of operating, maintaining, upgrading and disposing of assets cost- effectively while maintaining.
W. e. t INTERSERVE PRESENTATION 22/01/2015 Company Overview.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Systems Analysis and Design
STEWARDSHIP OF OUR ROADS Regional Presentation - Auckland 22 July 2014.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
The Traditional System Development Life Cycle There are a number of important steps in the creation of a system, regardless of which approach you use.
Safety Management System Implementation Michael Niels Thorsen Moscow 15 September 2005.
HDM-4 Institutionalization. 2 HDM is for decision-support tool; not decision- making Institutionalization process should ensure that outcome is:  sustainable,
Strategies for Knowledge Management Success SCP Best Practices Showcase March 18, 2004.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
1 International Focus Group at TRL January 2002 by Robert Petts Evaluation Options - Rural Road Surfacing Intech Associates © Intech Associates. Extracts.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
1 Perspectives on Collaboration Presentation to Travel Demand Modelling in the GTHA Organizational Structure and Regional Collaboration Systems Analysis.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
SEVESO II transposition and implementation: Possible approaches and lessons learned from member states and new member states SEVESO II transposition and.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Sicherheitsaspekte beim Betrieb von IT-Systemen Christian Leichtfried, BDE Smart Energy IBM Austria December 2011.
1 Asset Management and Multi-Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
1 The HDM Approach to Multi- Year Programming Christopher R. Bennett University of Auckland Highway and Traffic Consultants Ltd.
Pavement Management in Developing Countries Christopher R. Bennett Senior Transport Specialist East Asia Transport Unit
Finnish Road Enterprise HDM-4 TUTORIAL FOR THE 5 TH INTERNATIONAL CONFERENCE ON MANAGING PAVEMENTS Case Study: Network Level Strategy for Paved Roads in.
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
Framework for Introducing OPRC Christopher R. Bennett Sr. Transport Specialist EASTE.
Road Investment Decision Framework
Overview of dTIMS Input, Analysis and Reporting HTC INFRASTRUCTURE MANAGEMENT LTD.
Road Owners and PMS Christopher R. Bennett Senior Transport Specialist East Asia and Pacific Transport The World Bank Washington, D.C.
Aerosols, Clouds and Trace gases Research Infrastructure
Multi-Year Programming and Predictive Modelling
Systems Analysis and Design in a Changing World, 4th Edition
Principles of Calibrating HDM-4
Systems Analysis and Design
System Development Life Cycle (SDLC)
* Dr. Christopher R. Bennett HTC Infrastructure Management Ltd.
HDM-4 Future Directions
System Development Life Cycle (SDLC)
Introduction and Applications
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
System Development Life Cycle (SDLC)
CEng progression through the IOM3
Presentation transcript:

Implementing a National Pavement Management System: New Zealand’s Pragmatic Approach Dr. Christopher R. Bennett HTC Infrastructure Management Ltd.

Where is New Zealand ? Go to Australia and hang a right...

Why is Our Experience Relevant to Europe? l We were able to successfully implement a national PMS: –in a very short time frame –at a relatively modest cost –that has been favourably received by the users l Our success factors can be used when looking at your own PMS implementations

New Zealand Roading Assets The public road network in New Zealand would wrap around the world 2 ¼ times We are dealing with a substantial network - and only 3.6 million people

New Zealand is l Geologically VERY young –Many difficult soils l Geologically VERY variable –Many different subgrade conditions –Many different construction materials l Environmentally variable –Many different climatic zones A modelling nightmare challenge

New Zealand Roads l Lightweight, low strength pavements l Low capital cost l Crushed rock pavements that are very sensitive to moisture content l Timely and regular maintenance is required to avoid the need for disproportionate future expenditure l Roads “happened” instead of being designed l Comparatively little traffic

A Co-operative Approach State Highways l Transit New Zealand Local Roads l 74 Road Controlling Authorities RIMS Group l Roading Information Management Systems Best Practice Group Asset Management Systems and best practice Appointed Representatives

Situation l Had RAMM system which was primarily an inventory and condition database system l Limited treatment intelligence l Wanted predictive modelling to: –manage the client risk –determine investment strategy –assess the contractual risks –compare merits of bids

Predictive Modelling Principles

Principal Objectives l Single nationally controlled model l Fully integrated into accepted asset management systems l Co-operative development (pool of resources) l Upskill the entire industry (Client, Consultant and Contractor) l Transfer ownership l Sustainable

Computer tools are only one input We were not trying to replace expert knowledge Inventory and Condition Data Field Inspection….. Optimised Work Programme Computer Analysis….

Development Principles l Coordinated –principal consultant with key technical responsibility l Simplicity –Keep it simple –Sophistication only when timely l Pragmatic –Progress not perfection

Select Methodology l Must fit culture (economics) and business practices l flexible (changes are inevitable) l operate at a project level l selected the World Bank HDM modelling approach: deterministic modelling of pavement deterioration and vehicle operating costs

Select and Acquire Software l We selected dTIMS from Deighton Associates in Canada –powerful –flexible –available –proven –well supported l Needed a national license - national uniformity critical

Select Consultant l To manage the national implementation l Attributes –Experienced –Could handle our pragmatic stance –Motivated –Independent of Network Management Consultants l Selected HTC Infrastructure Management Ltd.

Then we just got on with it... Phase I Preliminary System l First cut setup l Limited calibration l Sort data issues l Training l Motivation l Custom software l Pavement strength issues l Launch for familiarisation l Extensive documentation Phase II Refinement l Refined setup l Refined models l More calibration l Training l Documentation perfection l Research needs assessment l Support (help desk) Phase III l Further refinement (HDM 4) l Ongoing support l Further calibration l Model control and audit procedures l Research support

Success Factors l Experienced team - drew on appropriate international expertise l Drove pragmatism very hard l Maintained simplicity l Focused on achievable objectives

Development Expectation

Intellectual l Sustainable training programme l Asset Management l Software l Setup l Data issues l Three tiered l Management-Understanding l Technician-Operation l Expert-Calibration l Extensively documented

Data l Conversion of existing condition data l Long term move to more appropriate data l e.g. Rutting data (length -> depth) l Provision of flow charts to assess missing data l Focussed initially on key sensitivities

What about Calibration? l It is important … but once you have got good input data l We found that the existing data were inadequate l Focus at present on improving data; calibration will come later

Calibration Benchmark Customisation Research LTPP Reasonableness Checking Calibration Coefficients New models & model forms Verify models (long term) We are here Moving here

Research Coordination l Identify needs l Vet proposals l Assist with steering projects l Support academic researchers

Status l Most RCA’s have brought in l Phase I: December June 1999 l Phase II: Delivered June 2000 l Phase III: Under way l Awareness achieved (extensive training) l Enthusiasm abounds l Setup and models proving sound

Issues l A lot of calibration yet to pass l Data deficiencies in existing databases yet to be corrected l Some knowledge yet to be gained l We need more days in the year

l Progress not perfection (pragmatism) l Recognise the limitations l Set realistic goals/expectations l Keep it simple l Its only a tool not an answer Key Success Factors Remember - Our profession at times is more artistic than scientific

Conclusions l It is possible to establish a ‘reasonable’ PMS in a short-time frame with limited resources l You must accept that perfection will not be achievable l Existing experience and technologies will get you a long way towards what is required l Build upon existing knowledge/applications l Invest in training l Accept that it is a cyclical process