CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. CLEAN ROOM SPECIFICATIONS FOR PROJECTS TTC topical workshop on clean.

Slides:



Advertisements
Similar presentations
Dialysis Water Treatment Systems
Advertisements

- Motivation - Cleaning mechanism, technique & apparatus - Nb cavity results - Copper rf gun cleaning - Summary, open topics + next steps Detlef Reschke,
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
HYGIENE CONTROL IN THE BREWING INDUSTRY
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
Copyright National Air Filtration Association 2006 Rev. 2 Clean Spaces.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
Sterile Products Lab PHT 434
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
LASA Medium-β Cavity Progress Update Paolo Michelato 2 nd ESS Collaboration Meeting - SRF Elliptical Cavities 15 th December 2015.
Page 1 F. Peauger High Gradient preparation - Team Meeting – CERN – 12/12/07 High Gradient Preparation of a 30 GHz HDS-Thick structure 1.Physical arguments.
TTF3 Coupler Assembly Cleanroom SLAC March 26, 2007 Jeff Tice.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH HARDWARE PREPARATION FOR XFEL TTC topical workshop.
JLab SRF Cleanroom and Air Bourne Particle Monitoring T. Reilly JLab.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Guillaume Olry, Sébastien Bousson CNRS/IN2P3/ IPN Orsay – Paris-Sud University Experience on Spiral2 cavity cleanliness degradation during clean room assembly.
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Sterile Products Lab PHT 434
 Market Survey  Design, supply, delivery and installation of a Clean Room Facility  at the entrance of the LAr detector tank,  used for the storage.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Status of the M-ECCTD F. Peauger - P. Bosland
Beryllium Handling in the High Temperature Materials Laboratory and Hot Cells.
Field Emission Minimization for LCLS-II
Status and plans for the 3.9 GHz section of XFEL
Assembly of Crab Cavities couplers in SM18 clean room
LIGHTHOUSE Clean Room Technology
DESY Experiences on Use of Gas overlay during Assemblies
Cleanroom Upgrade in SM18 Optical Inspection bench
Documentation (XFEL Naming convention, uploading…)
Operating SRF systems reliably in a “dirty” accelerator
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Modern Devices: Chapter 5 – Cleanrooms,
Maximum count per cycle
Definition of work flow for string DESY Example on critical operation
Acceptance criteria for cleanroom infrastructure
DESY experiences on education and training of cleanroom team
Filter Installation Leak Testing
WP 3 coordination meeting Saclay May 2008
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
Highlights from EU Global Design Effort
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
Sterile Products Lab PHT 434
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Cryomodule Product Breakdown Structure and configuration traceability
System tests at CEA O. Piquet 19/03/2019
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. CLEAN ROOM SPECIFICATIONS FOR PROJECTS TTC topical workshop on clean room assembly | Stéphane BERRY XXX

SOMMAIRE | PAGE 2 TTC topical workshop on clean room assembly | Nov Specifications of clean room infrastructure (ISO4 5, utilities), tools and consumables Why clean environment ? Projects and R&D Tools to control environment Consumables controls IEST-RP-CC003 garment & change frequency ISO certification (air velocity & particles) High Pressure Rinsing (New design) Water quality control (TOC, resist, particles)

WHY A CLEAN ROOM FOR CAVITIES ? | PAGE 3 TTC topical workshop on clean room assembly | Nov Class 10 Field Emission is often a limiting factor for cavities Polishing to get smoother surface High Pressure Rinsing with Ultra Pure Water Cavity assembly in clean room Clean Room Low dust environment, pressure, temperature et humidity monitored (ISO4-ISO5-ISO7) Remove metallic dust, keep away human one Outside of component Fastening (*new *clean) Gasket (*procurement) Components clean on outer surface

CEA-SACLAY EXPERIENCE IN BUILDING CR | PAGE 4 TTC topical workshop on clean room assembly | Nov ISO 7 (class ) 28 m m x 4.72 m ISO 5 (class 100) 38 m m x 4.72 m ISO4 (Class 10) 112 m² 7.8 m x ( ) m 15.6 m ISO 5 (class 100) 53 m 2 ISO 7 (class 10000) 27 m 2 HPRHPR 4 m 2 Two clean rooms Both have been built with a MULTI- PROJECT approach: R&D, SOLEIL (in case of repair), SPIRAL2, HIPPI, SPL, XFEL, IFMIF, ESS, Construction phase ends on May 13 th 2014 and Nov 24 th 2009 Same scale Measured ISO4 for 0.3µm in may 2014 Measured ISO1 for 0.1µm in feb.2013

TTC topical workshop on clean room assembly | Nov CEA-SACLAY CLEANROOM ACTIVITIES Cavity and couple r SPIRAL2 : RF test preparation of QWR and final assembly of HPC after QWR qualification XFEL Ell. 1.3GHz: final assembly of Cold Coupler and String Assembly (3 prototypes and 103 series ) IFMIF HPC&HWR : RF test preparation of preserie cavity and HPC for horizontal test (SATHORI) ESS : Elliptical cavity cryomodule Technology Demonstrator (ECCTD) R&D Activities | PAGE 5

CONTROLLING TOOLS Airbone particle counter: LIGHTHOUSE SOLAIR 6 counters with min. channel size 0.3 µm, flow 28.3 L/min (1CFM) (model 3100) To measure routinely particle on components to be assembled 1 counter with min. channel size 0.1 µm, flow 28.3 L/min (1CFM) (model1100) To measure routinely particle on flushing/pumping lines Fog generator: To check laminarity of the air flow To check pressure difference between rooms To evaluate cross contamination during SPIRAL2 and protoXFEL co-activities UV light control: TECHNIFRANCE UV AHAND 250 GS H1/BL To investigate quality of consumables To control work of cleaning company Air Flow Meter: Thermal anemometer TESTO 425 To measure the velocity of nitrogen flow out of flushing lines To measure the air flow according to ISO14644 | PAGE 6 TTC topical workshop on clean room assembly | Nov

CONSUMABLES: CONTAMINATION CONTROLS | PAGE 7 TTC topical workshop on clean room assembly | Nov UV light control Assembly with LATEX Gloves Particles counting have been performed : As- received and with small friction between fingers (courtesy of C. Servouin) UV light control Assembly with PVC Gloves

IEST-RP-CC003 GARMENT & CHANGE Image des tenues en salle et tableau de fréqunece de changement COMPLETER cf fichier de formation | PAGE 8 TTC topical workshop on clean room assembly | Nov Contami nation source ISO 7 (classe 10000) ISO 5 (classe 100) ISO 4 (classe 10) BodyInner suit * HeadHair cover FaceMasks Body+ Head Frock Coveralls with hood Feet Dedicated shoes New shoes & shoe covers HandsGloves (12’’) Eyes Goggles $ 1 per week 2 per week 5 per week

ISO CERTIFICATION (AIR VELOCITY AND PARTICLES) Large CR: 1FFU damaged by overvoltage on 16/04 repaired on 8/07 (delivery pb) 1 laminar flow repaired among 4 (delay 1 day) | PAGE 9 TTC topical workshop on clean room assembly | Nov OK Peripheral sealing

NEW HIGH PRESSURE RINSING CHARACTERITICS In operation in January 2015: In a separate ISO5 laminar flow room No moving part between water filter and nozzles No mechanic between Cavity and Final Filter Unit Dissociation of rotation and translation moves Adujstable speed of moves Maximum capacity : length 1,70 m weight 200 Kg | PAGE 10 TTC topical workshop on clean room assembly | Nov

WATER QUALITY CONTROL Resistivity Measurement: To control on line the inorganic ions (e.g. Na+, Ca2+, Mg2+, Cl−, SO4 2−) 18M  Total Organic Carbon (TOC): HACH LANGE PAT700 - SN 1640 To control on line the organic ions (associated to bacteria development) Std : Eur. And US Pharmaopoeia <500ppb // ASTM (D ) Type I* <50 Our initial TOC value≈12ppb tends to decrease Liquid particle counter: First investigation made on particle in ethanol (12 samples ; 10mL) | PAGE 11 TTC topical workshop on clean room assembly | Nov ,3 micron0,5 micron1,0 micron Average 287,0111,80,0 Maximum Minimum Standard Deviation 24,813,30,0

BACK-UP SLIDES | PAGE 12 TTC topical workshop on clean room assembly | Nov

| PAGE 13 TTC topical workshop on clean room assembly | Nov

| PAGE 14 TTC topical workshop on clean room assembly | Nov

| PAGE 15 TTC topical workshop on clean room assembly | Nov

SURFACE PARTICLE COUNTER | PAGE 16 TTC topical workshop on clean room assembly | Nov

ETHANOL | PAGE 17 TTC topical workshop on clean room assembly | Nov ,3 micron0,5 micron1,0 micron 15:17: :17: :17: :17: :17: :17: :18: :18: :18: :18: :18: :18: Average 287,0111,80,0 Maximum Minimum Standard Deviation 24,813,30,0 Nombre de particules dans un prélèvement d’une pissette d’éthanol Volume environ : 10mL

OUTILS | PAGE 18 TTC topical workshop on clean room assembly | Nov Pour insérer une image : Menu « Insertion / Image » ou Cliquer sur l’icône de la zone image