Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.

Slides:



Advertisements
Similar presentations
February 17-18, 2010 R&D ERL Andrew Burrill R&D ERL SRF Electron Gun Andrew Burrill February 17-18, 2010 SRF Electron Gun.
Advertisements

Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
201 MHz NC RF Cavity R&D Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory WG3 at NuFact 2004 July 28, 2004.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Thin Films for Superconducting Cavities HZB. Outline Introduction to Superconducting Cavities The Quadrupole Resonator Commissioning Outlook 2.
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
The design of elliptical cavities Gabriele Costanza.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
RF-Dipole Cavity: Processing and RF Measurements Procedure
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Page 1 Subashini De Silva Center for Accelerator Science Old Dominion University CAVITY II – RF-DIPOLE CAVITY TEST RESULTS LHC – CC-13, CERN December 9-11,
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
High Temperature Heat Treatment to Raise the Quality Factor of Large Grain Niobium Cavities Pashupati Dhakal Gianluigi Ciovati Ganapati Rao Myneni July.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
W. Singer. SRF2011, July 25 ‐ 29, 2011, Chicago, Illinois, U.S.A. XFEL Cavity Recipe for Mechanical Fabrication and Treatment Waldemar Singer/DESY.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
August 16, 2007ILC Video Conference at FNAL Update on testing of Jlab fabricated 9-cell cavities P. Kneisel, G. Ciovati.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
650MHz Cavity, Helium Vessel, and Tuner Status at Fermilab Chuck Grimm IIFC POC 650MHz Cavities Fermilab (Avinash Puntambekar RRCAT)
SRF Advances for ATLAS and Other 
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
RF Dipole HOM Electromagnetic Design
Electropolishing of Dressed ILC 9-cell Cavity
(4 areas/website front)
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Odu/slac rf-dipole prototype
Peng Sha Institute of High Energy Physics, CAS
LINAC AG • IAP • Goethe Universität Frankfurt
Fabrication of Nb and Cu SPL cavities and required tools CERN status
ELLIPTICAL SCRF CAVITIES
SPS – RFD Experience and Evolution to LHC
Mircea Stirbet Jefferson Laboratory
Development of the SRF Cavity Design for the Cooler ERL
RF Techniques and Developments at SSRF
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
SNS Coupler Shipping Plans
Presentation transcript:

Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team

Andrew BurrillFall 2011 Project X Collaboration Meeting Program Overview Jefferson Laboratory has designed a 5 cell, β = 0.61, 650 MHz cavity as an option for Project X. Based on this design two single cell cavities have been fabricated, processed and tested in-house. The cavities were fabricated from 4 mm RRR>250 niobium sheet. The cavities were chemically etched using 1:1:2 BCP to remove ~250 μm of material. Hydrogen degassing at 600 °C for 10 hours Cavity-A had a Qo value >1x10 11 at 1.6 K corresponding to a residual resistance of < 1.5 nΩ. Both cavities have exceeded E acc of 17 MV/m. Additional information may be found in: MOPO007 Proceedings of SRF 2011 MOPC114 Proceedings of IPAC 2011

Andrew BurrillFall 2011 Project X Collaboration Meeting Cavity Design 5 cell cavity design based on β=1 high average current cavity shape fabricated & tested at MHz & 1497 MHz. –Cavity features flat cell walls Facilitates chemical etching and cleaning Reduces electron impact energy –multipacting –Large iris apertures & flat equator region Should aid in mechanical stability Increased cell to cell coupling Aid in field flatness sensitivity Reduce amount of post-fabrication tuning

Andrew BurrillFall 2011 Project X Collaboration Meeting RF Parameters JLab design utilizes a larger beamtube and iris ID Advantages: better cell-to-cell coupling better mechanical stability less field flatness distortion less HOM trapping and field tilts better cleaning Disadvantages trade-off with RF properties (see table)

Andrew BurrillFall 2011 Project X Collaboration Meeting 5 cell β=0.61 Multipacting Analysis

Andrew BurrillFall 2011 Project X Collaboration Meeting Fabrication & Processing at JLab 2 cavities fabricated from 4 mm RRR>250 sheet material from ATI Wah Chang Beamtubes made from reactor grade sheet Standard deep drawing and surface grinding of half cells Equator butt weld NbTi flanges with AlMg 3 seals Mating flanges are SS 250 µm bulk BCP w and w/o flow diverter Hydrogen degassing : 600C,10 hrs Light, 50 µm, BCP Single pass HPR, 1250 psi with 2 opposed 25 degree nozzles Drying and assembly in Class 10 space

Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Cavity A Vertical RF Test

Andrew BurrillFall 2011 Project X Collaboration Meeting Cavity Test Results Temperature dependence of the surface resistanceΔf/Δp of 4.4 kHz/mbar unstiffened and 1.7 kHz/mbar Lorentz Force detuning for the unstiffened (Cavity A), and stiffened (Cavity B)

Andrew BurrillFall 2011 Project X Collaboration Meeting

Current Research Path Finalize the mechanical design for the 5 cell β=0.61 cavity –Pressure calculation –Stiffening ring location optimization –Integration into the Fermi helium vessel Things we would like to do: Build a 5 cell β=0.61 to prove out the design, measure RF performance, compare BCP to EP, etc. Finalize the design & Fabricate a JLab β=0.9 prototype

Andrew BurrillFall 2011 Project X Collaboration Meeting Summary Jefferson Laboratory has designed a 5 cell, β = 0.61, 650 MHz cavity as an option for Project X. Based on this design two single cell cavities have been fabricated, processed and tested in-house. Cavity-A had a Qo value >1x10 11 at 1.6 K corresponding to a residual resistance of < 1.5 nΩ. Both cavities have exceeded E acc of 17 MV/m. Things we would like to do: Build a 5 cell β=0.61 to prove out the design, measure RF performance, compare BCP to EP, etc. Finalize the design & Fabricate a JLab β=0.9 prototype

Andrew BurrillFall 2011 Project X Collaboration Meeting Acknowledgments Frank Marhauser (RF design, simulations, copper model measurements) Peter Kneisel (Cavity Testing) Bill Clemens, Gary Slack (Cavity Fabrication) Cavity Production technical staff