E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
E.Guschin (INR,Moscow) 14 February 2007Calorimeter commissioning meeting, CERN Digital camera with LED monitoring Status: Photographs of SPD are completed.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Muon commissioning status and plans G.P. C. De Plano.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
8/September/2008Calo Running and Operation Meeting 1 SPD running and operation: progress report and plans Calo running and operation meeting – CERN 8 th.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Evgeny Gushchin (INR,Moscow) 23-Feb-2009 Calorimeters meeting, CERN Status of PS/SPD LED tuning C-side : SPD, PS A-side : PS Some statistics, problems.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
1 PS cabling status and planning Overview Rustem DZHELYADIN (CERN&IHEP, Protvino) PS-Cabling: what has been done : 1.PS/C top cable tray (3days)installed.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
2009: restart the system: few observations. Hw maintenance week:
Presentation transcript:

E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for checks and time alignment of detector/electronics during commissioning before physics. To prevent PMT suffering the hot LED light has to be discriminated by tuning of LED driver channels. Also the goal for tuning is to minimize the light variation within group of LED fired simultaneously (up to 256 LED) and operated by one DCS channel (up to 512 LED). PS “A” and “C” side, and SPD “C” side data taken in February. Few problems with cables, and “hot” channels with bad resistors are fixed. In zero approximation is OK, except one problem with shortcut on LED cable on PS “C” side, which is known and to be fixed. No regular tuning using on-line DAQ is done yet. SPD “A” : first data taken on 14 March show some problems. No threshold scan was available, so the tuning using online measurements is done using adjustment of the LED light for fixed threshold for the set of two PMT HV (500V and 700V). All outer and inner parts are tuned at 2500 DAC counts, middle part is tuned at 1600 counts.

E.Gushchin,S.Filippov(INR,Moscow) Tuning of LED light on SPD ‘A’ side The problems has been solved: 1.some “hot” channels, this was solved by resistor repairing 2.worse uniformity for some PMT, solved by tuning 3.“Noise” after LED pulse at some PMT. This is explained by low threshold. Effect is also reduced after tuning. 4.difference in LED bias point, i.e. for middle vs inner region. This is essential for different LED types. Finally, all middle part is tuned at the lower bias voltage (1600 DAC channels) and it is connected to separate DCS channel. 5. LED trigger timing problem for some VFE. It seems to be eliminated by correct initialization within PVSS project for LEDTSB. 16 April 2008Calo commissioning meeting CERN

E.Gushchin,S.Filippov(INR,Moscow) 26 March 2008Calo commissioning meeting CERN Checks Check of mapping was done with LED switching one by one for top and bottom of the detector. Checks with tuning confirmed. Check on the detector: few (~5) ‘hot’ channels -> problem with tuning resistors, easy solved by replacement. One LED shown 800 Om resistance for bias voltage was disconnected. Check jitter of LEDTSB output: In crate PRS7 the output pulse width was jumping nsec. It was seeing on Monday. On Tuesday it was not reproducible. Anatoly’s suggestion is that LEDTSB was not completely correctly configured. Continue to learn. Check of “noisy” LEDs: Trying twice larger VFE threshold reduce noise -> sometime threshold is too low.

E.Gushchin,S.Filippov(INR,Moscow) 26 March 2008Calo commissioning meeting CERN Tuning 6B01 500v/700v 700V better timing 700V Timing problem 500V

E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN Plans On SPD A-side : 1. To check using threshold scan if the uniformity after tuning is acceptable or not. 2. To improve the LED trigger timing, if possible. On SPD C-side: 1.Check using threshold scan. 2.To tune for better matching DCS channels, the same as it is done on “A” side. Full tuning will take ~ 1 week. On PS: 1.To fix shortcut on “C” side. 2.If necessary, to tune for better matching DCS channels. Full tuning on A and C side will take 7-10 days.