A Quick Review of the Components THE DMAIC CYCLE.

Slides:



Advertisements
Similar presentations
Business Process Management and Modeling. Two Key Aspects Tools for Today: Utilize effective methods to gather information and model workflows Tools for.
Advertisements

METODOLOGI SIX SIGMA PERTEMUAN 5 MEASURE PHASE OLEH: EMELIA SARI.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
12–1. 12–2 Chapter Twelve Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
ISHIKAWA DIAGRAM – Tool for quality management Marit Laos IS Project Management
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Lean Sigma Overview and its Significance to Project Management Harjit Singh, PMP
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
MOHAMAD SHARIF B ISHAK B
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Using Microsoft Project for Implementation of Six Sigma Projects A Tools and Tips Presentation Nora Gessert, Pcubed.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
© Mahindra Satyam 2009 Project Metrics QMS Training.
CMMI Technology Conference and User Group November 2003 Experiences with Leveraging Six Sigma to Implement CMMI Levels 4 and 5 Jeff Facemire & Hortensia.
Everyone Has A Role and Responsibility
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Define Tollgate Checklist
STEP 1: DEFINE THE PROBLEM Problem Statement: What is the problem? A problem is a discrepancy between a standard and the current situation. The ‘standard’
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
DMAIC 1. (Define, Measure, Analyze, Improve and Control) is a process for continual improvement. It is a systematic and fact based approach to plan, sequence.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Project Storyboard (Page 1 of 2)
Project Quality Management.  Define project quality management.  Describe quality planning and its relationship to project scope management.  Discuss.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
IT Project Management, Third Edition Chapter 8 1 Chapter 5: Project Quality Management.
Fishbone diagram Visual model to clarify cause-and-effect relationships. scatter diagram or fishbone diagram or histogram? Click here for Hint.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Cindy Tumbarello, RN, MSN, DHA September 22, 2011.
Assemble-to- order (ATO) A system that produces standard modules to be modified and/or combined into a customizable product. ATO or QFD or DMAIC? Click.
Process Improvement Phases
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Analyze Wrap Up and Action Items
TM 720: Statistical Process Control DMAIC Problem Solving
The DMAIC Method
LEAN SIX SIGMA PROJECT TEMPLATE
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
DRIVING IMPROVEMENTS Through Six MahindraSatyam
Lean Six Sigma DMAIC Improvement Story
Six Sigma Approach.
Six Sigma Greenbelt Training
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
A Dinner Presentation Prepared for ASQ Section October 2010
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Framework for Success: DMAIC
© 2013 American College of Cardiology
LEAN SIX SIGMA PROJECT TEMPLATE
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
IENG 451 / 452 Standardized Work Lab: Work Cells, Standardized Work
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
The 7 Basic Quality Tools ~ The DMAIC Process
Six Sigma DMAIC Process
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Six Sigma DMAIC Process
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

A Quick Review of the Components THE DMAIC CYCLE

 DMAIC is a data-driven process for improving manufacturing, health care, service, and any business process. The acronym stands for the five steps of the process:  Define  Measure  Analyze  Improve  Control  The cycle is repeated, quickly and continually improving the process and securing business advantages over the long term  It is the core process cycle for Six Sigma projects, and the steps may not be left out or performed out-of-order without eventual repercussion. DMAIC OVERVIEW

 The first step of the process, the outcome of the DEFINE stage is to have a clear understanding of the problem to be addressed, the improvement level to be achieved (objective), and the relevant facts.  The DEFINE stage will clarify in-writing:  A statement of the problem  Including clarifying the relevant facts  The process(es) targeted for improvement  Including related/affected processes  The user(s) affected by the problem  Often referred to as the customer(s)  The process outputs that are critical to quality  CTQs have a direct impact on actual/perceived quality as defined by the user  The scope of the project  Defined boundaries that identify what is considered within/out-of bounds  These items result from a consensus of the project team members; and frequently, the project stakeholders DEFINE

 The second step of the process, MEASURE, is to decide on what are the inputs and output(s) of the process, and how to measure them. The need for good data is very important, and may take a lot of effort to create a system that:  Defines the critical inputs in a test-ably measurable way  Defines the process output(s) in a test-ably measurable way  Defines a system for collecting the measurements (measurement plan)  Tests the measurement system itself  Collects sufficient data for testable results  Frequently, the measurement system is analyzed for adequacy (gauge R & R study) prior to data collection MEASURE

 The third step (after collecting the data) is the ANALYZE stage. In this stage, one or more of the tools of SQC are used to identify the root cause(s) of poor process performance. During this stage, the team will:  Identify sources of variation in the process output  Identify relationship(s) between the process inputs and output(s)  Identify (prioritize) the inputs that cause process variation  Identify (quantitatively/qualitatively) the performance gap between the current process output and the output goal  One of the end results is that the analyze stage identifies a clear performance baseline from which to clearly identify significant and/or sustainable improvements ANALYZE

 The IMPROVE stage is the fourth step in the cycle. In this stage, creative and quantitative tools are used to innovate the process, moving its measurable operation towards the goal. Solutions may be identified or improved by using tools like:  Brainstorming  5 Whys  (Ishikawa) Fishbone Diagrams  Design of Experiments  Failure Mode & Effects Analysis (FMEA)  The outcome of this stage is to test-ably deploy improvements according to a detailed and documented implementation plan IMPROVE

 The last stage before the improvement cycle repeats is CONTROL. In this step, the team:  Creates a plan to sustain the improvements  Documents their efforts and the new baseline  Implements a strategy to test-ably identify when the process is not operating as designed  This may include the calculation of preliminary control limits, and recalculation of these limits if statistical process control charts are used  Check sheets and variance reports are other tools that may be deployed to sustain improvements, provided that sufficiently detailed instructions are included to identify when assignable/special causes require action  This stage continues as long as monitored improvements result in continued success or until management decides to further improve the process (and the DMAIC cycle repeats) CONTROL

 For the SDSM&T Six Sigma Greenbelt Project, you will be required to document how each of these steps was performed during the implementation of an actual project. This includes documenting use of at least some of the tools appropriate to the project in some detail.  Due to the time-frame frequently inherent to the final stage, SDSM&T does not require completion of the CONTROL step, but it does require the documentation of the control plan, including identification of control chart types and calculation of preliminary control limits, if appropriate.  The Six Sigma Project may be done in conjunction with any of the following:  Outside Employment (with permission of your employer)  Co ops (with permission of your employer)  Internships (with permission of your employer)  Course Projects(with permission of your instructor)  Senior Design projects … and others  The Six Sigma Project Report is required, and while you may use material from any of the above projects, the submitted document must be a stand alone report – see the Six Sigma Project Requirements document SDSM&T SIX SIGMA GREEN BELT REQ.S