CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.

Slides:



Advertisements
Similar presentations
Primo (e ultimo ?) giorno di fascio a LHC Nuovo Logo di CMS valido almeno fino alla prossima primavera:
Advertisements

Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
The CMS Detector Paoti Chang National Taiwan University
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
The LHC Machine and Experiments
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
W. Smith, U. Wisconsin, HCP, Nov. 16, CMS Detector Global Status - 1 CMS Detector Global Status Wesley H. Smith U. Wisconsin HCP Hadron Collider.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Status of CMS and the road to first physics results Jordan Nash For the CMS Collaboration – ICFA Seminar – SLAC October 2008.
The forward detectors of CMS Experiment at LHC Bolek Wyslouch MIT
Status and Plans of the CMS Experiment Darin Acosta University of Florida On behalf of the CMS Collaboration Dijet recorded 12/6/09, E T ~25 GeV.
Paolo Rumerio, University of Maryland On Behalf of the CMS Collaboration The LHC and Dark Matter Ann Arbor, Michigan, January 6 th -9 th, 2009 Status of.
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
Approved Plots from CMS First Beam Runs 2-October-2008.
Toward Assessing HF with Beam Halo Muons & Beam-Gas Events …tuning HF when beam returns excerpts from US-CMS presentation 9/26/08 Michael Schmitt, NWU.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
Dec 23 rd, 2008 Nicolo Cartiglia, INFN, Turin, Italy 1 CMS Commissioning How to compose a very very large jigsaw-puzzle LHC & CMS CMS construction Phases.
1 Perspectives for quarkonium production in CMS Carlos Lourenço, on behalf of CMSQWG 2008, Nara, Japan, December 2008.
CHEP06, Mumbai-India, Feb 2006V. Daniel Elvira 1 The CMS Simulation Validation Suite V. Daniel Elvira (Fermilab) for the CMS Collaboration.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Il Trigger di Alto Livello di CMS N. Amapane – CERN Workshop su Monte Carlo, la Fisica e le simulazioni a LHC Frascati, 25 Ottobre 2006.
Operation of the CMS Tracker at the Large Hadron Collider
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
CMS Status Report 8 th CERN-Korea Committee Meeting CERN October Guido Tonelli University of Pisa/INFN/CERN Our physics goals. The CMS Experiment.
Toyoko Orimoto, Caltech 1 CMS Electromagnetic Calorimeter US CMS JTERM III 12 January 2009 Toyoko Orimoto California Institute of Technology.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Jessica Leonard, U. Wisconsin, December 19, 2006 Preliminary Exam - 1 H->  Jessica Leonard University of Wisconsin - Madison Preliminary Examination.
First CMS Results with LHC Beam
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
From the Standard Model to Discoveries - Physics with the CMS Experiment at the Dawn of the LHC Era Dimitri Bourilkov University of Florida CMS Collaboration.
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
Muon Detectors Tile Calorimeter Liquid Argon Calorimeter Solenoid Magnet Toroid Magnets 46m 22m SemiConductor Tracker(SCT) Pixel Detector Transition Radiation.
C. Clement (Stockholms Universitet) Partikeldagarna 2008, Stockholm.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
Nikhef Scientific Meeting 2000Onne Peters D0 Muon Spectrometer December 14-15, Amsterdam Onne Peters Nikhef Jamboree 2000.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Roberta Arcidiacono Universita' & INFN Torino on behalf of the CMS collaboration DIS09 – April 2009 Status of CMS.
CMS ROC Report Patricia McBride May 26, 2005.
Electromangetic calorimeter of CMS: status and performances
Approved Plots from CRAFT
The CMS Experiment at LHC
First data from TOTEM experiment at LHC
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Update of experimental hall in Japanese mountain site
Preparation of LHCb for data taking
CMS ECAL Calibration and Test Beam Results
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Project Presentations August 5th, 2004
The CMS muon system performance
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Presentation transcript:

CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

ECAL Si Tracker 3.8T solenoid Muon chambers HCAL 2 CMS: B-field of 3.8T (solenoid) DAQ and trigger (10 9  10 2 events/s) total weight~14.5Ktons, diameter: ~15m, length: ~22m CMS at LHC: Iron yoke LHC: pp collider at E cms =14 TeV Luminosity max = cm -2 s -1 1 crossing/25 ns (40MHz) 20 events/crossing  1000 tracks Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat Pixel YB0 YE-1

CMS Status in Fall 2008: 3 Wolfgang Funk – CERN PH/CMX Beam-pipe: installed in spring 2008 and baked out. Pixel: installed, commissioned and operated. Si Tracker: cabled, commissioned & operated. ECAL: Barrel fully operational, both endcaps installed, commissioned and operated this summer. HCAL: HB/HO/HE fully operational, HF installed this summer. Solenoid: Coil has been tested this Oct. to 3.8T (nominal field) underground. Magnet has been tested already in 2006 on surface. Muon systems: (DT/RPC in barrel, CSC in endcaps) fully operational. (RPC in endcaps) commissioning underway. Level-1 Trigger and DAQ: functional. Software and computing infrastructure: prepared. Final releases for data taking deployed. Preparation for physics: We are ready for beam next year. 10/11/2008-PANIC-Eilat

Lowering YB0 and YE-1: 4 Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

YB0 after Cabling of EB & TK: 5 Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

YB0 after Cabling of EB & TK: 6 Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

Construction of EE: 7 Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

Closure of CMS (-side): 8 Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat

9 Si Tracker Commissioning: Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat Nice Landau shape in all subdetectors. S/N measured: 21.1 in TIB 25.6 in TOB 28.3 in TEC (mean over all geometries) operational 98.2% 99.5%

10 Pixel Commissioning: Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat Barrel : 99.2% operational (lost 0.3% before, 0.5% after installation). Forward: 94% operational (lost 0% before, 6% after installation). Noise performance is good 66 mega pixels!

11 ECAL Commissioning: Wolfgang Funk – CERN PH/CMX 10/11/2008-PANIC-Eilat Energy: 250 GeV ECAL clusters matching µ-tracks 2 GeV EE DT HE HB EB

DT µ-Chamber Commissioning: 10/11/2008-PANIC-Eilat MB1: 271  m MB2: 269  m MB3: 268  m MB4: 274  m Cosmic tracks extrapolated to the surface (CMS coords) Can clearly see the shaft ! linear scale 80m z [ cm] Wolfgang Funk – CERN PH/CMX 12 Trigger rate during Opening of the plug on top of the shaft

First Beam: 10/11/2008-PANIC-Eilat Wolfgang Funk – CERN PH/CMX 13 After almost 20 years of design and construction CMS started taking data with LHC beams. Sunday Sept. 7 – Monday Sept. 8: Single shots of Beam 1 (clockwise) onto collimator 150m upstream of CMS. CMS beam monitoring system synchronized to beam timing. Tuesday Sept. 9: 20 shots of Beam 1 onto collimator 150m upstream of CMS. Wednesday Sept. 10 – Friday Sept. 12: Splash events with closed collimators. Halo-µ events once beam went through CMS. Friday Sept. 19: Incident in sector 3-4  Wait for beam in 2009

First Events - Closed Collimator: 10/11/2008-PANIC-Eilat Wolfgang Funk – CERN PH/CMX 14 ~ protons on collimator ~150 m upstream of CMS ECAL- pink; HB,HE - light blue; HO,HF - dark blue; Muon DT - green; Tracker Off >99% of ECAL channels fired With splash events ECAL is now time aligned ~1ns ~180 TeV deposited in EB+EE ~1100 TeV deposited in ECAL + HCAL

Calorimeters: Closed Collimator 10/11/2008-PANIC-Eilat Wolfgang Funk – CERN PH/CMX 15 ECAL Energy Map EB+ EB- EE-EE+ topbottom Beam EE photo-detectors calibration not yet applied (lowest gain at beampipe)

Beam Halo Events - CSCs: 10/11/2008-PANIC-Eilat Wolfgang Funk – CERN PH/CMX 16 ME  4ME  3ME  2ME  1 ME+1ME+2ME+3ME+4

Outlook: 17 Wolfgang Funk – CERN PH/CMX After almost 20 years of design and construction, CMS has started data taking with LHC beam. First events with LHC beam have been recorded. Last sub-detector (Preshower) in front of EEs will be installed over the winter. Have already assembled with all sub-detectors together ~300M cosmic events with field ~30M cosmic events without field. All sub-detectors have shown that they are working including DAQ, Trigger and Computing. CMS is ready for the exciting physics with LHC which is waiting for us. 10/11/2008-PANIC-Eilat