Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Water for Hyper-K -Updates since 1 st meeting- 2nd Open Meeting for Hyper-K Jan 14 2013.

Slides:



Advertisements
Similar presentations
Hiroyuki Sekiya June , Kyoto, NEUTRINO2012 Design of a huge water purification system based on the Super-Kamionade system Hiroyuki Sekiya* for.
Advertisements

Dialysis Water Treatment Systems
Basic Refrigeration Cycle
Using Copper Water Loop Heat Pipes to Efficiently Cool CPUs and GPUs Stephen Fried President Passive Thermal Technology, Inc.
Heat Recovery for Commercial Buildings
Water for Pharmaceutical Use Water Purification Engineering Md. Saifuzzaman Associate Professor Pharmacy Discipline, KU.
2007 March 21stLAUNCH MPI, Heiderberg1 Solar Neutrino at KamLAND Sei Yoshida Reserch Center for Neutrino Science, Tohoku Univ. for the KamLAND.
Drug Delivery & Tissue Engineering Laboratory
Mr. D. Cannoletta - Environmental Control System Department Mr. E. Riegel - Environmental Control System Department ENVIRONMENTAL CONTROL SYSTEM CABIN.
Hydraulics.
Lesson 15 Heat Exchangers DESCRIBE the difference in the temperature profiles for counter-flow and parallel flow heat exchangers. DESCRIBE the differences.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Mechanical for Oil Heat
Saving water and energy in vinification What are the technique to save water and energy in the production of wine? And how much do you save? MARCO RUFFINI.
1 HVACR316 - Piping Condensation Removal Refrigerant Traps Condensation Removal Refrigerant Traps.
No Sprinklers No Drip lines No plowing, tilling or media exchange Plants grow in common sand Passive sub--irrigation 100% efficient, sub-fertilization.
HVAC523 Circulator Pumps.
Q What does this picture show and who is in the best position?
K. Nakamura NNN05, Aussois, April Overview of Hyper-Kamiokande R&D Kenzo NAKAMURA KEK April 7-9, 2005 NNN05 Aussois, Savoie, France.
Future SK Program for e Physics Atsuko Kibayashi For the Super-Kamiokande Collaboration Okayama University June 14, RENO 50 2013/6/14.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Dr. Joel J. Ducoste, North Carolina State University, 1 Importance of water “Water is life” Looking at water, you might think that it's the most simple.
1 So far… We’ve developed a general energy balance We’ve developed a general material balance We’ve only actually looked at systems that are under steady.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
ATLAS TRT CO 2 cooling system project status Beaufort 12: “Hurricane” (>119 km/h) Saffir-Simpson 5: “catastrophic damage” (>250 km/h) (CO 2 distribution.
Super-Kamiokande Gadolinium R&D Project: Status and Outlook 68 th JPS annual meeting. Kyoto. September 11 th, Lluís Martí Magro (Univ. Tokyo, ICRR)
Hyper-Kamiokande project and R&D status Hyper-K project Motivation Detector Physics potential study photo-sensor development Summary Kamioka.
Study of solar neutrino energy spectrum above 4.5 MeV in Super-Kamiokande-I 1, Solar Neutrino Oscillation 2, Super-Kamiokande detector 3, Data set for.
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Current status of XMASS experiment 11 th International Workshop on Low Temperature Detectors (LTD-11) Takeda Hall, University of Tokyo, JAPAN 8/1, 2005.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
Hiroyuki Sekiya 3rd Open Hyper-K meeting Jun 21 Kashiwa Status of HK water system and water quality 3rd Open Meeting for Hyper-K June
Heat Transfer by Convection
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
Mark Vagins IPMU, University of Tokyo NNN11, Zurich Nov. 7, 2011 GADZOOKS! – Gadolinium in Water.
Distribution System If microorganism colonize a storage vessel, the latter then acts as a microbial reservoir and contaminates all water passing through.
Hiroyuki Sekiya ICHEP2012 Jul 5 The Hyper-Kamiokande Experiment -Neutrino Physics Potentials- ICHEP2012 July Hiroyuki Sekiya ICRR,
Mark Vagins Kavli IPMU, University of Tokyo 2 nd Open Meeting for the Hyper-Kamiokande Project Kashiwa January 14, 2013 Gadolinium for Hyper-K.
35 Ton LAr Impurity Distribution Measurements and CFD simulation Erik Voirin – Fermilab – Thermal and Fluids Engineering Group / Engineering.
Thermal Energy. Thermal Energy is a measure of kinetic energy of an object It is the energy of ALL the moving particles in an object.
Hiroyuki Sekiya Open Hyper-K meeting Aug 23 Kashiwa Basic Water plan for Hyper-Kamiokande -Water system & water flow- Open Meeting for Hyper-K.
Chapter 10: Flows, Pumps, and Piping Design
Mark Vagins Kavli IPMU, University of Tokyo 4 th Open Meeting for the Hyper-Kamiokande Project Kashiwa January 28, 2014 Gd Status.
30th International Cosmic Ray Conference in Merida, Mexico Michael Smy UC Irvine Low Energy Event Reconstruction and Selection in Super-Kamiokande-III.
James McIntyre VRF Training Manager V5 Key Components.
1 Chapter 5 Mass and Energy Analysis of Control Volumes.
Status of HK Water 4th Open Meeting for Hyper-K January
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Free vs. Forced Convection
Filtration Technology R&D for WATCHMAN
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
WG2 Water Group.
Recirculating CO2 System
SB Packing Automatic Downpuller Power Unit
ET 438a Automatic Control Systems Technology
Thermal behavior of the LHCb PS VFE Board
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
Internal Flow: General Considerations
Ultra-high energy upward going muons in Super-Kamiokande II
Presentation transcript:

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Water for Hyper-K -Updates since 1 st meeting- 2nd Open Meeting for Hyper-K Jan Hiroyuki Sekiya ICRR, University of Tokyo for the Hyper-K Working Group 2

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Water for Hyper-Kamiokande Source water in the mountains ◦Negotiations with Kamioka Mining & Smelting Co.  Tochibora  Mozumi Ultra pure water for supplying ◦Water system design Water in the tank ◦Water flow design Gd loaded water Liq. scintillator loaded water 2

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Source Water for Hyper-K 3

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Mozumi Option Kamioka mine agrees to resume investigations if we pay money. HK Water source investigation is also indispensable! Source water quality may be the problem.

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Tochibora source water problem

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa 30m シックナー 鉛リサイクル工場 硫酸工場 亜鉛製錬工場金属粉工場 下部清水 上部清水 鹿間発電 第三ポンド 栃洞鉱山 300t 水槽 50t水 槽 150・160・170 KW ポンプ 総合調整池 硫酸30t水槽 孫右衛門 0mポン ド 28,420㎥ /day 3,456 ㎥ /day t/day 5687 t/day 繰り返しポンプ 工業用水(12月平均デー ター) 硫酸200水槽 下部濁水 9,000 ㎥ //day (推測) -430m -370m 水温 7.5℃ 水温 10.3℃(山側) 水温 8.2℃(川 側) * 排水処理設備は省 略 8346 t/day * 季節変動有 984 ㎥ //day 底設暗渠清水 Total spring in Tochibora mine is less than that in Mozumi and all the water is used for the smelting factory Shortage of mine water

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Tochibora water in Confidential

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Available water amount 8 At least, 300t/h of water is available for 6 months.

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Hyper-K water system Revised design 9

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Filling mode 10

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa CompressorDryer 0.3  m filter Buffer H 2 O,CO 2 remover 20 o C Charcoal 0.1  m filter 0.01  m filter 0.01  m filter -40 o C Charcoal Buffer 10  m filter Buffer CO2 remover Buffer 1  m filter HK Tank Rn Free Air generator (400Nm 3 /h) Water Purification System 0.3kt/h for initial supply Mine water RO DI(MB) DI(CP) UV MD UF T controller 1.2kt/h for recirculation purge Original plan

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Mine water consumption 24hx407t/h/day Pure water 300t/h It takes 70 days for filling one tank. 140 days for 1M ton Original plan 1 st stage is common for both tank 2 nd stage for each tank. Does not work at the same time

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Mine water consumption 24hx334t/h/day Pure water 240t/h 1 st stage is common for both tank 2 nd stage for each tank. Does not work at the same time It takes 87 days for filling one tank. 174 days for 1M ton New plan

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Recirculation mode 14

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa CompressorDryer 0.3  m filter Buffer H 2 O,CO 2 remover 20 o C Charcoal 0.1  m filter 0.01  m filter 0.01  m filter -40 o C Charcoal Buffer 10  m filter Buffer CO2 remover Buffer 1  m filter HK Tank Rn Free Air generator (400Nm 3 /h) Water Purification System 0.24kt/h for initial supply Mine water RO DI(MB) DI(CP) UV MD UF T controller 1.2kt/h for recirculation purge NO RO

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Super-K water system filter

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Reminder: technologies for pure water 17 Filtrations & Deionization (General technology) Radon Degasifying (Super-K technology) ◦Radon free air generator ◦Radon removal with membrane degasifier MF UFUF NFNF RO DI UV sterilization (General technology)

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Mine water Consumption 2h x 28t/h /day 600t/h It takes 35 day to process 1Mton water Previous recirculation mode 1 st stage is used for UF reject water and compensation water RO reject 56t/h No RO in the recirculation system RO requires high pressure pumps high running cost large space

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa With or without RO? For prolong the lifetime of UFs ◦At the beginning of the recirculation, UFs may be clogged frequently. Even if we assume usual SK quality water ◦UF lifetime  3 years w/o RO  8 years w/ RO Initial cost vs. running cost ◦Requesting both cost re-estimations.

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa New design with RO

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Plumbing 21

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa From water system to tanks ORGANO

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa 23 In the tank MES

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Pipes 22 inlets and 22 outlets are independently laid up to the top of the tank and valve are installed at the edge in order that we can control the flow. The diameter of the pipes is 65A. This is scaled from SK design. Additional inlets/oultels at 5 levels of side wall for: ◦future activities to prevent stagnation ◦recirculation during initial filling to prevent bacteria from growing (180days!)

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Water Flow simulation by finite volume method One compartment for the first step Software: ANSYS GAMBIT2.4.1+Fluent13.0

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Water inlets & outlets conditions Equally distributed per top/bottom cross section Top and bottom pipes only

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa ID & OD Conditions ID & OD are dealt as completely separated containers. 27 Inner detectorOuter detector Volume370,000m 3 89,000m 3 Flow rate96.7t/h23.3t/h Number of inlets (outlets)184 Flow rate / inlet (outlet) Because of its symmetrical shape, only 1/4 volume is considered for the simulation. 1,400,000 mesh (xy, and yz symmetry)

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Cooling water o C -300M (Top level) rock 16.7 o C Here Boring hole Measured 1m inside Almost same as those in Mozumi/SK →assuming supplying 13.0 o C water Temperature on May

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Temperature on May Boring No2 Boring No3 Boring No4 -370M(bottom level) rock No o C No o C No o C Boring No3 Average (17.7 o C) is close to the nearest No3 value. assuming 17.7 o C Depends on position and the variation is large.

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Other heat source conditions Unlike SK, electronics(HV, QBee,..) are also in the tank. The heat from compensation coil depends on the direction of the tank. 47.4kW Area For one compartment

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Without the heat effects Water is just treated as a fluid ignoring its density dependence of temperature. 31 flow vector50m flow line Very fast flow supply: bottom, return: top

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Full treatment simulation This is like SK… LowE oriented tuning. ◦Bottom convection and top stagnation. Temperature ID ¼ supply: bottom, return: top

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Inverse operation This is atmpd/t2k oriented tuning. ◦Whole convection uniform detector Temperature ID ¼ Supply cold water to the top, return: bottom

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Two solutions For lowE ◦low BG (BG) ≡ stagnation For atmpd/T2K ◦small systematic errors ≡ uniformity ≡ convection A 6%-level top-bottom asymmetry of water transparency exists, however the systematic error on the SK energy scale due to this is below 0.1%-level after correction. We have two solutions in our hand for Hyper-K SK operation

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Conclusion It turned out Tochibora mine water shortage can be dissolved. ◦Mozumi option will be discussed. Hyper-K water system was re-designed. ◦Working on the cost estimation. Progress on the water flow simulation. ◦Super-K flow is reproduced in Hyper-K tank. ◦Working on detail simulations.  Dependence of inlet pipe shape  Using side wall inlets/outlets 35

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa 以下 予備 前回使い回し 36

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Super-K water transparency 37 anti-correlated with Supply water Cherenkov light wavelength Measured by decay e - e + from cosmic  -  + SK-IV SK-III Started automatic temperature control

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa Convection suppression in SK Very precisely temperature-controlled (±0.01 o C) water is supplied to the bottom MeV-4.5MeV Event distribution Return to Water system Purified Water supply r2r2 Temperature gradation in Z The difference is only 0.2 o C

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa ID bottom OD bottom OD top ID,OD top 12t/h 36t/h 60t/h Ver.14May 2012 Current SK situation Stagnation and top-bottom asymmetry. Emanated (from PMT/ FRP) and accumulated Radon Bacteria in low flow rate region

Hiroyuki Sekiya 2 nd Open Hyper-K meeting Jan 14 Kashiwa For bacteria free and uniform (High-E oriented) Hyper-K O 3 or UV sterilizer in the tank is not good for PE surface. PE may get damaged and emit particles. So far, continues high speed flow is the only solution to suppress bacteria in the tank. To make the most of the “1200t/h flow rate”, water flow design in the HK tank is underway.