NLCTA Facility Capabilities E. R. Colby 5/18/09. NLCTA Overview RF PhotoInjector Ti:Sapphire Laser System Next Linear Collider Test Accelerator Cl. 10,000.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

Schemes for generation of attosecond pulses in X-ray FELs E.L. Saldin, E.A. Schneidmiller, M.V. Yurkov The potential for the development of XFEL beyond.
Radiation Physics | ELBE | SRF Photo Injector for Electron- Laser Interaction LA 3 NET conference: Laser applications at accelerators, Mallorca,
SLAC Electron Beam Test Facilities 5 MeV to 23 GeV Carsten Hast, Head Test Facilities SAREC Meeting at SLAC, July 2013 FACET ● ESTB ● NLCTA ● ASTA.
Tessa Charles Australian Synchrotron / Monash University 1 Bunch Compression Schemes for X-band FELs.
Coherent Radiation from High-Current Electron Beams of a Linear Accelerator and Its Applications S. Okuda ISIR, Osaka Univ Research Institute.
Sub-femtosecond bunch length diagnostic ATF Users Meeting April 26, 2012 Gerard Andonian, A. Murokh, J. Rosenzweig, P. Musumeci, E. Hemsing, D. Xiang,
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
E163: Laser Acceleration at the NLCTA Eric Colby, ARDB For the E163 collaboration Safety Overview Committee Meeting Sept. 19, 2002.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
AS Diagnostic Collaboration Mark Boland
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Low Emittance RF Gun Developments for PAL-XFEL
Jörn Bödewadt | Seeding at FLASH | | Page 1 Click to edit Master subtitle style Jörn Bödewadt Recent Results of Seeding at FLASH Supported by.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
August 1, 2008AAC 2008, Santa Cruz, CA July 27-August 2Page 1 Work supported by Department of Energy contracts DE-AC03-76SF00515 (SLAC) and DE-FG03-97ER41043-III.
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
External Seeding Approaches for Next Generation Free Electron Lasers
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
“Attoscope”- Sub-femtosecond bunch length diagnostic
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Jörn Bödewadt Recent Results of Seeding at FLASH Supported by BMBF under contract 05K13GU4 and 05K13PE3 DFG GrK 1355 Joachim Herz Stiftung Helmholtz Accelererator.
UCLA Claudio Pellegrini UCLA Department of Physics and Astronomy X-ray Free-electron Lasers Ultra-fast Dynamic Imaging of Matter II Ischia, Italy, 4/30-5/3/
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
July 8, 2008SLAC Annual Program ReviewPage 1 E-163 and Laser Acceleration Eric R. Colby AARD & E163 Spokesman Work supported by Department of Energy contracts.
What did we learn from TTF1 FEL? P. Castro (DESY).
X-band Based FEL proposal
XFEL Beam Dynamics Meeting Bolko Beutner, DESY First results of micro-bunching and COTR experiments at FLASH Bolko Beutner, Winfried Decking,
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Jörn Bödewadt | Seeding at FLASH | | Page 1 Click to edit Master subtitle style Jörn Bödewadt Recent Results of Seeding at FLASH Supported by.
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Seeding in the presence of microbunching
Drive-Laser Commissioning Status and Plans
Studies at the SwissFEL Injector Test Facility
Status and Interest of the X-ray FEL SINAP
Have a chance to operate your own beam at CERN
Gu Qiang For the project team
Paul Scherrer Institut
WG2 Summary: Diagnostics, measurements, and commissioning
Revised Commissioning Strategy
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
High Level Physics Applications for LCLS Commissioning
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
First results of micro-bunching and COTR experiments at FLASH
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Experience with photoinjector at ATF
Presentation transcript:

NLCTA Facility Capabilities E. R. Colby 5/18/09

NLCTA Overview RF PhotoInjector Ti:Sapphire Laser System Next Linear Collider Test Accelerator Cl. 10,000 Clean Room Counting Room (b. 225) E163 Optical Microbuncher Gun Spectrometer ESBESB Next Linear Collider Test Accelerator E-163 NLCTA capabilities: * S-band Injector producing high-brightness 60 MeV beams (to ~100 pC); ultrashort, ultracold * (4) x-band rf stations and >300 MeV of installed structures * (2) L-band rf stations * Skilled operations group with significant in-house controls capability SX-0X-1X-2 X-3 (2-pack) L-1 (SNS) Space available for experiments 20 feet 30 feet

Capabilities Electron Beam (from injector) –60 MeV, 5 pC,  p/p≤10 -4,  ~1.5x1.5 mm-mrad  t  psec –Beamline & laser pulse optimized for very low energy spread, short pulse operation Laser Beams –10 GW-class Ti:Sapphire system (800nm, 2 mJ) KDP/BBO Tripler for photocathode(266nm, 0.16 mJ) –Active and passive stabilization techniques –5 GW-class Ti:Sapphire system (800nm, 1 mJ) 100 MW-class OPA ( nm,  J) 5 MW-class DFG-OPA( ,000 nm, 1-3  J) Precision Diagnostics –Picosecond-class direct timing diagnostics Micron-resolution beam diagnostics –Femtosecond-class indirect timing diagnostics –Picocoulomb-class beam diagnostics BPMS, Profile screens, Cerenkov Radiator, Spectrometer –A range of laser diagnostics, including autocorrelators, crosscorrelators, profilometers, etc.

NLCTA Laser & LSS Modest changes required to support EEHG Experiment: Install evacuated transport line (vacuum components in-hand; pumping is in place) Install second laser safety shutter (no new logic; add second driver + shutter) Seek LSC approval for 1-3 micron operation in NLCTA vault and modify SOP

EEHG Experiment and Diagnostics are similar to the E-163 Attosecond Bunching Experiment Experimental Parameters: Electron beam γ = 127 Q ~ 5-10 pC Δγ/  = 0.05% Energy Collimated ε N = 1.5 mm-mrad IFEL: ¼ +3+ ¼ period 0.3 mJ/pulse laser 100 micron focus Z 0 = 10 cm (after center of und.) 2 ps FWHM Gap 8mm Chicane 20 cm after undulator Pellicle (Al on mylar) COTR foil

Attosecond Bunch Train Generation First- and Second-Harmonic COTR Output as a function of Energy Modulation Depth (“bunching voltage”) Left: First- and Second-Harmonic COTR output as a function of temporal dispersion (R 56 ) Inferred Electron Pulse Train Structure Bunching parameters: b 1 =0.52, b 2 =0.39 C. M. Sears, et al, “Production and Characterization of Attosecond Electron Bunch Trains“, Phys. Rev. ST-AB, 11, , (2008). 800 nm400 nm 800 nm =800 nm

Inferred Electron Beam Satellite Pulse EE 400 nm 800 nm Q(t) I(t) Electron Beam Satellite! Machine stability supports sub-picosecond class e/  experiments e.g. This cross-correlation measurement of the electron bunch profile took 5 minutes. Much of the visible spread is due to COTR intensity jitter (~Q 2 ) rather than timing jitter

Preliminary Beam Quality Measurement at EEHG Experiment Location 20 pC, 60 MeV, Measured 4/13/09 Dispersion measurement was not yet working in downstream linac!  Horizontal emittance had significant residual dispersion contribution Beam at 60 MeV (drifting through all linac x-band structures) EEHG Location Measurement Locations

Summary Existing NLCTA laser systems meet EEHG experimental requirements –Modest extension of the LSS functionality required (shutter+driver) –Laser transport installation required (components in-hand) Existing NLCTA electron beam quality meets EEHG experimental requirements at 120 MeV, likely also at 60 MeV, with further machine studies. –Some additional beam diagnostics ahead of the EEHG experiment would speed commissioning Sub-picosecond-class timing stability has been demonstrated E-163 experience with near-IR e/  experiments is directly relevant and provides significant leverage –Experience designing experiments and hardware in this low-charge sub- psec regime –Wealth of advanced automated measurement software in LabVIEW and Matlab