WHITE POINT LANDSLIPE PALOS VERDES, CA BY CHRISTIAN KESLER, SAVANNAH KEANE, AND SARVA PULLA.

Slides:



Advertisements
Similar presentations
MSE Wall Design.
Advertisements

BOX PUSHING TECHNOLOGY
Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Measurement for Civil Engineering works
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
No. 18 of 19 Geosynthetics in Asphalt Pavements by Prof. S.F. Brown FEng University of Nottingham The information presented in this document has been reviewed.
Taylor Creek Park Rehabilitation Project. Taylor Creek Park Rehabilitation In July 2012 a significant storm event caused significant damage in Taylor.
RETAINING EARTH STRUCTURE Session 11 – 16
Chapter 34 Bridge Construction.
Lateral Earth Pressures
Soils - HDM Chapter 9 All pictures from HDM Ch 9.
Retaining Wall Design Slope Stability on US-189 MAQuiGr Engineering
A Presentation On Geo Textiles : Perspective from the Construction Sector By D C DE CONSULTING ENGINEERING SERVICES (INDIA) PRIVATE LIMITED FEDERATION.
Foundation Systems.
Chapter 33 Foundation Systems.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
4.5 REINFORCED EARTH (terre armee) FILLS CAN BE FORMED PLACING "REINFORCEMENTS" IN THEM AND COMPACTING (GLASS FIBRE REINFORCED, PLASTIC FIBRE, TRYLENE.
Mechanically Stabilized Earth (MSE) Wall Project Geotechnical Design CEG 4801 Fall 2010 Kamal Tawfiq, Ph.D., P.E. Due Date: 9/30/2010.
Chapter 19 Floors.
Session 13 – 14 SHEET PILE STRUCTURES
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
Floor Systems and Foundation Support
1. By Dr. Attaullah Shah Swedish College of Engineering and Technology Wah Cantt. Reinforced Concrete Design-II Lec-3 Retaining walls.
ASSALAMUALAIKUM & GOOD MORNING
Lecture 11 Advance Design of RC Structure Retaining walls
Golden Gate Bridge is found in Marin County, San Francisco.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
EXAMPLE 2 Standardized Test Practice SOLUTION =+.
Chapter 2b Foundations Shallow & Deep Foundations.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
 Cross section elements consist of the following:  1.Traffic lanes (carriage ways);  2.Shoulders;  3.Medians;  4.Curbs;  5.Side slopes.
Introduction to a pit installation
GRS-IBS Demonstration Bridge Project Cochran Road over Turkey Creek Marshall County.
Slop Stabilization Pertemuan
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Bridge Engineering (5) Substructure – Abutments and Piers
Chapter 6: Mass Wasting Palos Verdes Hills Landslide Landslide is a general term for rapid downslope movement/failure Mass Wasting is even more general.
Managing Council’s Road Network for Better Outcomes Storm Damage Experience Ian de Bruyne Manager Program Planning & Delivery IPWEA Regional Forum 15 May.
Department of Civil Engineering,
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
§7 Stability of slopes Introduction Stability analysis of granular materials The method of slices Development for the analytical method.
CE303: Introduction to Construction Blueprint Lab.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Low Impact Development (LID)
4.4 SOIL NAILING SOIL NAILING IS A REINFORCEMENT METHOD TO REINFORCE THE GROUND WITH STEEL BARS OR STEEL BARS IN GROUT FILLED HOLES. IT IS MAINLY USED.
EXAMPLE 4 Determine right triangles Tell whether the triangle with the given side lengths is a right triangle. a. 8, 15, = ? 289 = 289.
Retaining Wall Construction Building A Block Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
Conceptual Approaches for Short- and Long- Term Erosion and Sediment Control Big River State Park At Big River State Park, DPR and the State of California.
 PREPARED BY:  AVAIYA KEYUR ( )  BADRUKHIYA DHAVAL( )  BHANDERI AKASH( )  CHATROLA VIVEK( )  CHAUDHARI.
RESEARCH AND DEMONSTRATION CENTER ON-LOT SYSTEMS AND SMALL FLOW TECHNOLOGIES DELAWARE VALLEY COLLEGE DOYLESTOWN, PA Project Funding Provided by: Pennsylvania.
Retaining Wall Construction Building A Timber Retaining Wall Developed by: Dr. Teri Hamlin Georgia Department of Education.
GLE/CEE 330: Soil Mechanics Earth Retaining Structures
Direct Shear Test.
The Engineering of Foundations
Under supervision of: Dr. Sami A. Hijjawi
{Graduation Project} An-Najah National University
CT Reinforced Earth Structures
4th Annual Construction Law Summit
LANDSLIDES Engr. Imran Mehmood Civil Engineering Department
American Concrete Pipe Association Short Course
Project Purpose & Description
Case Study: Slope Stabilization for Trunk Highway 2 in Crookston, MN
ANALYSIS AND DESIGN CONSEPT OF GRE PF RETAINING WALL
Human Activities on Mountainsides
White Point Landslipe Palos Verdes, CA
Rail Program Management Services Review Grade Separation Recommended Ideas Palo Alto Rail Committee Meeting ……..
The No.1 Soil Management Solution in Ottawa
Graduation Project Bracing system for deep excavation.
Presentation transcript:

WHITE POINT LANDSLIPE PALOS VERDES, CA BY CHRISTIAN KESLER, SAVANNAH KEANE, AND SARVA PULLA

SITE INFORMATION Palos Verdes, CA On a bluff overlooking the Pacific Ocean Roadway along top of the bluff

BEFORE FAILURE

AFTER FAILURE

AFTER FAILURE

AFTER FAILURE

UTEXAS ANALYSIS BEFORE FAILURE Setup the location Found distances and slope from Google Earth Distributed load for the roadway

UTEXAS ANALYSIS BEFORE FAILURE

UTEXAS PRE-EMPTIVE SOLUTION 7 Reinforcement Lines 108 feet in length Total cost is approximately $453,000

UTEXAS PRE-EMPTIVE SOLUTION

RESULTS ACTUAL FAILURE OF SLOPE FS = COST TO FIX = $32,000,000 PRE-EMPTIVE FAILURE WITH REINFORCEMENTS FS = COST TO PREVENT = $453,000

CURRENT CONDITIONS Currently the road is blocked off on both sides of the slide Construction to begin in 2019 Expected construction time is 2 years

RECOMMENDATIONS Dewatering on the eastern flank Slope anchoring using post-tensioned tieback anchors Reinforced Soil Slope (Granular Fill with steel or geosynthetic reinforcement) Retaining Wall Bridge Regrading

POTENTIAL COSTS Immediate Measures (install monitoring points and drains, grade surface, and add slope anchors and traffic improvements) – $9.14 million. Option 1: Abandon Roadway – $0 Option 2: Restore road without a retaining wall – $43.8 million Option 3: Restore road with a retaining wall – $28.8 million Option 4: Restore road with a bridge – $51.3 million Option 5: Regrade road – $6.7 million Option 6: Reroute road – $6.9 million

END References