1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.

Slides:



Advertisements
Similar presentations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
: adding and removing zones from Federal University of Rio de Janeiro CHEP’09 International Conference on Computing in High Energy and Nuclear Physics.
CERN OPEN DAYS 27 – 29 SEPTEMBER 2013 ATLAS ACTIVITIES Point 1 Connie Potter.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
GTPE 6 June 2013E.PEREZ-DUENAS & D.LACARRERE1 Transfos (2x 2 MVA) Servers (containers) New LHCb Control Room (CR) + LHC cryogenics CR New Assembly Hall.
Status of handling studies for PSB-LIU Caterina Bertone EN-HE LIU-PSB 17/09/2015 Courtesy: A. Newborough EDMS
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Surface Preparation of superconducting cavities and industrial Production Experience Dietrich Bloess International Workshop on Thin Films applied to superconducting.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
The Construction of the LHC Detector Gas Systems ? Ferdi Hahn PH-TA1-GS Detector Steering Meeting 4th of June 2004.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
ALICE space in P2 ALICE TC (W.Riegler, A.Tauro) SPOB meeting –
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
EUG 01/02/2011 News from Electronic Modules design, manufacturing and assembly Betty Magnin TE-MPE-EM 1.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
PH-EDU Education lab in Bat Space Policy Board Meeting 17 November 2011.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
BRANs at HL-LHC Sune Jakobsen (BE-BI-PM) 1st HL-LHC WP13 Project Meeting
LEA 01 October 2008D.LACARRERE1 Level 1 Level 2 SX8 - Emergency Exit – Schematic Side View (from inside building) NO SCALE OPTION 1 Point 8 – Barrack inside.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Transport and Handling Manpower Planning S. Prodon – LEAF
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
 Issues associated with the Current Facilities and Maintenance Management.
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
Cabling for LHCb Upgrade
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
Space Management and Logistics during LS2
INSTALLATION SEQUENCE
Special LS1 day on 12 June 2012, EDMS:
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
A very first look at siting issues
LHCb & EYETS
April Pro Star Well Servicing uses a heated C-can as a tool room / storage compartment for well work parts such as tbg collars, x-over’s etc. This.
Proposal for the modification of building 151 in view of the LS2 PS main magnet and TT2 consolidaiton projects Dominique Bodart TE-MSC-MNC 29/09/2017.
HL-LHC upgrade at IPHC news
Presentation transcript:

1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage and large scale tests. Storage at P8 LHCb urgently needs decent storage space, preferably at P8  To protect tools and equipment which are currently degrading outside  To fulfill pending requests, LS1 and long term needs  To store the equipment needed for LHCb operation currently in Bldg 156  To store the DELPHI material from bldg 157, required for dismantling of the experiment. Estimate: 400 m 2, heated, cherry picker access, and crane. Assembly area for the LHCb upgrade, 900m 2. The building 156 shall be used for the assembly of sub-detectors for the upgrade and large scale tests for the upgrade installation. At present, the space is taken for storage of spare detector parts, handling and access equipment, and occasionally lent to the RD62 and Aegis experiments for their assembly. Lab in Meyrin site LHCb needs 2 small labs in Bldg 13/14 for upgrade R&D activities on new Sub-detectors. This has been already discussed and shall be in the pipeline.

2

3 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX

4 PX ‘material’ shaft LHCb workshop Visitor area (15% of the CERN visitors in 2011) Access control Control room

5 Visitor area welcomed 15% of the visitors at CERN in 2011 The visitor area is shared with access/transport/recreational area. Major developments foreseen by the end of  The full VELO spare detector will be displayed. It will be the only place were Visitors will see a full LHC detector. Special display zone will be prepared by LHCb.  3D movie cinema room will be installed. The room will isolated from the noisy environment.  Short term LS1: The visitor flow is likely to be limited by the lack of space available  Long term >LS1: Control room will be freed (new building) to enlarge the visitor area

7Courtesy of D.LACARRERE

8 4 offices 1 meeting room (20-25p) From 2015, 5 offices will be made available in the new CR building

9 Bldg 156 was used for LHCb detectors assembly Now it is used  For Support to LHCb operation (spare storage and repair lab)  for R&D LHCb Upgrade  Storage of delicate equipment's. upgrade activities LHCb needs to free space in bldg 156 for upgrade activities (R&D and detector assembly).

10 New Lab for upgrade SiPM & Optical test bench Assembly of tracker prototype For LHCb upgrade PH-Safety LHCb detector spares and repair labs Storage LHCb, Aegis, NA62

11 Storage (Long term) LHCb urgently needs decent storage space, preferably at P8  To protect tools and equipment which are currently degrading outside  To fulfill pending requests, LS1 and long term needs  To free space in 156 for LHCb upgrade activities (R&D and assembly). Estimate: 400 m 2, heated, cherry picker access, and crane. Office (LS1) LHCb needs office space at P8, to host LHCb staff, users, and support group At least 5 offices (10p) from 11/2012 to 08/2014