LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
R2E Status Report 18 th LSC Meeting, August 18 th 2013 CERN Radiation 2 Electronics (R2E) Project 18 th LSC Meeting August 16 th 2013 R2E Status Report.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
17 july 2008 Inner Triplets upgrade – 2013 Very first Schedule.
1 Vacuum – Much Ado about Nothing V. Baglin with inputs from P. Cruikshank CERN TE-VSC, Geneva Vincent Baglin LHC Performance Workshop - Chamonix 2011.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
R2E relocation & shielding activities Anne Laure Perrot EN/MEF- LE R2E project meeting, 23 rd October 2012.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
LS1preparation & planning status A L Perrot on the behalf of EN/MEF R2E project meeting 11 th May 2012 EN.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
Vacuum, Surfaces & Coatings Group Technology Department (some) Other non-solved NC across the LHC ring and potential impact on performances V. Baglin.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Overview of the LHC Year End Technical Stop
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
K. Foraz on behalf of OSS members
SMACC Eighteenth report [20 min] 07/02/2014
SMACC Tenth report [15 min] 13/09/2013
Status of LHC installation & New Installation Schedule
K. Foraz on behalf of OSS members
Update of cryogenic activities
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC-TS3 Coordination meeting #3
Consequences of warming-up a sector above 80 K
Keeping LHC cold during LS periods Preliminary proposal
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
K. Foraz on behalf of OSS members
BLM planning 03/03/2014.
LHC installation status
SPS Planning meeting for LS2 #25 Vacuum sectors status
Presentation transcript:

LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1

Progress & forecast – P1 & Sec. 12 Point 1 & LSS1 – In progress: R2E preparatory works – Forecast : R2E - PAD-MAD removal wk R2E - Shielding removal wk.18.. ATLAS ZDC decabling wk. 17 Scaffolding installation for cabling campaign Sector 12 – In progress Warm-up - T~ 140K – Forecast Leak next week 12/04/2013LSC - K. Foraz2 Today

Progress & forecast – P2 & Sec. 23 & P3 Point 2 & LSS – In progress Improvement of the MKI cooling oil circuit Vacuum activities A4L2 (TDI resect.) NEG activation finishing Sector 23 – CSCM tests – [80-300K] ~ wk18-19 Point 3 & LSS – blocked for CSCM tests 12/04/2013LSC - K. Foraz3 Today

Progress & forecast –Sec. 34 & P4 Sector 34 – In progress: cold – Forecast Warm up will start wk. 17 Point 4 & LSS – In progress RF activities – Forecast Cabling campaign from wk.16 Survey and realignment of D & Q (-> Q12) wk Vacuum activities – E5L4 - BWS removal (wk.17) – D5L4 - BGI detectors removal (wk. 16) – E5R4 & D5R4 opening of beam vacuum 12/04/2013LSC - K. Foraz4 Today

Progress & forecast –Sec. 45 & P5 Sector 45 – Venting of the arc done – Almost warm – warm on Monday Point 5 & LSS5 – In progress UL55 door enlargement R2E is getting ahead (cable trays..) TOTEM & CMS-ZDC activities Vacuum : A5R5 (VM repair) NEG activation – Forecast R2E rack disconnection wk 17 Vacuum activities B4L5 (XRPT-> TCL4 - wk. 17 CMS evacuation test on Friday 26 th of April – 12:00- 14:00 – Alarms will sound from RR53-Pt5-RR57 – All the persons in this area will evacuate 12/04/2013LSC - K. Foraz5 Today Courtesy J. Crespo GS-SE

Progress & forecast –Sec. 56 Sector 56 – 22 positions defined by VSC & MSC BLM removed & QPS cable trays displaced W bellows opened (See J.-P. Tock presentation) – ELQA finished tonight – Cryo depressurization this week-end – Cryogenic “consignation” on Monday morning – PIMs 1st ball test: 16 th -18 th April PIMs repairing (after ball test): 19 th - 25 th April PIMs repairing (after W bellows open.): up to 13th May. – IC train Open W: April 16th Cutting M: April 23rd Desolder BB: May 13th Solder BB: May 24th Shunt: June 11th – DFBA consolidation from wk /04/2013LSC - K. Foraz6 Today

Progress & forecast – P6 & Sec. 67 Point 6 & LSS6 – LBDS tests: synchronic dump successful – In progress Addition cooling tower installation SU maintenance MKD generator maintenance Vacuum activities – A4L6 &A4R6 for TCDQ displacement – A5R6 (NC) – Forecast MKB completion of staged installation (wk.16) Sector 67 – Warm-up in progress T~ 270K – Forecast Wk. 16: 300K + vacuum degradation Wk.17: warm 12/04/2013LSC - K. Foraz7 Today

Progress & forecast – P7 & Sec. 78 Point 7 – R2E is getting ahead: cable trays Sector 78 – In progress Warm up - T ~ 200K – Forecast: nQPS type - wk. 16 ELQA wk ~ /04/2013LSC - K. Foraz8 Today

Progress & forecast – P8 & Sec. 81 Point 8 & LSS8 – In progress R2E shielding A6L8, A4R8, MKI vacuum activities Upgrade and maintenance of collimator control systems – Forecast Electrical maintenance wk. 17 – No access except for authorized persons to the site & in underground – Night Wed. to Thur. – NO safety network = NO ACESS (procedure being edited) Sector 81 – Warm-up just started T~5K – Leak tests at cold wk. 16 – [80-300K] ~ Wk /04/2013LSC - K. Foraz9 Today

VSC consolidation – leak tests of arc cryomagnets prior to SMACC a)Global leak tests – Tightness check prior to W opening Longitudinal localization of known internal He leaks 4 arcs completed b)Local leak tests –Open priority interconnects (MSC), apply 6 bar (CRG) Localization of He leak to component level * LHC = 18’000 elastomer joints, 250’000 welds LS1 Leak Testing - Phase 1 12/04/2013LSC - K. Foraz Comments Air leaks found*4724No systematics Helium leaks present*4251 Helium leaks found3Good start ! Courtesy: P. Cruikshank TE-VSC

General Progress 12/04/2013LSC - K. Foraz11

Dashboards 12/04/2013LSC - K. Foraz12

Organisation & Reminders Phone numbers – LHC coordination phone = – MAD problems: EPIs are not required for the equipment protection, but for the person protection !!! No access means NO ACCESS – For this reason, during electrical maintenance the access to the site will be filtered !! – Proposal: anyone not respecting access restriction will go straight to sanction n°2 12/04/2013LSC - K. Foraz13

Conclusions So far..so Good SMACC starting 1 week ahead of schedule Some minor delays for R2E Please do remind your colleagues: safety 1st !!! 12/04/2013LSC - K. Foraz14