PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No 916266.

Slides:



Advertisements
Similar presentations
6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
Advertisements

MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
PIC configuration (maskable/unmaskable circuits) I. Romera MPP meeting –
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
New HV test specification for the LHC N. Catalan for the EI section.
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
MP3 report : W27 to W33 (22 slides, 10’ ?) J.Ph Tock for the MP3 team: TE-MPE : N. Catalan, R. Denz, M. Koratzinos, A. Verweij, M. Zerlauth TE-MSC : B.
Machine Protection backbone: Upgrades Session 5: Machine Protection and availability 5 th Evian Workshop – 2-4 June 2014 I. Romera Ramírez Acknowledgments:
September 19/20, 2007 SIS 100 Magnet cooling and cryogenic distribution.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
MP3 List of main Issues during March 2010 MP3 - Team.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
LHC circuit modeling Meeting 2 March PSpice Electrical modeling of the various LHC circuits, as a tool to: Describe the ac behavior of magnets Better.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
R.Giachino / M.Albert Be/op 30 th March 2015 LHC Machine check out 1v1.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Quench behavior of the main dipole magnets in the LHC By Gerard Willering, TE-MSC On behalf of the MP3-CCC team Acknowledgements TE-MSC, MP3, BE-OP, TE-MPE,
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Powering LHC magnets version 30/3/2007.
Review of the present non-conformities in view of HL-LHC
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
600 A circuits resistance measurements
MP3 Review Software tools
Powering the LHC Magnets
Recommissioning of sector 12 after a short warm-up during eYETS 2016/17 QBT, MP3 – May 2017 S. Le Naour.
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Status of Magnet Setup Cycling for LHC
Powering from short circuit tests up to nominal
B. Auchmann, D. Rasmussen, A. Verweij
Powering Interlocks Quench back of corrector magnets vs revised ‘Global Powering Subsector OFF’ functionality M.Zerlauth, W.Venturini, R.Wolf, G.Kirby.
Magnet Circuit performance at 6
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Summary of Week 11: 14 – 21 March
(damaged board on RQD/F)
Friday 31st August & night
Friday March 4th 08h32: Access for beam dump system.
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
(1 test missing on RQD/F)
Planning at 5 o’clock meeting Friday
Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Wednesday 23/2 Thanks CRYO!!!.
LHC Status Fro Morning 9-Sep
Thursday
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Review of hardware commissioning
Hi-pot results summary
Electrical measurements and diagnostics
Presentation transcript:

PGC tests Test procedure and acceptance criteria for the Powering of Group of Circuits EDMS No

PGC 1 : tests in the arcs 25/11/09S. Le Naour / MP3 meeting2 PGC 1.2 PGC 1.3 PGC 1.4 PGC1.5 PGC 1.6

PGC 1 : tests in the matching sections 25/11/09S. Le Naour / MP3 meeting3 Applicable in : IP1 - D2, Q4, Q5, Q6 IP2 - D2, Q4 IP4 - D4, Q5 and D3, RU IP5 - D2, Q4, Q5, Q6 IP8 - D2 Q4 PGC 1.8 PGC 1.9

PGC 2 : Heat run 25/11/09S. Le Naour / MP3 meeting4

When tests occured 25/11/09S. Le Naour / MP3 meeting5 1 : select sector 2 : select circuits (dfb/special) 3 : load T1/T2 4 : start

Tests summaries 25/11/09S. Le Naour / MP3 meeting6  Excel files with tests summary available on  Slenaour public/MP3/PGC/Sector12…  MP3 Repository / shared documents/PGC

Tests PGC /11/09S. Le Naour / MP3 meeting7  Ramp up of all circuits available to reach I_PNO at the same time, plateau of several minutes and ramp down of all circuits together  RCS circuits ramp down earlier.  When correctors circuits of triplets are included in the sequence, various trippings occured due to the too large ramp rate applied: ramp rate reduced to powered RCBXV and RCBXH circuits together

Tests PGC /11/09S. Le Naour / MP3 meeting8  Heater provoked quench on the main dipole circuits.  In sector 3-4, only a FPA was applied  In sector 1-2, quench provoked in C32R1 which have a non conformity on QH1 (2 low field heaters fired instead of 1 high field heater)  In sector 8-1 : data acquisition pbm on heater discharge Global protection activated in all sectors correctly

Tests PGC /11/09S. Le Naour / MP3 meeting9  Fast abord on 600A circuits Datestartendtest refcomments :308:00RCO.A45B1 RCD.A45B1 RCO.A45B2 RCD.A45B2 RCS.A45B1 RCS.A45B2 RQTL11.R4B1 RQTL11.R4B2 RQTL11.L5B1 RQTL11.L5B2 RQS.R4B2 RQS.A45B1 ROF.A45B1 RQTF.A45B1 RQTD.A45B1 ROD.A45B1 RSS.A45B1 RSF1.A45B1 RSD1.A45B1 RSD2.A45B1 RSF2.A45B1 RQS.L5B2 RQT12.R4B1 RQT12.R4B2 RQT12.L5B1 RQT12.L5B2 RQT13.R4B1 RQT13.R4B2 RQT13.L5B1 RQT13.L5B2 RSF1.A45B2 RSD1.A45B2 RSS.A45B2 ROD.A45B2 RSF2.A45B2 ROF.A45B2 RSD2.A45B2 RQTD.A45B2 RQTF.A45B2

Tests PGC /11/09S. Le Naour / MP3 meeting10  Fast abord on 600A circuits  Same sequence applied in all sectors :  FPA on RCO (40A)  RCD (-150A) tripped  FPA on RCS (550A)  no other circuit involved  FPA on RQTL9/10/11 (400A/550A)  no other circuit involved  FPA on RQT12/13 (400/550A)  no other circuit involved  FPA on RQS (2 magnets)  no other circuit involved  FPA on RQS (4 magnets)  RQTD/F, ROD/F, RSD/F1 & 2, RSS tripped  FPA on RSF1 (400A)  RSD/F1 & 2, RSS, ROD/F, RQTD/F, RQS (4 magnets) tripped  Only circuits on the same beam tripped, no influence between B1 circuits and B2 circuits

Tests PGC /11/09S. Le Naour / MP3 meeting11  Fast abord on 600A circuits ROD ROF RQS

Tests PGC /11/09S. Le Naour / MP3 meeting12  Current cycles in matching section circuits  Tests often/always made with PGC 1.2  Nothing special to report

Tests PGC /11/09S. Le Naour / MP3 meeting13  FPA on SC separation dipole  When quench heaters fired in RD, ramp down of all other IPD, IPQ involved in the matching section.  Sequence OK in each sector when applicable  Note : RU circuit not powered because not commissionned yet.

Tests PGC 2 25/11/09S. Le Naour / MP3 meeting14  Heat run of the complete sector. Pictures of TT891a variation available on my public/MP3/PGC/PGC2  Sector 1-2 : 4 valves regulation to improve : DACB34/42, DXCX02, DXBX01  Sector 2-3 all regulation OK now  Sector 3-4 : 6 valves regulation to improve : DAGB06/10/13, DAGC02,07,08 – Cryo start sometimes lost because of DAGB10  Sector 4-5 all regulation OK  Sector 5-6 : 1 valve regulation to improve : DAKC09  Sector 6-7 : Not done, but a plateau of 1½h for PGC1.5  Sector 7-8 : 3 valves regulation to improve : DAOC11, DMAC01, DXGX03

Tests PGC 2 25/11/09S. Le Naour / MP3 meeting15  Heat run of the complete sector.  Sector 8-1 : 12 valves regulation to improve DAAB03/06, DAAC01/09, DAPB14/43, DAPC10, DLAC11, DXAX01/03/04, DXHX06  Heat run on triplet  Heat run on triplet made with reduced current 3900A and 1900A  Heat run with 5900A in RQX.R2 : variation of 17K on TT893 with CL2, only 8K with CL1 : similar during PNO.d11  Heat run with 5900A in RQX.R5 not done

Tests PGC 2 25/11/09S. Le Naour / MP3 meeting16  Heat run on triplets.  Only circuits with HTS leads have been checked, but it will be worth checking on triplet correctors (here below RCBXV3.L1)