Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,

Slides:



Advertisements
Similar presentations
Fukushima Nuclear Disaster Moneer Aljawad, Abdulrahman Alshodokhi, Jericho Alves, Daniel Chief, Benjamin Kurtz, Travis Moore September 16, 2013.
Advertisements

Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Slide 1 NRC Perspectives on Reactor Safety Course Special Features of BWR Severe Accident Mitigation and Progression L. J. Ott Oak Ridge National Laboratory.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Assessing the Challenges Resulting from the Events at Fukushima Daiichi Nuclear Power Station A Preliminary Discussion March 25, 2011 Walter L. Kirchner.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Vermont Yankee Presentation to VSNAP 7/9/12 VY/Entergy Fukushima Response Bernard Buteau.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
WNFC San Francisco April, 2014 Learning the right lessons from Fukushima - A new paradigm for a brighter future.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
The Harnessed Atom Lesson Eight Concerns. What concerns do people have about nuclear power plants: Safety at nuclear power plants – Design features –
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
EVALUATING NUCLEAR POWER IN THE U.S. AND ITS CLEAN FUTURE Xingzhou Li Introduction to GIS.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
Nuclear Energy General Concept. In 2001, total US generation of electricity was 3,777 billion kilowatt-hours.
Japanese Nuclear Accident And U.S. Response May 17, 2011.
LIVE INTERACTIVE YOUR DESKTOP January 25, 2012 Green Power for a Digital World Presented by: Natalie Wood and Marvin Fertel.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
Nuclear disaster 3 mile. History In 1979 at three mile nuclear power plant which is in the united states. A cooling malfunction caused part of the core.
Ivan Li and Kyle Krogman.  Nuclear reactor meltdown on March 11 th 2011 near Fukushima, Japan  An earthquake and the following tsunami knocked out electrical.
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
Energy Industries of Ohio Southeast Energy-Water Interdependence Exercise Energy Assurance Program for the State of Ohio.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
Deepwater Horizon Oil Spill On April 20, 2010, an explosion on the Deepwater Horizon MC252 drilling platform in the Gulf of Mexico caused the rig to sink.
1 Crisis Management / Emergency Management Overview.
Fukushima Dai-ichi - LinkLink. Boiling Water Reactor – Video LinkVideo Link.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
The Pilgrim Power Plant By Khloe, Oliver, Galina, Robert and Rachel.
Section 2Nuclear Changes Classroom Catalyst. Section 2Nuclear Changes Objectives Describe nuclear fission. Describe how a nuclear power plant works. List.
THE MARCH 11, 2011 EARTHQUAKE- TSUNAMI DISASTER IN JAPAN REMEMBERING: PART 1 Walter Hays, Global Alliance for Disaster Reduction, University of North Carolina,
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
Fukushima Power Plant – Japan Post March 11, 2011
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Jim Hill Nuclear Management Company Nuclear Plant Operation under NRC Reactor Oversight Program.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Short how nuclear plant works how nuclear power works.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Theme C1: Flood management in arid regions ICOLD Workshop - 20 May 2016 Theme C1:Theme C1: Flood management in arid regionsFlood management in arid.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
What do you know of Japan’s Nuclear crisis? How about any past nuclear issues? Do you feel that nuclear power is safe? Why or why not? Question of the.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Nuclear Power.
Enhancing Safety at America’s Nuclear Energy Facilities
Spent Fuel Pool Instrumentation NRC Order EA
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
CR3 and Crystal River Energy Complex
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
Offerings for design safety from harmonization
NRC Cyber Security Regulatory Overview
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Nuclear Power.
REMOVAL AND RELOCATION OF SPENT NUCLEAR FUEL FROM THE SAN DIEGO REGION
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Possible Transition from Operating to Decommissioning
Vistra Energy and Illinois
Japanese Nuclear Accident And U.S. Response
Presentation transcript:

Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick, Exelon Nuclear Timothy S. Rausch, PPL Susquehanna James H. Lash, FirstEnergy Generation March 27, 2012

Key Points  Fukushima reactors are stabilized—no immediate health impacts to workers or residents near the plant  U.S. industry took immediate action to reconfirm safety and response capability; reassure public  Industry has been focused on collecting, analyzing data to ensure proper action and adding another layer of safety at U.S. reactors 2

Key Points  U.S. companies are installing new equipment for additional backup safety  Diverse, flexible coping strategy (FLEX) will meet NRC requirements  Nuclear energy remains vital part of U.S. electricity portfolio 3

Implications of Tsunami  Magnitude 9 earthquake rattles Japan – All nuclear power plants shut down safely  Massive tsunami—about 45 feet high—strikes the east coast  Total power failure disables critical safety equipment at Fukushima Daiichi reactors 4

Fukushima Daiichi Today  Reactors stabilized  New cooling systems operating  Decontamination under way  Debris removal continues  Assessing long-term impact of radiation releases 5 Source: Associated Press

Radiological Impacts in Japan  Despite significant radiation releases during the accident, residents at the plant were protected from health impacts – Emergency response plans worked as designed – Residents were evacuated promptly  No radiological consequences beyond Japan  Radiation health studies are ongoing  No danger to food supply: extensive monitoring of land, water, crops, fish and livestock will continue 6

U.S. Response to Enhance Safety  Reconfirmed safety of U.S. reactors immediately after events in Japan  Established a factual basis for action through extensive analysis of the events in Japan  Applying lessons learned at all U.S. reactors  U.S. industry bias for action results in actions and commitments in advance of NRC regulatory action

Proactive Industry Actions  Industry initiated plant inspections and evaluations provide foundation for more effective and quicker implementation of enhancements – Flood protection – Protection against earthquakes – Manage and mitigating a complete loss of electrical power – Instrumentation and containment integrity

FLEX Provides Additional Safety

FLEX: Industry Strategy for Action  Diverse, flexible coping capacity addresses key issues: – Provides coping for extended power loss – Maintains reactor and used fuel pool cooling capability – Protects against extreme external events  Performance-based, all-hazards safety approach  Portable backup equipment provides flexible response 10

Specific Actions Taken at U.S. Reactors  Nearly 400 major pieces of equipment acquired or ordered – 66 large portable generators – 62 diesel-driven pumps – 59 small load diesel generators – 13 fire trucks – 11 portable ventilation units 11

Examples of Additional Actions  Verified that equipment, procedures and staffing are in place to respond to threats  Verified capability to cope even during a complete loss of power  Verified each plant’s capabilities to protect against floods and fires after earthquakes  Enhanced capability to protect spent fuel pools against extreme natural events 12

13

Exelon Nuclear Stations Limerick Generating Station Montgomery County 2 Units (2,295 MW) Peach Bottom Atomic Power Station York County 2 Units (2,280 MW) Three Mile Island Generating Station Dauphin County Single Unit (852 MW) Exelon Nuclear owns/operates the largest nuclear fleet in the nation and the third largest fleet in the world.

PPL Susquehanna Multiple Backup Safety Features  Two Boiling Water Reactors capable of generating 2,600 megawatts, enough to supply 2 million homes – Located in Luzerne County, southwest of Wilkes-Barre – 1,000 full-time employees  Ground floor of plant 150 feet above river elevation  Multiple water sources include 25 million gallon pond on site  5 emergency diesel generators  “Black start” generator capable of powering battery chargers  Nearly 1,000 trained community volunteers supporting emergency plan

FirstEnergy Nuclear Power Plants: Safe, Reliable and Well Protected  Four units at three sites providing 4,000 megawatts, serving more than 3 million customers – Beaver Valley Power Station in Pa. – Davis-Besse and Perry plants in Ohio  Beaver Valley Power Station – Located northwest of Pittsburgh – Two Westinghouse units generate 1,815 megawatts – Unit 1 operations began in 1976; Unit 2 in 1987; Licenses renewed until 2036 and 2041, respectively – 1,000 employees

Nuclear Energy Today  Nuclear energy benefits – Clean – Safe and secure – Affordable and reliable – Economically beneficial  Forward-looking actions – License renewal – New plant licensing – Blue Ribbon Commission report on used fuel management 18 U.S. Electricity Production

Key Points/Questions  Fukushima reactors are stabilized  U.S. took immediate action to reconfirm safety and response capability  U.S. companies are installing new equipment for additional backup safety  Diverse, flexible coping strategy will meet NRC requirements  Safe nuclear energy remains vital part of U.S. electricity portfolio 19