CMS Detector Control Room Barrel Endcap YB-2 YB-1 YB0 YB+1 YB+2 Far tower Near tower Rack X4V22 Rack X3V22 Rack X2V22 Easy crate Link box Na tym rysunku.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Questionnaire Response
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
© red ©
CMS/CERN. Nov, 2001HCAL TriDAS1 HCAL Fiber Link Issues Use of CMS Tracker Fiber Links Drew Baden University of Maryland John Elias Fermilab.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
26 February 2002ATLAS Muon Electronics Meeting1 MROD: the MDT Read Out Driver Status of MROD-1 Prototype Adriaan König University of Nijmegen.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
Data Acquisition Software for CMS HCAL Testbeams Jeremiah Mans Princeton University CHEP2003 San Diego, CA.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
PXL Rack Layout Draft Leo Greiner January 2, 2013 DateCommentsPersonVersionApproved 01/02/2013Initial versionLG1.0LG 01/09/2013 add additional PS in WAH.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
AS- CCR Magnet Test Organisation Overall coordination : Austin Ball/Alain Herve, NN to be added Magnet/infra coordination : Andrea Gaddi Magnet.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
GRAPHING RELATIONSHIPS For each graph, determine the graphing relationship and record it on a white board.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Olga Vareli No!No! No!No! Yes!Yes! Black Olga Vareli.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
Track Sorter Slave chip TSS ASICs TSM: 3 pASICs TRACO ASICs.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
Jan Królikowski Warsaw University
Electronics for RPC Upscope
Fiber Installation for RUN 3&4
CMS SLHC Calorimeter Trigger Upgrade,
Irakli MANDJAVIDZE DAPNIA, CEA Saclay, Gif-sur-Yvette, France
Regional Cal. Trigger Milestone: Production & Testing Complete
Track Finder Crate, Backplane and Parts
4x5 SC array for the test beam in Apr 2007
HV-LV-DCS Status NEWS DCS Endcap Integration
Dr. Pierluigi Paolucci - INFN di Napoli
UXC55 ME Muon Endcap On Detector Layout
What Color is it?.
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Dr. Pierluigi Paolucci - INFN di Napoli
The Trigger Control System of the CMS Level-1 Trigger
FED Design and EMU-to-DAQ Test
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Prepared for CSC by Fred Borcherding FNAL
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

CMS Detector Control Room Barrel Endcap YB-2 YB-1 YB0 YB+1 YB+2 Far tower Near tower Rack X4V22 Rack X3V22 Rack X2V22 Easy crate Link box Na tym rysunku nie ma przekazywania danych, jest tylko struktura polozen (lokacji). Dane zaczynaja się w link boxach (patrz nastepny slajd) Detector Control room

S Link board M Link board Link Patch panel Link Sector cable Trunk cable Splitter board Trigger crate(12) Trigger board Splitter cable Splitter board Trigger board Splitter cable Shows only locationcable Link box (120) DetectorControl room Trigger crate(12)

Link box Slave Link board Master Link board Slave Link board Master Link board Slave Link board empty slot1 slot2 slot3 slot4 slot5 slot6 slot7 Opto module slot orange red orange green blue grey black red Sector cable Link Patch Panel Splitter board slot2 Trunk Cable Splitter board slot7 Trigger Crate DetectorControl room Trunk cable Sector cable Link Patch Panel Link Patch panel details

Trigger crate (12) TC Interface board VME contr. board Sorter crate(1) FS board HS board TC Interface board VME contr. board PC PC rack TC Sorter cable TC Sorter cable Final Sorter cable To GMT VME cable VME cable Trigger crate (12) Trigger and VME cotrol chainControl room

Readout control crate(1) DCC board (3) Slink cable Trigger crate(12) Trigger board GOH cable To GMT DCC Patch panel Trigger crate(12) Trigger board GOH cable Control roomReadout chain FMM cable To ~GMT