Erasmus User Support & Operations Center ESA Payload Operations Overview in Incr. 29-30: EDR, KUBIK-ROALD2, ERB-2 & EPO CONVECTION POIWG#30, 26-28 July.

Slides:



Advertisements
Similar presentations
Chief Electoral Officer, General Election for Lok Shaba 2014, Andhra Pradesh will be live streaming polling station for the purpose of recording.
Advertisements

A new Network Concept for transporting and storing digital video…………
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
ISS Institutional DTN Overview for CCSDS
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
Belgian User Support & Operations Centre Ham Video On-orbit Functional Commissioning - B.USOC Contribution ARISS Workshop 3 – 5 April 2014 ESTEC.
D. McMahon Generation of Ground ODFs ESA ODF-CB 3-5 March 2004 Gerd Soellner (DLR/Col-CC) Co-author Nathalie Gérard.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
Microsoft Application Virtualization 5.0: Introduction Mohnish Chaturvedi & Ian Bartlett Premier Field Engineer WCL312.
Computer and Information Science Ch1.3 Computer Networking Ch1.3 Computer Networking Chapter 1.
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
System Design and Deployment Status PDS Management Council Face-to-Face UCLA, Los Angeles, California November 28-29, 2012 Sean Hardman.
K A Y S E R - T H R E D E Conference and Exhibit on International Space Station Utilisation October October; Florida International Microgravity.
Berkeley HEDAW. HESSI Data Analysis Workshop (HEDAW) Welcome to Berkeley Logistics - McTiernan.
Development Report Engineering Node August 2006
The Copernicus Sentinel-3 Mission: Update on status Susanne Mecklenburg – ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams.
National Aeronautics and Space Administration (NASA) Glenn Research Center NASA Glenn Research Center (GRC) Acceleration Measurement and Analysis Projects.
TargetProcess - AGILE Project tracking tool Shashwat Gupta CS
Microsoft ® Official Course Module 6 Managing Software Distribution and Deployment by Using Packages and Programs.
Robot Quick Build Session Programming Session Produced by Ken York, Team 476 Ed Latimer, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma State.
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
UPOWG#23 – Huntsville Feb D SPACE Mental Representation of Spatial Cues During Spaceflight.
1 POIWG #38, July 2015 POIWG #38, July 2015 BIOTESC USOC, Switzerland Martin Haag & Jeannine Winkler BIOTESC
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Biolab Operations Preparation Overview D. Seibt, DLR MUSC POIWG #21 Jan MSFC Huntsville, AL.
Microgravity User Support Center (MUSC)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Robonaut Payload Systems.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #31, January.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
All rights reserved © 2010, Telespazio MARS USOC Operational Scenario Increment and POIWG.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
Lyndon B. Johnson Space Center Human Research Facility (HRF) HRF WORKSTATION 2 Brian Barras 1 HRF WORKSTATION 2 OVERVIEW/NOMINAL OPERATIONS Trainer: Brian.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
Exploitation of ISS Scientific data EGI-Aparsen Workshop March Science Park– Amsterdam – The Netherlands Cooperative ISS Research data Conservation.
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
ESA UNCLASSIFIED – For Official Use MPCC Project Ground Overview Peter Wellings, ESA/HSO-ICG 22 January 2015.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
Avatar Explore PROPOSAL NUMBERS Not available SCIENCE TEAM Erick Dupuis, Canadian Space Agency RESEARCH OBJECTIVES Demonstrate an operational and technical.
Microgravity User Support Center (MUSC) Payload Overview POIWG, July Chart 1> MUSC Payload Overview > Patrick Hambloch POIWG > July 2013.
NASA – MSFC, Huntsville, Alabama Muscle Atrophy Research and Exercise System (MARES) Operations Summary Part I/II Karen Somers EO20/ Operations Lead
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
POIWG#30 E-USOC Operations in Increment José Miguel Ezquerro Navarro E-USOC/UPM July, POIWG #30, Hunstville, AL.
Bodies In the Space Environment (BISE) Operations Summary Prepared by Amy Jupin Operations Lead EO
National Aeronautics and Space Administration (NASA) Glenn Research Center SAMS KU Forward Lessons Learned 1 Kevin McPherson NASA GRC Payload Operation.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Obsolescence Driven Avionics Redesign (ODAR) Status POIWG #32, July.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
The Remote Controls of Greenhouses as part of Bio-regenerative Life Support System for future Planetary Outposts: a challenging task to ensure the survivability.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
Belgian User Support and Operations Centre B.USOC SOLAR Operations Concept and Services SOLSPEC Workshop 10 March 2015 BIRA/IASB.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
CBSE Cold Stowage Hardware Overview William Crysel UAB/CBSE
Page No. 1 Overview Kelvin Nichols Payload Operations and Integration Center EO50 SSCN Delay Tolerant Networking (DTN)
Rosetta Science Ground Segment Overview
ISS Institutional DTN Overview for CCSDS
Exploitation of ISS Scientific data - sustainability
Presentation transcript:

Erasmus User Support & Operations Center ESA Payload Operations Overview in Incr : EDR, KUBIK-ROALD2, ERB-2 & EPO CONVECTION POIWG#30, July 2011 Erasmus USOC Arif Arshad

Erasmus User Support & Operations Center 2 Erasmus Ground Controllers (4): Michiel Meekes Jan Willem Van der Laan Nizar Syed Nicolae Mihalache USOC Management: Leo Timmermans Erasmus Building, ESA/ESTEC, Noordwijk (The Netherlands) Erasmus Operators (8): Paul Dujardin Arjan Kramer Arif Arshad Jean-Francois Daloze Sabine Carrière Ansel Kim Vijle Pieter Teeuwen Nizar Syed Erasmus Team Erasmus USOC (1)

Erasmus User Support & Operations Center 3 Erasmus USOC (2) PayloadIncrementPeriod EuTEF16 to 20Feb 2008 – Sept 2009 EDR/PCDF18 to 20March 2009 – July 2009 FOCUS22Feb 2010 ERB222 to …From Feb 2010 EDR/KUBIK- Drawer 23 to …From March 2010 EPO- Convection 30October Erasmus USOC is responsible for the Columbus European Drawer Rack (EDR), ERB2, KUBIK Drawer Operations EDR EM, KUBIK Drawer and ERB2 at Erasmus

Erasmus User Support & Operations Center 4 EDR Maintenance/Activities (Incr ) European Drawer Rack Current configuration: Kubik Drawer in D1/D3, connected to EDR UUDP J3 4 PU dummy panel in D3 ERB2 camera on MUB, connected to EDR UUDP J4, EDR LAN J10 & EDR VMU J12 HSSL Operations planned for Incr EDR APSW upgrade (ground only) EDR HCI upgrade (Crew) Notes: Ops products ready for ground activity, available in IPV, for the Crew activity minor upgrades pending PD: Thales Alenia Space - Italia PEM: Simone Giusto (TAS-I) EXAM: Paul Dujardin (NLR)

Erasmus User Support & Operations Center EDR - KUBIK-3 & RESLEM/ROALD2 EDR supporting KUBIK3/ROALD2 Operations (resp. BIOTESC) ROALD2 to be inside Stand-Alone KUBIK-3, powered by EDR UUDP J5 power connector 3 days of Operations, with 1 day for downlink of data Data to be downloaded through EDR MMU by using the EDR laptop BIOTESC is the FSC for the KUBIK- 3/ROALD2 Experiment

Erasmus User Support & Operations Center 6 ERB-2 Operations (Incr ) European Recording Binocular (second generation) Objectives: Detailed 3-D geometrical model of the current configuration inside the ISS To develop narrated 3-D video material for immediate and later use for promotional and educational purposes. Operational configurations: Stand-alone (carried by crew), powered by external batteries Connected to EDR with multi-use bracket and via EDR Video Management Unit (for data downlink) and power supply ERB-2 connected to EDR PI: Massimo Sabbatini (ESA) PD: Pantelis Poulakis (ESA); Cosine (NL), TSD (It) PIM: Simone Giusto (TAS-I) EXAM: Arjan Kramer (NLR)

Erasmus User Support & Operations Center 7 ERB-2 Operations (Incr ) Operational status: Launched with 36P (Feb 2010) Commissioning successfully completed in Incr ISS Fly-Through & Work sessions, free-use and several HRD file downloads performed 1 ERB2 Hard Disk returned with ULF6 UHB in Erasmus Centre ready to support life streaming events Operations proposed for Incr (Voluntary Science) Continuation of pre-defined protocol (Fly-through, Work & Life on ISS and Mapping) Life streaming video download to User Home Base (UHB) for image collection Notes: Ops products available in IPV, use of JEDI scripts Crew is informed that ERB2 VS filming activities may be published for PR purposes and about the list of restricted items not to be filmed Fly-through overview (8 th Jan 2011) A : Columbus B : Node 2 C : Node 1 D : Cupola

Erasmus User Support & Operations Center EPO (Incr ) Education Program Operations Convection Objectives: Educational program to demonstrate the gravity density-driven convection, found on many scales and processes driving biodiversity on our planet (atmospheric circulation) Operational configurations: To be uploaded by 45P 26 th October Experiment to be done in Columbus, some picture might be taken in CUPOLA Movie to be made by Canon G1, pictures by Nikon D3S

Erasmus User Support & Operations Center 9 Activities planned beyond Preparation activities for :  FASTER (Facility for Adsorption and Surface Tension Research) class-2 payload to be installed in EDR rack (D2/L2). The preparation activities (operational products, ground segment, validation and simulations) are coordinated by Erasmus USOC (FRC for EDR class-1 payload) together with MARS Center (FSC for FASTER class-2 payload). FASTER launch schedule is TBD, NET March The operational phase for FASTER is planned for Incr  EML (Electro-Magnetic Levitator) class-2 payload to be installed in EDR rack, and to be operated by MUSC-USOC (FSC). EML is scheduled for launch with ATV-4. The operational phase for EML is planned for Incr FASTER FC & EU EML

Erasmus User Support & Operations Center 10 Activities planned beyond Preparation activities for :  MUE (Miller Urey Experiment) Investigating pre-biotic chemical pathways for the synthesis of organic compounds in the proto-solar nebula. Payload to be installed in the Microgravity Science Glovebox (MSG) in the US lab. Erasmus USOC is the FRC for MUE. Launch date is TBD, OPS tentatively for Incr 31/32.

Erasmus User Support & Operations Center 11 Acronyms list APSWApplication SoftWare BIOTESCBIOTEchnology Space Support Centre (Zurich) FASTERFacility for Adsorption and Surface Tension Research EMLElectro-Magnetic Levitator EUExperiment Unit EUTEFEuropean Technology Exposure Facility EXAMExperiment Activity Manager FCFacility Controller FOCUSFoam Casting and Utilization in Space FRCFacility Responsible Center FSCFacility Support Center IPVInternational Procedure Viewer JEDIJoint Execute Package Development and Integration MARSMicrogravity Advanced Research and Support Center (Naples) MUBMulti-Use Bracket MUEMiller-Urey Experiment MUSCMicrogravity User Support Centre (Cologne) PCDFProtein Crystallization Diagnostics Facility PDPayload Developer PEMPayload Engineering Manager PIPrincipal Investigator PIMPayload Integration Manager RESLEM/ROALD2Role of the Endocannabinoid System in human Lymphocytes Exposed to Microgravity UHBUser Home Base USOCUser Support and Operation Centre UUDPUpper Utility Distribution Panel VSVoluntary Science