Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University.

Slides:



Advertisements
Similar presentations
Ultimate Storage Rings PEP-X and SPring-8 II R. Hettel for the PEP-X design team and T. Watanabe et al., SPring-8 FLS 2012 JNAL March 7, 2012.
Advertisements

Slide: 1 Welcome to the Non Linear Beam Dynamics Workshop P. Elleaume Non Linear Beam Dynamics Workshop, ESRF May 2008.
USR-WS (Beijing) Oct. 30 – Nov. 1, 2012 K. Soutome (JASRI / SPring-8) on behalf of SPring-8 Upgrade Working Group Injection Scheme for the SPring-8 Upgrade.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Injection Session – Close-out Workshop on Accelerator R&D for USRs Working Group J.H. Chen (IHEP), O. Dressler (Helmholtz ZB), R. Hettel (SLAC), Y. Jiao.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Optimization of dynamic aperture for the ESRF upgrade Andrea Franchi on behalf of the ASD Beam Dynamics Group Workshop on Accelerator R&D for Ultimate.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
Studies on Lattice Calibration With Frequency Analysis of Betatron Motion R. Bartolini DIAMOND Light Source Ltd FMA workshop, Orsay, LURE, 1 st and 2 nd.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Recent Developments at Diamond Ian Martin On behalf of the Diamond Team Particle Accelerators and Beams Group Meeting Daresbury Laboratory 10 th April.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
Nonlinear Dynamic Study of FCC-ee Pavel Piminov, Budker Institute of Nuclear Physics, Novosibirsk, Russia.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
Status of the Diamond Light Source upgrade EuCARD2 topical workshop Barcelona, 23 April 2015 R. Bartolini. A. Alekou, M. Apollonio, R. Fielder, I. Martin,
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
A DDBA lattice upgrade of the Diamond ring R. Bartolini, C. Bailey*, M. Cox*, N. Hammond*, R. Holdsworth*, J. Kay*, J. Jones**, E. Longhi*, S. Mhaskar*,
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
SPring-8 upgrade : a fast kicker system for beam injection Japan Synchrotron Radiation Research Institute (JASRI) SPring-8 T. Nakamura CFA Beam Dynamics.
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Diamond upgrade options R. Bartolini Diamond Light Source and John Adams Institute, University of Oxford IoP PAB, Huddersfield 8 April 2016.
Low emittance rings for light sources ICFA Higgs Factory Workshop, FNAL, 16 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Investigation of Injection Schemes for SLS 2.0
Muon Collider Physics Workshop FNAL November 10-12, 2009 Muon Collider Lattice Design FERMI NATIONAL ACCELERATOR LABORATORY US DEPARTMENT OF ENERGY f Y.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
Diamond-II upgrade toward ultra-low emittance T. Pulampong University of Oxford Octoberfest October 2014 Royal Holloway, London.
Light Source Upgrade Projects R. Bartolini Diamond Light Source and John Adams Institute, University of Oxford 3 rd EUCARD2 Annual Meeting Malta, 26 April.
XU Gang IHEP, Beijing, China Oct. 30, 2012, Huairou, China
Off-axis injection lattice design studies of HEPS storage ring
M. Apollonio - Low Emittance Design MAXIV - Lund
Low Emittance Rings 2014 Workshop
Update on Diamond II and DDBA upgrade
Large Booster and Collider Ring
Non-linear Beam Dynamics Studies for JLEIC Electron Collider Ring
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
Recent Studies of Injection System at
Diamond upgrade M. Apollonio – Diamond Light Source Ltd
First Look at Nonlinear Dynamics in the Electron Collider Ring
Pretzel scheme of CEPC H. Geng, G. Xu, Y. Zhang, Q. Qin, J. Gao, W. Chou, Y. Guo, N. Wang, Y. Peng, X. Cui, T. Yue, Z. Duan, Y. Wang, D. Wang, S. Bai,
PETRA IV Lattice Studies
The new 7BA design of BAPS
R. Bartolini Diamond Light Source Ltd
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
Overview of optics corrections at Diamond and plans for Diamond-II
SPEAR3 Lower Emittance & Nonlinear Dynamics
Thursday Summary of Working Group I
Negative Momentum Compaction lattice options for PS2
Pulsed Sextupole Injection for Beijing Advanced Photon Source
PEPX-type BAPS Lattice Design and Beam Dynamics Optimization
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University of Oxford

Brilliance improvement for Diamond reduced coupling 1%  0.3% 300 mA  500 mA reducing diamond emittance with present hardware 2.7 nm  2.1 nm lattice test – ongoing: issues with SCWs Initial studies for an ultra low emittance lattice for Diamond-II 5BA 7BA, and modified 4BA Thanks to T. Pulampong, R. Walker, J. Kay and N. Hammond Brilliance upgrade at Diamond ESLSXX Workshop, Bessy II, 19 November 2012

Emittance in 3 rd GLS, DR and B-factories Transverse coherence requires small emittance Diffraction limit at 0.1 nm requires 8 pm ~ 2012 ?

upgrade with Diamond-II (200pm): 300mA and 1%K Brilliance plot using U27 – 72 periods 2 m long with Kmax = mm gap Tuning curves computed with Spectra 8.0 Assuming the operation with a 200pm lattice ESLSXX Workshop, Bessy II, 19 November 2012

Low emittance design for a Diamond-II upgrade (WIP) Wishlist for the upgrade of an existting medium size machine emittance lower than 200 pm in baseline (at least a factor 10 better than now) minimal changes to the machines Leave the straight section as they are reuse grider and/or magnets if possible beamline remains where they are (no offset or angle) avoid long interruptions. find options that can be phased... realistic engineering constraints (next…) ESLSXX Workshop, Bessy II, 19 November 2012

Engineering constraints on lattice design Magnet and geometric constraints quadruple gradient (100T/m) MAX IV has 40.4 T/m quadrupoles in dipoles (30 T/m)MAX IV has 8.68 T/m sextupoles (7000 T/m 2 )MAX IV has 2*2216 T/m 2 space between magnets (hard edge) 10 cm MAX IV has 7.5 cm Apertures = 20 mm diameter in arcsMAX IV inner diam. 22 mm ESLSXX Workshop, Bessy II, 19 November 2012

5BA – 140 pm

5BA cell 14 quads per cell 14 sextupoles 10 cm distance Straight section length slightly reduced 11 m  9.5 m 8.3 m  6.5 m Optics matched and optimised with MOGA (quads vs emittance) ESLSXX Workshop, Bessy II, 19 November 2012

Parameters Total length Natural emittance Natural chromaticity : hor./ver. Straight length : long/short m pm-rad -152/ m/ 6.5 Chrom(0,0) S7X:SEXT,L=0.1,K2= S7Y:SEXT,L=0.2,K2= Gradient in bend < 15 T/m Quads gradient < 55 T/m

5BA sextupoles compensation 5 pi horizontal phase advance each cell, 5 pi vertical phase advance every two cells 5π5π 5π5π ESLSXX Workshop, Bessy II, 19 November 2012

Some 5BA solutions from MOGA (WIP) 2 mm DA Optimisation just started Large tuneshift with amplitude to be compensated ESLSXX Workshop, Bessy II, 19 November 2012

Driving terms analysis (WIP) Chormatic sextupoles only – no harmonic sextupoles with harmonic sextupoles

Issue with path length and alignment of straights Keeping the same circumference (same RF and harmonic number) generates an offset in the position of the straight sections. This will require offsetting the beamlines – 1 cm is deemed acceptable ESLSXX Workshop, Bessy II, 19 November 2012

M. Borland quoting B. USR WS “if you can inject off-axis you have not pushed your lattice hard enough” 7BA – 45 pm

7BA - giving up more straight section length V and H sextupoles in dispersion bump only 14 quads per cell 8 Sextupoles per cell 10 cm distance Straight section length slightly reduced 11 m  8.0 m 8.3 m  5.0 m ESLSXX Workshop, Bessy II, 19 November 2012

7BA – 45 pm emittance Parameters Total length Natural emittance Natural chromaticity : hor./ver. Straight length : long/short m 45.7 pm-rad -348/ m/ 5.0 m S7X: SEXT,L=0.3,K2=248.9 S7Y: SEXT,L=0.3,K2= Chromatic Sextupoles (0,0) Gradient in bend < 30 T/m Quads gradient <100 T/m

doubling the number of beamlines while still pushing the emittance down Modified 4BA pm 4BA with an additional short straight section between the dipole pairs emittance not pushed as for a pure 4BA but can double the number of straight sections Length of additional straight sections forced to be at least 3 m while keeping the remaining 6.7 m and 9 m straight sections

Modified 4BA cell Broken the 4 BA cell to leave 3 m space 12 quads per cell 10 Sextupoles per cell 10 cm distance Straight section length slightly reduced 11 m  9.7 m 8.3 m  6.7 m ESLSXX Workshop, Bessy II, 19 November 2012

Modfied 4BA – one superperiod Ring circumference shrinks from to > loss 1 harmonic of RF Parameters Total length Natural emittance Natural chromaticity : hor./ver. Straight length : long/short/middle m 314.7pm-rad / /6.7/3 Gradient in bend < 15 T/m Quads gradient < 70 T/m

4BA 561m footprint comparison with the existing ring Δ: cm Δ: 0.19 cm Δ: 0.39 cm Current Diamond Modified 4BA

MOGA optimisation for DA just started Revising also tune point 12 quadrupoles per cell 10 sextuples per cell 1 mm DA insufficient (WIP) ESLSXX Workshop, Bessy II, 19 November 2012

5BA c oupling 10% rms bunch 0mA 1.8 mm Emittance blow up with IBS ESLSXX Workshop, Bessy II, 19 November BA coupling 10% rms bunch 0mA 1 mm Emittance blow up for the modified 4BA (280 pm) less important (300pm 500 mA) coupling 10% rms bunch 0mA 1.8 mm

4 wires pulsed kicker magnet for Diamond Cross section of 4 wires pulsed kicker with the generated B field Provide Flat field for both injected and stored beam Long straight septum Injected beam Matching cell PM A pulsed kicker magnet can be used for beam injection instead of conventional 4 kicker magnets 15mm 14mm Injected beam stored beam Copper wire More simple for operation and maintenance. Much smaller perturbation kick on the stored beam (good for top-up mode). Require smaller space of just one kicker magnet of ~ 40 mm long. Horizontal magnetic field Thanks to P. Kuske and O. Dressler

Multi-turn tracking shows a beam injection efficiency >98% if the kicker is located at the end of straigth 2 1 st turn 2 nd turn 3 rd turn 4 th turn 5 th turn Acceptance Tracking studies of injection with a pulsed kicker Tracking with kicker magnet turned only on the first turn The injected beam can be kicked inside the machine’s acceptance Injection position Injected beam after 5turns Injected beam ESLSXX Workshop, Bessy II, 19 November 2012

Effect on the stored beam Pusled quadrupole kicker4wires pusled multipole kicker The stored beam at the position of pulsed multipole kicker 4wires pulsed multipole provides flat field at the position of the stored beam Tracking results show no perturbation on the stored beam.

ESLSXX Workshop, Bessy II, 19 November 2012 Conclusion and (some) open issues Leaving straight sections as they are looks very complicated. No space: the straight section must be slightly shortened 5BA, 6BA, 7BA and a less aggressive design with more beamlines (4BA – modified) are under investigation DA and lifetime studies crucial for all such designs Alternative injection schemes are under study Collective effects, Harmonic Cavity for bunch lengthening, round beams to be studied phase out installation strategy to avoid long interruptions still to be found.. However the subject is now seriously tackled by a large community, some rings are already solved (PEP-X at 10 pm) and new solutions will likely appear. Benefits from this worldwide effort are foreseeable.