Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop.

Slides:



Advertisements
Similar presentations
Andrew Moss ASTeC MICE RF workshop 16t h February 2012 Daresbury Laboratory Response to RF review for the MICE RF system.
Advertisements

RF Specification discussion MICE RF workshop 16 th April 2012.
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
PAL/POSTECH 제 2 회 한국 국제선형충돌가속기 워크숍 Waveguide System for Linear Collider Woon-Ha Hwang Linac Division Pohang Accelerator Laboratory 2005,12,28.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
325 MHz RF Cave and SC Spoke Cavity Tests Robyn Madrak – Accelerator Physics Center (APC) for the HINS/Project X Group.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
RF Power R&D David Wildman May10, 2005 Slides “borrowed” from: G. W. Foster, A. Moretti, D. Sun, I. Terechkine, D.Wildman,& D. Wolff.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Conventional Source for ILC (300Hz Linac scheme and the cost) Junji Urakawa, KEK LCWS2012 Contents : 0. Short review of 300Hz conventional positron source.
Andrew Moss ASTeC 7 th December 2011 MICE RF System.
MEBT & RT CH Section Thomas Page Fermilab Accelerator Advisory Committee May 10 th – 12 th, 2006.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
F HINS Schedule of Activities in Meson During FY08 Bob Webber AD Safety Meeting December 5, 2007.
RF Distribution Alternatives R.A.Yogi & FREIA group Uppsala University.
Fermilab I. Terechkine1 RF Phase Shifter R&D Proton Driver Review March 15, 2005 T. Barrak, B. Foster, I. Gonin, M. Huening, V. Kashikhin, T. Khabiboulinne,
1 C-Band Linac Development Satoshi Ohsawa 2004.Feb.19LCPAC.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Fermilab High Intensity Neutrino Source R&D Program - Mission, Status, Plans, and Support Needs - For AD Department Heads March 2007 Bob Webber.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Anders Sunesson RF Group ESS Accelerator Division
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
805 MHz Status IIT NFMCC Meeting March 12-15, 2006 A. Moretti March 12, 2006.
HINS Front-End R&D --- Status and Plans Bob Webber Fermilab Accelerator Advisory Committee August 7, 2007 Update of May 10 th – 12 th, 2006 AAC Presentation.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Jan 12, 2005G.W.Foster - Proton Driver General Meeting Proton Driver General Meeting Kick-off Presentation G. W. Foster PD General Weekly Meeting Jan 12,
MTA RF Status 01/31/ 2007 NF&MCC Meeting UCLA A. Moretti.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
DTL Option for MEIC Ion Injection Jiquan Guo, Haipeng Wang Jlab 3/30/
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
F A Fermilab Roadmap Dave McGinnis May 28, f Fermilab Roadmap - McGinnis Timelines  Divide the road map into three parallel paths  ILC - Energy.
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
Project X RD&D Plan 325 MHz Linac including High Intensity Neutrino Source (HINS) Program Bob Webber AAC Meeting February 3, 2009.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
650 MHz Solid State RF Power development at RRCAT
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
Linac Design: Single-Spoke Cavities.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
High Intensity Neutrino Source HINS Linac Front-End R&D --- Systems Integration, Beam Diagnostics Needs, and Meson Lab Setup Bob Webber.
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
The ISIS Dual Harmonic Upgrade
Second SPL Collaboration Meeting, Vancouver May 2009
Notkestrasse 85, Hamburg, Germany
CW Operation of XFEL Modules
CEPC RF Power Sources System
FAIR pLinac RFQ Meeting pLinac RF Power Sources
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
RF introduction Anders Sunesson RF group leader
ERL Director’s Review Main Linac
RF system for MEIC Ion Linac: SRF and Warm Options
Presentation transcript:

Project X High Power 325 MHz RF Distribution and Control Alfred Moretti, Nov 12, 2007 Project X Workshop

Fermilab 2 Outline Layout of the Entire 325 MHz System Description of RF coupling Network to the beam Accelerating Cavity. Description of Terms: Qo, Qext, Q L, β Description of 90 Deg Hybrid as a Vector Modulator and Experimental results. Description Distribution System Conclusions

Fermilab 3 Layout of High RF Power 325 MHz, 600 MeV Section of Project X H¯H¯ RFQ 18 RT Cav. 18 SSR1 33 SSR266 TSR ······································ ·········· ············ KLY (5) 2.5 MW Klystrons Power Divider (9) Main Power Dividers 2 Cryo- modules 3 Cryo-modules 11 Cro-modules Project X 600 MeV H¯ Linac: Beam 9 mA for 1.0 ms at 5 Hz 15 mA H¯ sourse 2.5 MeV RFQ;18 Room temperature spoke cavities 117 Superconducting Spoke cavities in 16 Cryo-Modules (5) 2.5 MW 325 MHz Klystrons 137 Power Couplers for the cavities; 2 are used in the RFQ Note: The First Stage of HINS will have one Klystron driving Room temperature and Superconducting Cavities

Fermilab 4 Typical Trunk Line Power Coupling Network for Each String of Cavities 4-Way Power Divider To Other Cavity Strings Klystron Klystron: Toshiba, Modified J-PARC, Frequency & Diode Type RF power source; Toshiba E3740Fermi Klystron Located outside the cave Each klystron Supplies RF power to many cavities. VM Hybrid Directional Coupler Dual Directional Coupler Provides a fixed amount of power to its Vector Modulator Passes remaining power downstream to the other cavities in its string. Variable +/- 0.5dB within Specs (VSWR & Isolation. Shorted Ferrite line Vector Modulator Hybrid with shorted Ferrite stubs with Magnetically modulated Electrical Phase Length Provides Phase and Amplitude control. (VM) Vector Modulator Circulator Load Circulator/Isolator; Power from the vector modulator Output goes to the Circulator and then on the cavity Power reflected from the cavity goes into the Load providing a matched condition to the VM and driver. In OUT Load Cavity Beam

Fermilab 5 Definitions of Qo, Q ext, Q L, β Qo = ωE/P L, E=Stored Energy P L = RF power Loss in walls of the cavity ω = 2π f, f is frequency Q ext =ωE/P rad, P rad RF power radiated out the coupling hole and wave guide to RF power source Q L =ωE/(P L + P rad ); β= Qo/Q ext = Z in /Z 0 Qo= Q L ( 1+ β); τ ε= Q L / π f E PLPL Empty Enclosed Cavity E PLPL P rad Z in

Fermilab 6 90 Deg Hybrid as a Vector Modulator (VM). Scattering Matrix S 0 0 C jC S = 0 0 jC C C jC 0 0 jC C 0 0 b = S a for a 3 dB Hybrid C=0.707 and b 2 = Cos ((θ 3 – θ 4 )/2) Phase = (θ 3 + θ 4 )/ 2 a1a1 a2a2 a3a3 a4a4 b4b4 b1b1 b3b3 b2b2

Fermilab 7 Mapping of VM with 60 Degree Section Added to One of the Ferrite Phase Shifters 0 Amplitude vs. Phase Power output vs. Phase.

Fermilab 8 cavity phase shifters hybridcirculator water load 6kW input flexible coax to cavity Vector Modulator Test with Cavity: 6kW Slide Provided by Robyn Madrak & Dave Wildman

Fermilab 9 Vector Modulator Test with Cavity: 6kW Phase shifters (solenoids) driven independently by 2 supplies Output power ~ cos 2 [(  1 -  2 )/2] Relative levels (range) = 13.6 dB current, solenoid 2 current, solenoid 1 output power: cavity gap monitor current, solenoids 1 and 2 phase detector: cavity gap monitor relative to input Phase shifters (solenoids) driven in series by 1 supply phase ~ (  1 +  2 )/2 phase range ~ 155 degrees Slide Provided by Robyn Madrak & Dave Wildman

Fermilab 10 Output Range: Single Phase Shifter Gyromagnetic resonance (lossy region) H = I(solenoid) * (#turns/cm)*4  /10 Slide Provided by Robyn Madrak & Dave Wildman → Vector Modulators work well to > 75 kW phase ~ (  1 +  2 )/2 Low Power Test High Power Test

Fermilab 11 Layout of the RF Fan-out for a typical section of the 325 MHz Linac Typical Section of the high power RF distribution The 325 MHz high power line is shown supplying RF Power to 8 cavities. It has 7 directional couplers. The last Coupler supplies power to 2 cavities. It has 8 VM’s and 8 circulators with their attached loads. Directional Couplers To Other Hybrids VM’s Circulators Loads

Fermilab 12 Typical High RF Power Distribution 325 MHz Linac 1.0 MW RFQ and RT Cavities 1.1 MW to SSR1 and SSR2 Cavities MW to SSR1 Cavities MW to SSR2 Cavities Equal Power Split (EPS) Equal Power Split (Equal Power split) EPS EPS RFQ RT Cavities SSR1 SSR1 SSSR2 EPS 9 Cav5Cav4Cav Klystron

Fermilab 13 Directional Couplers Coupling Factors for each String of Cavities RT Cav at 9 ma RT Cav at 16 ma SSR1 Cavities No Current Difference SSR2 Cavities No Current Difference Note that the First 3 Cavities in the RT cavity string are the 2 debunching Cavities and the first RT accelerating cavity used as a debuncher,

Fermilab 14 Beam Loading Effect and Feedback Compensation φsφs Beam Induced Voltage Beam Induced Cavity Voltage φdφd Required Acc. Voltage Amplitude and Phase Feedback Control

Fermilab 15 Reflected Power with and without beam Matched Point at beam time 16 ma No Beam Case Pulse Shape 16 ma Case

Fermilab 16 Conclusions It is possible with one vector modulator per cavity to commission the Project X linac at low current upto 10mA with (5) 2.5 MW, 325 MHz Klystron. Major Components are out for bids and under study. Variable (+/- 0.5 dB) Hybrids (Power dividers) Vendor solicitation are in progress with promising results. Vector modulators have been tested and have exceeded design specifications.