WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.

Slides:



Advertisements
Similar presentations
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Progress and Plan for Superconducting RF Cavity RF Group.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
Low Emittance RF Gun Developments for PAL-XFEL
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Anders Sunesson RF Group ESS Accelerator Division
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
WP8-HGA High Gradient Acceleration M. Biagini (INFN-LNF) WP8 coordinator Tiara Kickoff Meeting, CERN, Feb , 2011.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: ID group Thomas Schmidt :: Insertion Devices :: Paul Scherrer Institut SwissFEL.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps Towards Beam Commissioning: Timing & Synchronization Group Stephan Hunziker for the Timing & Synchronization.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Intra Pulse Phase Control Manuel Brönnimann :: Paul Scherrer Institut LLRF Workshop 2015.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: Low Level RF system group Thomas Schilcher :: Paul Scherrer Institut SwissFEL.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
ELENA installation progress F. Butin / ELENA collaboration.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN SwissFEL Timing System status & plans Babak Kalantari :: Large Research Facilities /Controls :: Paul Scherrer Institut.
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
S1G Experiment Schedule Plan
Steps Towards Beam Commissioning: BPM System
Complementary ISTC Projects #3888, 3889p
Illustration of electronic in tunnel
Steps towards beam commissioning: Magnet power supplies
352MHz Klystron Control for the 3MeV Linac test stand
XFEL Vacuum System Commissioning
DC Injector and Space Charge Simulation Status
LLRF Controls Outline Requirements External Interfaces Schedule Design
Paul Scherrer Institut
WP Coordinaten XFEL RF Operation
Steps towards beam commissioning: Photon Diagnostics
Injector Performance Requirements Conventional Facilities Update
Revised Commissioning Strategy
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Injector: Introduction D. H
LINAC4 commissioning plans etc.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Injector Commissioning Dates ( )
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Injector / Linac Installation Current Status
RF systems introduction
Ciprian Plostinar Workshop on Testing and Commissioning
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
LCLS Injector System Overview D. H
The RF Control System for the SwissFEL
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Accelerator Installation Schedule
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Presentation transcript:

WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 21 January 2016 FHNW Campus Brugg-Windisch

SwissFEL Injector Page 2 StationStructureModulatorKlystronBand Gun1PSI1ScandiNova1ThalesS-Band Booster6RI4ScandiNova4ThalesS-Band X-Band2CERN1ScandiNova1SLACX-Band Deflector1INFN1ScandiNova1ThalesS-Band Linac 1 S band (2 x4 m) Gun Laser Heater Booster1Booster 2 BC 1 S band (4x4 m) X band (2 x 0.75 m) Deflector C band (4 x 2 m) SINEG01 SINSB01SINSB03SINXB01 SINDI01S10CB01 SINSB04 SINSB02

SwissFEL C-Band Linac Page 3 S10CB01S20CB01S30CB01S30CB14.1S30CB13 LinacStructureModulatorKlystronBand Linac 136PSI9Ampegon9ToshibaC-Band Linac 216PSI4Ampegon4ToshibaC-Band Linac 352PSI13ScandiNova13ToshibaC-Band Deflector2MHI0---C-Band

Project Milestones Page 4 9 C-band modules Ref. T. Schietinger * *

SINEG01: Installation of the RF gun system Page 5  Modulator transport  Modulator assembly (water, oil) + klystron (shield)  Interlock cabling (LLRF and electricians)  Modulator connection to grid and tests  Modulator IOC commissioning  Diode tests  Cooling stations ready (KKV01)  Water cooling RF Gun  Installation of the RF waveguides and water connections  Laser alignment on the cathode  Installation of the load-lock chamber  Bake-out and leakage tests  RF measurements  LLRF activities  PSYS tests  Ready for first RF  RF conditioning – 1 week  LLRF Optimization (with cooling system)  Ready for beam Legend: Done, To be done, Interfaces to other expert groups Installation Sequence (Ref.: Installationen für Injektor Commissioning -

SINSB01 and SINSB02 systems Page 6  Modulator transport  Modulator assembly (water, oil, shield klystron, housing)  Modulator connection to grid & tests  Diode tests  Cooling stations ready (KKV01)  Connection water cooling structure & solenoids  Assembly Waveguides + final water connections  Bake-out cavity  LLRF activities + interlock tests  First RF and  RF conditioning  LLRF optimization (with cooling rack)  RF ready for beam and x

Page 7 SINSB03 and SINSB04 systems SINSB03  KKV  Modulator transport  Modulator assembly (water, oil, shield klystron, housing)  Diode tests  Assembly Waveguides + final water connections  Bake-out cavity  Ready for first RF – with Beam SINSB04  KKV  1 cavity in WLHA for pre-assembly  1 cavity at RI. Production sequence completed  MEGA power splitters with vacuum leak  Vacuum group prepares a dummy chamber pipe to substitute cavities 2x

SINDI01 (deflector) and SINXB01 (X-band) Page 8 5-cell RF deflector  KKV X-band system  KKV  Modulator transport  Modulator assembly (water, oil, shield klystron, housing)  Modulator connection to grid & tests  Diode tests  Connection water cooling structure  Assembly Waveguides + final water connections  Bake-out cavity  LLRF activities + interlock tests  Ready for first RF and RF ready for beam  Modulator transport  Modulator assembly (water, oil, shield klystron, housing)  Modulator connection to grid & tests  Diode tests  Connection water cooling structure  Assembly Waveguides + final water connections  Bake-out cavity  LLRF activities + interlock tests  Ready for first RF and RF ready for beam 20.06

Page 9 C-band Linac – Installation 1/3 ~9m  Actually 14 over 26 modules are already installed  First HV modulator (by Ampegon) will be transported from OBLA  modulator assembly (water, oil, shield klystron, housing)  modulator connection to grid & tests  PSYS tests  water connections to the 4 structures + BOC  Interlock test for diode mode  Waveguide installation  Diode mode  Interlock test for RF  Ready for conditioning

Page 10 We intend to install the last module in the SwissFEL tunnel in September At the moment the structure production meets the schedule. C-band Linac – Installation 2/3 Courtesy F. Loehl

C-band Linac – Installation 3/3 HV modulators Both modulator orders (12 Ampegon & 13 ScandiNova) are placed and the Kick-off meetings took place. Contractual delivery dates: Nov 15Dec 16Jan 17Feb 17Mar 17Apr 17 Ampegon ScandiNova11335

C-band MHI deflectors (S03CB14.1) Page 12  PSI ordered two C-band deflecting cavities and related waveguides to MHI-MS  They will be ready for commissioning in October 2016  The two deflecting cavities will be powered by the last station of Linac3 using an high power RF switch  The waveguide switch is provided by Nihon Koshua  The power test of the switch is in progress Last module in Linac3 (S03CB13) Deflecting cavities (S03CB14.1)

 RF Gun – 1 week  SINSB – 2 weeks: operation at 10 Hz, conditioning at 100 Hz, RI structures never run at 100 Hz and nominal power  SINXB01 – 2 week for 10 Hz operation  SINDI01 – 1 week for 10 Hz operation  S01CB01  functional test – 2 months  S01CB02  from Jan  S10CB03–07, S30CB01–04  Jan – May 17  S30CB14.1 (deflector)  S10CB08–09, S20CB01–04, S30CB05–13 RF conditioning Page 13

 Energy gains against timing  Energy gains against temperature of the accelerating structures  Functional tests of the S01CB01 module with beam  Tuning of the RF parameters  Dark current measurements System commissioning with beam Page 14