Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.

Slides:



Advertisements
Similar presentations
Calaveras County Water District Capital R&R Program Funding Options March 25,
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
11 Rate Design to Complement AMI Implementation in Danville, Virginia Presentation by Denise Sandlin Support Services Director Danville, VA APPA 2009 Business.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
FY Budget Presentation to Board of Finance March 31, 2014 SWPCA William P. Brink, Executive Director Rhudean Bull, Administration Manager.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
City Manager’s Proposed Budget for Fiscal Years 2010 and 2011 City Council Budget Hearing June 08, 2009.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
Scope of Work  Review financial performance  Recommend rate adjustments  Prepare grant or loan applications.
Fairview Township, York County May 28, 2015
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
2014 Budget Department Presentations Infrastructure Funding Options.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Department of Environmental Quality Water Infrastructure November 17, 2015 Water Infrastructure Funding to Financing.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Sewer Rate Evaluation Wareham, Massachusetts January 14, 2014 Michael J. Schrader, P.E.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Rates Prop. 218 Hearing February 15, 2011.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
1. FY Proposed Budget Jamie Justice, Town Manager & Piet Swart, Finance Director April 26, 2016 Fiscal Year Proposed Budget 2.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA Finance Director Tuesday, May 3 rd, 2016.
City of Palo Alto Utility Rate Changes FY 2013 Facility Managers’ Meeting August 16, 2012 Ipek Connolly, Senior Resource Planner.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
City of East Point FY 2012 Budget Presentation. Comparison of FY11 vs. FY12 Budget Policies Proposal FY 11 TotalFY12 O&M Changes FY11 Current Budget 94,652,326.
What are they and how are they calculated? May 2015.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Financing Plan Rate Study 2010 December 14, 2010.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
CSA 7 – Boulder Creek. YOUR SANITATION FACILITY Facility Includes the Following Five Pump Stations –Total of 10 pumps 16,553 feet of collection lines.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Portugal Cove - St. Philip’s
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
FY Proposed Budget and Rates
City of Petersburg Water and Sewer Rates April 26, 2011
Joshua Basin Water District Draft Findings & Rate Scenarios
System Development Fees
Water and Sewer Rate Study
Joshua Basin Water District Revised Rate Recommendations
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
City of Fernley City Council Meeting
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Orange County Board of County Commissioners January 24, 2017
Delta Water Supply Project
SEWER DEPARTMENT BUDGET WORKSHOP
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.

CFPUA Expenditures Compared to Separate City & County Water and Sewer Systems CFPUA operates a consolidated water and sewer system at lower cost than the City and County operated separate systems.

CFPUA Expenditures Compared to Separate City & County Water and Sewer Systems Costs to operate and maintain the water and sewer system are less than City & County costs to operate separate systems despite fully covering administrative expenditures that would have been shared by multiple departments of the City and County.

CFPUA Has Invested in Infrastructure Improvements that Probably Would Have Been Needed by City and County Systems

Efficiency Benefits of Infiltration & Inflow Reduction Increased Available System Capacity without Expanding Facilities Deferred Southside Wastewater Treatment Plant Expansion Construction Deferred Pump Station Expansion Construction Deferred Force Main Upsize Construction Ability to add New Customers without adding New Sewer Collection Lines Reduced Operating Costs Less Energy Costs to Pump and Treat Less Chemical Costs to Treat Less Wear on Equipment Less Maintenance Costs

Infiltration & Inflow Gravity Sewer Rehab or Replacement Projects Completed

Cheryl Spivey

Rate Discussion & Public Hearing Rate presentation to Board and public hearing held on March 12 th. Finance Committee recommended proposed Option B, which assumes an additional 4% decline in water and sewer usage. Proposed rates would be effective for bills prepared on or after May 1, 2014

Rate Discussion & Recommendation Committee Recommendation

Rate Recommendation Recommend rates to Board for adoption on April 9, 2014 to be effective for bills prepared on or after May 1, 2014

The following slides provide additional information

Proposed Rate Options

Proposed Rate Options – 5/8” Residential Meter Bi-Monthly Cost

Proposed Rate Options – 5/8” Residential Meter Annual Cost

Proposed Rate Options – 1½” Meter Bi-Monthly Cost

Proposed Rate Options – 1½” NonResidential Meter Annual Cost

Basics of CFPUA Rate Model Rates are set at a level to cover operating expenditures, principal & interest on bonds/loans (debt service), and an additional 20% of debt service that is required to issue additional bonds Water rates cover cost to provide water Sewer rates cover cost to provide sewer

Basics of CFPUA Rate Model Fixed water charge covers debt service on water projects Fixed sewer charge covers debt service on sewer projects Fixed charge calculation = debt service ÷ equivalent customers ÷ 6 billing cycles Equivalent customer is a 5/8” meter. Larger meters equate to more than 1 customer

Basics of CFPUA Rate Model

Volumetric rate covers operating expenditures and cash funded capital costs Calculation = estimated expenditures ÷ gallons expected to be sold based on water meter readings Uniform rate for all usage Residential sewer is capped at 30,000 gallons Residential sewer customers without a water meter are charged for 24,000 gallons

Summary Customer Billing Data

Revenue Loss from Decline in Volume

Environmental Finance Center at the University of North Carolina at Chapel Hill

Expenditures 76% Fixed Cost & 24% Variable Cost $51 million Fixed - $16 million Variable Although 24% of expenditures are variable, they do not all vary based on water and sewer flow.

Electricity 2012 water consumption declined 4.2%, electricity usage increased 6.7%. Portions of renovated Sweeney Water Treatment Plant came online 2013 water consumption declined 7.3%, electricity usage only declined 1.7%

CFPUA Meters

Proposed Rate Options No Change in Fixed Charges Reductions in Capital Projects Approved for FY14 and Prior Allow for Smaller Bond Sale Increase Volumetric Charges to Cover Operating Expenditures Covering Operating Expenditures, which are primarily fixed, with Lower Volume of Sales Various Options