Brenda Dingus Jan 2005 New Laser Calibration Status  New Laser vs Old Laser  Safety  Pond Data  Outrigger Data  How to Combine?

Slides:



Advertisements
Similar presentations
Introduction to Aesthetic Laser Concepts
Advertisements

ICSO High Accuracy Laser Telemetry for Kilometric Distance Measurement in Space C.COURDE, H. PHUNG Duy, M. LINTZ, A. BRILLET ARTEMIS, Observatoire.
APS-DPP-2005-LeBlanc-1 Update on MPTS B.P. LeBlanc Princeton Plasma Physics Laboratory NSTX Results Review July 26-27, 2006 Princeton, NJ.
Chromatic Dispersion Measurement methods  Pulse Delay Method (time-of-flight) ‏ IEC / ITU-T G650.1 EIA/TIA-455- FOTP-175-B  Phase Shift Method.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
Panasonic Electric Works Corporation of America NaPiCa Light Sensor Oct 2009.
The EX5 Excimer Laser A total metal ceramic excimer laser with many advantages Low cost Mini laser Long gas lifetime Low cost of operation Computer controlled.
Visible Laser Light — Do Not Stare into Beam or View Directly with Optical Instruments Initials: __________Date: __________ CW power: ______________WType:
1 Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter 06/23/2003 Kurt Francis - Northern Illinois University.
K-Space Associates, Inc. kSA BandiT: Band-edge Thermometry.
Lecture 33 Review for Exam 4 Interference, Diffraction Reflection, Refraction.
Ch3: Lightwave Fundamentals E = E o sin( wt-kz ) E = E o sin( wt-kz ) k: propagation factor = w/v k: propagation factor = w/v wt-kz : phase wt-kz : phase.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
Lecture 38 Lasers Final Exam next week. LASER L ight A mplification by S timulated E mission of R adiation.
Digital Hadron Calorimeter Cosmic Ray Test Stand.
Monochromator Improvements and Focusing Elke Jackson Research performed by Elke Jackson, Shannon Lunt, and Yenny Martinez With the support of Drs. Steven.
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
1 Fiber Optics MULTIMODE VS. SINGLEMODE FIBER. 2 Fiber Optics When we talk about fiber we refer to either multimode or singlemode fiber. We further clarify.
HCAL Laser Upgrade Study German Martinez Florida International University Vasken Hagopian Florida State University.
Measurement of the absolute efficiency,
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
SARAN THAMPY D SARAN THAMPY D S7 CSE S7 CSE ROLL NO 17 ROLL NO 17 Optical computing.
Granular Systems in Microgravity Michael L. Wilson The University of Tulsa Supported by Research Corporation.
MIT runs syn no label No Label was not connected TTL trigger from delay box CH A to syn.
Measurements in Fluid Mechanics 058:180 (ME:5180) Time & Location: 2:30P - 3:20P MWF 3315 SC Office Hours: 4:00P – 5:00P MWF 223B-5 HL Instructor: Lichuan.
D EDICATED S PECTROPHOTOMETER F OR L OCALIZED T RANSMITTANCE A ND R EFLECTANCE M EASUREMENTS Laetitia ABEL-TIBERINI, Frédéric LEMARQUIS, Michel LEQUIME.
Peripherals The term peripherals refers to all hardware devices that are attached to your computer and are controlled by your computer system Peripherals.
TOF Monitor System Status F. Harris U. of Hawaii June 13, 2006.
1 2 nd Virgo+ review, Cascina 17/10/2007 H. Heitmann New Quadrant Diodes New Quadrant Diodes Motivations & Requirements Status & Plans: see Nikhef talk.
Brenda Dingus 2 June 2005 Using Multiplicity Scalers to Constrain Solar Spectra Low Threshold of Air Shower PMTs have 8 different multiplicity discriminators.
Outrigger Timing Calibration & Reconstruction Milagro – 11/17/03 Shoup – 1 Purpose: To incorporate outrigger hits in event angle fitting Additionally incorporated.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Analysis of Endstation A setup Josef Uher. Quartz bar Start counter.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Fig. 3 Wind measurements experimental setup Lidar (light detection and ranging) operates using the same concept of microwave RADAR, but it employs a lot.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
DECREASED FLICKER SENSITIVITY WITH A SCANNED LASER DISPLAY. J.P. Kelly 1, H.L. Pryor, E.S. Viirre, T. Furness III. 1 Children's Hospital & Medical Center;
J. Vandenbroucke N. Bramall, M.D’Agostino, A. Morey, P. Sandstrom, M.Solarz, I.Taboada Calibration of the Standard Candle: How Standard Is It? IceCube.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Mid term – Laser Swarm Optical Receiving Payload Single-Photon Detection -Photonmultiplier tube -Single Photon Avalanche Diode(SPAD) Wavelength Estimation.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
1 Progress of the Thomson Scattering Experiment on HSX K. Zhai, F.S.B. Anderson, D.T. Anderson HSX Plasma Laboratory, UW-Madison Bill Mason PSL, UW-Madison,
BREWER RECENT IMPROVEMENTS 13th Brewer User Group Meeting Beijing, China 12 – 16 September 2011 Arjan Hoogendoorn Brewer Specialist KIPP & ZONEN.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Timing Constants for Outriggers using the Milagro Laser Matthew E. Wilson November 16, 2003.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
Michael Lindgren 1 Off-Axis Workshop March 13, 2003 CDF R5900 MAPMT Experiences l Outline wCDF usage wTesting wPerformance wComments l Not sure what to.
UITF Laser and Gun High Voltage John Hansknecht UITF Operational Review March 18, 2016.
National Highway Institute 5-1 REV-2, JAN 2006 EQUIPMENT FACTORS AFFECTING INERTIAL PROFILER MEASUREMENTS BLOCK 5.
Date of download: 6/30/2016 Copyright © 2016 SPIE. All rights reserved. Trans-cis conformational change of the azo-dyes under light irradiation. (a) Equivalent.
DECam Spectrophotometric Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
Digital Light Sources First introduced in 2001.
Practical advices for using TCT (mostly for Particulars setups)
Figure 2. Experimental scheme of the optical investigation: Nd-YAG laser –1, polarizer –2, interference mirror –3, total reflection mirror –4, standard.
IMAGE ORTHICON.
Instrumentation for Colliding Beam Physics 2017
電磁波或光 但如此相干coherent的光很不容易形成! 不相干的光極易發散!
Terry Cotter LO/IF Group Leader
Drive Laser Commissioning Status
ULTRA Meeting – Torino Gennaio
Presentation transcript:

Brenda Dingus Jan 2005 New Laser Calibration Status  New Laser vs Old Laser  Safety  Pond Data  Outrigger Data  How to Combine?

Brenda Dingus Jan 2005 Awesome New Laser NEWOLD Nd YAG laserNitrogen laser Solid State (no consumables) Gas Tube (replace ~1/year) 0.2 nsec pulse2-4 nsec pulse 532 nm~470 nm 26 microJoules/pulse~100 microJoules/pulse 3 sq mm beam80 sq mm beam pulses/sec<10 pulses/sec

Brenda Dingus Jan 2005 SAFETY  Class 3b laser  Due to high intensity of laser, a single pulse specularly reflected into the eye is hazardous.  Requires LANL Integrated Work Document (IWD)  Safety Interlock on Plexiglass Cover  Hazard light on outside of shed  DO NOT ENTER LASER SHED, IF YOU HAVE NOT SIGNED IWD  If you want to sign IWD, you must  Take LANL Laser Safety for Class 3b & 4  Have LANL HSR approved eye exam  Read IWD

Brenda Dingus Jan 2005 Laser Calibration LASER Computer Controlled Optical Filter Wheel Computer Controlled Optical Fiber Switch Optical Fiber ~ 30 Fibers to Pond & ~ 30 Fibers to Outriggers Computer Controlled Delay Generator Prompt Pulse To Common Stop of Time to Digital Converter Monitor Photodiode To Front End Board & TDC

Brenda Dingus Jan 2005 Laser Light Output Stability Time (hours) Photodiode hitot (ch) Pond Calibration of 1000 Hz x 35 filter wheel positions x 30 laser balls takes ~12 hours Each ball takes ~24 minutes Photodiode hitot varies by <5 ch in 24 minutes Still need to calibrate photodiode hitot

Brenda Dingus Jan 2005 Timing Stabile of Delay Generator Timing of monitor photodiode shows no skips even for short time intervals Long term stability also < 0.5 nsec Time (hours)Photodiode histart (ch)

Brenda Dingus Jan 2005 Pond Calibration Hi or Lo Start Hi Lo Hi or Lo ToT  30 laser balls in pond  Central balls can calibrate ~30 top layer pmts to several 1000 pes and ~100 top layer pmts up to several 100 pes Typical Top Layer Slewing Curve

Brenda Dingus Jan 2005 Outrigger Calibration  Laser is bright!  Combine 30 fibers entering laser shed to 3 fibers coming out of optical switch  Each of 3 fibers requires different delay due to different cable and fiber lengths  Additional optical filter is required for most outriggers  29 outriggers need x light sent to pond ball  121 outriggers need x light sent to pond ball  19 outriggers need x light sent to pond ball  4 outriggers need 1 x light sent to pond ball

Brenda Dingus Jan 2005 How to Combine?  What is relative offset between top/bottom/outriggers?  Current monitor histogram looks problematic.