Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
DCal Meeting
MFT Progress Report Ginés Martínez García for the MFT project ALICE mini-week, Sep 1 st -5 th 2014.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
1 Ring Imaging Cherenkov Counter (RICH) Program Management Plan RICH Project Review September 5-6, 2013 Patrizia Rossi.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Hybrid Integrated Circuit
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Photo taken at Sra Patum Palace SUT is a full member of ALICE On 13 December 2012, there was a signing ceremony Memorandum of Understanding between SUT.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
ITS upgrade Meeting Gruppi INFN V. Manzari – CERN, 6 Novembre 2012.
Update on tendering for HIC automatic assembly system A. Di Mauro ITS Upgrade Plenary,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
NA57 D. Elia, INFN Bari (Italy)QM2004, Oakland - January 11-17, Energy dependence of K 0 and hyperon production at CERN SPS Domenico Elia INFN -
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
NA57 Strange particle production from 40 GeV data at the NA57 experiment Paul Norman of the University of Birmingham, United Kingdom on behalf of the CERN.
CERN-RRB ALICE Resources Review Board 15 October 2014 Updates to Financial Report CERN Finance, Procurement and Knowledge Transfer Department.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
ALICE-USA in the BTU project 1. 2 US Scope: Inner Read-out Chambers and Associated Readout Electronics.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
Resources, Schedule and Risk Management Pierre Bonnal CERN DG-DI Projects Support Office 1 st HiLumi LHC Collaboration Meeting 16 th to 18 th November.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
CERN-RRB ALICE Resources Review Board 30 April 2014 Updates to Financial Report CERN Finance, Procurement and Knowledge Transfer Department.
ALICE Upgrade Construction management system Adriana Telesca ALICE MFT Plenary meeting 9 July 2015.
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Camera PDR/CD1 Planning 19 September 2008
CLIC work program and milestones
Alessandro Lonardo Referente Locale TT Sezione di Roma 1 Piero Vicini
WBS 1.03 Readout Systems Scope, Cost and Schedule
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Hybrid Pixel R&D and Interconnect Technologies
WP9 ITS Mechanics and Cooling
HCAL M&O-B Budget CMS Finance Board
Upgrade of the ALICE ITS
LHCC Upgrade Session, 12 March 2013
ALICE Resources Review Board CERN-RRB April 2017
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Francesco Forti University and INFN, Pisa
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
Preparations for a Lehman Review
CMS Goal of the experiment
HL-LHC upgrade at IPHC news
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova

 TDR endorsed by the LHCC in December 2013  TDR review by UCG The UCG will review upgrade TDR’s shortly after their scientific merit has been evaluated by the LHCC. Collaborations need to make a persuasive case to the UCG that they have carefully evaluated and understand the cost, schedule, and manpower required, and the risks inherent in the technical approach. Upgrade projects should demonstrate that: The work scope is complete, well organized with clear assignment of responsibilities. Cost estimates are based upon standardized and disciplined processes. A well-detailed resource-loaded schedule exists and provides the basis for all cost and schedules. A well-detailed risk registry has been developed and implemented. Staffing needs are well identified and achievable. The project is poised to initiate and effectively manage the final design phase of the project as well as begin long lead procurements. Preparation of UCG Review

What is requested by the UCG 1. A “Budget explanation and justification” section explaining important requirements, tradeoffs, etc. in reaching the final design, and their impact on the cost. 2. A WBS chart down to at least level 2, showing costs, allocation responsibilities, expected funding sources, bases for estimates, etc. for the major subsystems (parts or components). 3. A WBS-like chart indicating the manpower resources (FTE) needed, e.g. physicists, computing and software professionals, engineers, technicians, CERN technical groups, etc. 4. A resource-loaded schedule that shows the duration of the major tasks, manpower required, and sources of the manpower 5. A risk register, giving the likelihood and impact of each significant risk, and your strategy and plans for mitigation 6. List of resources requested from the upgrade common fund, e.g. receiving, installation, commissioning. 7. A spending profile by year. Preparation of UCG Review

CERN France (Grenoble, Strasbourg) INFN (Alessandria, Bari, Cagliari, Catania, Frascati, Padova, Roma, Trieste, Torino) Netherlands (Nikhef, Utrecht) UK (Daresbury, Liverpool, RAL) USA (Austin, Berkeley, Chicago, West Lafayette) Russia (St. Petersburg):IB (mechanics) Slovakia (Kosice), Check Republic (Prague): Data transmission Ukraine (Kharkov):FPC fabrication (?) China (Wuhan): OB (HIC assembly), electronics Indonesia: DCS Korea (Pusan, Inha, Yonsei):Pixel chip mass-production test, HIC assembly Thailand (Suranaree) : silicon wafer survey, thinning & dicing Pakistan (Islamabad) : electronics 4 ITS Upgrade – Participating Institutes

Cost Estimate List of INFN Institutes 5 InstituteResponsibleMain Tasks and Responsibilities BariV. ManzariChip test system, OB Module, Construction of Module-0 CagliariG. UsaiChip design and characterization, OB Stave CataniaF. RiggiChip characterization, Module components qualification LNFP. Di NezzaChip characterization, OB Stave PaduaM. LunardonChip test system, Outer Layers End-wheels and Integration RomeM.A. MazzoniOB stave Turin/AlessandriaS. BeoléChip design and characterization, FPC design, OB Stave, Construction of Stave-0 TriesteG.V. MargagliottiChip characterization Module components qualification

Cost Estimate List of INFN Institutes 6 AttivitàSezioniResponsabile Chip test systemBari, Padova, CagliariG. De Robertis Chip designCagliari, TorinoG. Usai, G. Mazza Chip beam testBari, Cagliari, Catania, LNF/Roma, Padova,Torino/Alessandria, Trieste E. Spiriti FPC DesignTorinoG. Mazza Module and Stave Components Qualification Catania, Trieste, OB Module-0 and Module Production Bari + (Padova, Torino, Trieste)V. Manzari OB Stave-0 and Stave Production Cagliari, Torino/Alessandria, LNF/Roma S. Beolé, P. Di Nezza Outer Layers End-wheels and Integration Padova, Bari, TorinoM. Lunardon

Stave Layout 7

Half-stave and Stave assembly and test LNF, Turin, Cagliari (with manpower from other INFN Institutes) Production and qualification test of end-wheels for L5 and L6 L5 & L6 integration and pre-commissioning CERN, Padua (with manpower from all INFN Institutes) Qualification test and Selection of HIC components (FPC, etc.) Catania, Rome, Trieste HIC assembly and test Bari (Padua, Turin, Trieste) Module Carbon Plate CERN Spaceframe e Cold Plate CERN Qualification test and Selection of Power Bus Catania, Rome, Trieste Organization of the construction activity (Preliminary) Module assembly and test Bari (Padua, Turin, Trieste) Responsible Institute, Hosting Institute, Contributing Institute Selected qualified Pixel chip XXXXX

End wheels and Half-Layer Integration of Outer Layers (L5 &L6)