MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)

Slides:



Advertisements
Similar presentations
CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Advertisements

LHC Beam Operation WorkshopM. ZerlauthDecember 2010 Thanks to : CERN Machine Protection Panel, EICs, et al 1v0 Do we understand everything about MP system.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
 M.A - BIS Workshop – 4th of February 2015 BIS software layers at CERN Maxime Audrain BIS workshop for CERN and ESS, 3-4 of February 2015 On behalf of.
Using the Engaging Networks tools Ghazal Vaghedi Toronto February 21, 2012 #12ENCONF.
Openlab Workshop on Data Analytics 16 th of November 2012 Axel Voitier – CERN EN-ICE.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
B. Todd et al. 25 th August 2009 Observations Since v1.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Architectural issues M.Jonker. Things to do MD was a success. Basic architecture is satisfactory. This is not the end: Understanding of actual technical.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
 Software Tools for MPS Kajetan Fuchsberger MPP Workshop, 2013, Annecy Many thanks for input from M. Zerlauth, J. Wenninger, R. Schmidt, G. Kruk, V. Baggiolini,
MS Activities during TS#3 Courtesy of JC, Kajetan, Arek, Jacek, Yan, Richard and Pierre.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
1 15 April 2010: Post Mortem Analysis by M.Zerlauth MP3.1 Markus, Adriaan, Odd, Zinur and many others…
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
PM System Architecture Front-Ends, Servers, Triggering Ingredients Workshop on LHC Post Mortem Session 1 – What exists - PM System, Logging, Alarms Robin.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE and BE-CO Collaborations  MPE and BE-CO collaborations Jean-Christophe Garnier 01/12/2015 On behalf of TE-MPE.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
European Organization for Nuclear Research Industrial Controls Group Workshop on QPS Software Layer, 26/08/15
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
QPS high level controls LabView tools, an overview.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
MPE Workshop 14/12/2010 Analysis of the RB and RQF/D splice data recorded with nQPS - status and plans towards full automation Analysis of the RB and RQF/D.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
MPE LS1 workshop Summary Session 4 – Quench Detection R. Denz, D. E. Rasmussen.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
A monitoring system for the beam-based feedbacks in the LHC
Data providers Volume & Type of Analysis Kickers
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Next Generation of Post Mortem Event Storage and Analysis
Injectors BLM system: PS Ring installation at EYETS
MP3 Review Software tools
How do we tackle the extended requirements?
J. Uythoven for the MPE-MI & MS Teams
Global Post Mortem Event Event Timestamp: 15/06/12 15:54:
1v1.
LHC BLM Software audit June 2008.
LHC Systems Providing Post-Mortem Data
Review of hardware commissioning
Presentation transcript:

MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)

who we are and what is project... We are an inter departmental co-operation (BE/CO, TE/MPE and EN/ICE) of over 10 people + another ~ 5 module developers Post Mortem Files contain transient data from LHC equipment, pushed to a redundant central data storage architecture Arriving data files will trigger an Event Builder, automatically recognizing interesting powering, beam dump, XPOC,…events Online mode – for operational data analysis in CCC Playback mode – allows play-pack of previous events for additional expert analysis, debugging,…

PMA server architecture PM Data files PMA Scheduler Event Builder Data Collection PM Data Manager Libraries (references, DB Access Logging) GUI Modules Database LHC Logging PMA server PM buffers notifies triggers runs uses reads writes browses triggers Courtesy of Vito

... what is the main aim of the PM project? In case of event, provide efficient and deterministic analysis of transient data recordings: Check if all the devices and systems behaved as expected with an emphasis on machine protection systems Provide evidence for the cause of the beam dump / event Decide if it is safe to continue with the next injection Block the next injection if the analysis is not satisfactory Super Lock the circuit if the analysis result failed Give a brief summary when, where and what happened Currently 4 servers running on SAME infrastructure: PMA (beam dumps), PMP (Powering), XPOC (Beam Dumping System) and IQC (Injection Quality Check)

PMA Powering Server Status … Beam Intensities, Lifetime Beam Losses Event Sequence Beam position / orbit Modules implemented: BIS, PIC, FMCM IPOC BLM Losses BPM Orbit XPOC FGC ext for Feedback Fill Statistics … Modules implemented: BIS, PIC, FMCM IPOC BLM Losses BPM Orbit XPOC FGC ext for Feedback Fill Statistics … Behavior: Injection Interlock sending / sms notifications Page 1 entry Behavior: Injection Interlock sending / sms notifications Page 1 entry

PMP Powering Server Status Modules implemented: EE 600A & EE 13kA Heater Discharge FGC 600A Anti-Quench Modules implemented: EE 600A & EE 13kA Heater Discharge FGC 600A Anti-Quench Behavior: sending / sms notifications Locking circuit Behavior: sending / sms notifications Locking circuit

Modules implemented: Automated analysis of injection quality and beam dump firing Modules implemented: Automated analysis of injection quality and beam dump firing XPOC and IQC Server Status Behavior sending / sms notifications Fix Display Injection interlocks Behavior sending / sms notifications Fix Display Injection interlocks

Unforseen discoveries... Development of 600A EE module revealed minor issue in EE firmware (present during all HWC campaigns)! Allowed to identify 5 600A EE systems needing intervention during Xmas stop Some problems with Cap in 600A EE racks!!

Data correlation with the Post Mortem Basket PM Project is not only performing automated analysis, but allows for manual analysis by providing configurable displays to operators/experts Work ongoing to allow correlation of any PM data set (beam, powering,..) against each other, preparations ongoing to include Logging Data PM Browser & The PM Shopping Basket + Template Manager...

Outlook and future challenges Data collection infrastructure  Continuous HW upgrades needed + need to follow CO evolutions (OS, middleware libraries,..)  Worrying evolution towards CORBA eradication, which would require ~ 2 months of new developments + testing  Finalization of monitoring, diagnostics and synchronization tools  Use standard data format for FGC/QPS data to avoid intermediate conversion? (time for validation and backward compatibility) Data collection infrastructure  Continuous HW upgrades needed + need to follow CO evolutions (OS, middleware libraries,..)  Worrying evolution towards CORBA eradication, which would require ~ 2 months of new developments + testing  Finalization of monitoring, diagnostics and synchronization tools  Use standard data format for FGC/QPS data to avoid intermediate conversion? (time for validation and backward compatibility) PM analysis Servers  Extension of PMA servers towards expert system, development of additional modules ongoing (mostly outside of MPE)  Further develop Powering Servers, e.g. for nQPS buffers, automated splice analysis, PC discharges… with ultimate goal to be used for Hardware Comissioning in 2012/13 PM analysis Servers  Extension of PMA servers towards expert system, development of additional modules ongoing (mostly outside of MPE)  Further develop Powering Servers, e.g. for nQPS buffers, automated splice analysis, PC discharges… with ultimate goal to be used for Hardware Comissioning in 2012/13 PM Basket/Template/Viewers Finish integration of all data types + ‘alternative’ x-scales (ie transformation of beam related data into time domain), eventually allow inclusion of Logging Data Finalize (J-)Data-Viewer (add standard data treatment features, scaling,…) PM Basket/Template/Viewers Finish integration of all data types + ‘alternative’ x-scales (ie transformation of beam related data into time domain), eventually allow inclusion of Logging Data Finalize (J-)Data-Viewer (add standard data treatment features, scaling,…)

Thanks a lot for your attention!