Go Solar Florida Status Update 1-29-15 1. Overview For Today The Go SOLAR Florida Status Grant Progress - Context The Way Forward.

Slides:



Advertisements
Similar presentations
EESE O&E Committee Update & Next Steps May 14, 2010.
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Florida Product Approval System Validator Training December 11, 2012 Florida Product Approval System Validator Training December 11, 2012 Florida Building.
August 2006 OSEP Project Director's Conference 1 Preparing Teachers to Teach All Children: The Impact of the Work of the Center for Improving Teacher Quality.
August 15, 2012 Fontana Unified School District Superintendent, Cali Olsen-Binks Associate Superintendent, Oscar Dueñas Director, Human Resources, Mark.
DOE OFFICE OF INDIAN ENERGY Step 4: Project Implementation 1.
EPermits IT Subcommittee Meeting September 6, 2013.
 Reading School Committee January 23,
Broward County Cities Kickoff Meeting Thursday, December 19, :00 – 11:00 am BC GCW.
Solar Implementation in SE Florida: Go Solar Florida Dec 10, 2013 RCAP Implementation Workshop “Catalyzing Solar Development and Implementation in Southeast.
Family Resource Center Association January 2015 Quarterly Meeting.
November 22, 2011 Historical Commission Mission : To promote, preserve and protect Alachua County’s historic resources.
Neighborhood Preservation and Revitalization Division Board of County Commissioners March 10, Neighborhood Improvement Plan.
Non-Class Events in Classroom Project 1 Classroom Scheduling & Utilization Project: Capturing Non-Class Events in Held in Classrooms March 25, 2009.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
A Research Institute of the University of Central Florida FSEC Photovoltaic System Certification Process Stephen Barkaszi, PE Eric Schneller.
Oracle Finance Overview for IT Advisory Group September 2004.
Catherine Elvert City of Palo Alto Utilities Communications Manager.
2012 Program Design Discussion Charlie Garrison, David Hill and Ron Reisman Renewable Energy Market Manager Team Renewable Energy Committee Meeting September.
Brian Ross, Principal, CR Planning, Inc. Local Best Practices for Solar: Planning, Zoning, Permitting 1 Solar Minnesota November 26, 2012.
Public Information Meeting Tools for Intensification within the Yonge/Davis Urban Centres Marion Plaunt MES, MCIP, RPP Planning and Building Services August.
Iowa’s Teacher Quality Program. Intent of the General Assembly To create a student achievement and teacher quality program that acknowledges that outstanding.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
Go SOLAR Broward Rooftop Solar Challenge. What is Go SOLAR Broward Rooftop Solar Challenge? U.S. Department of Energy Grant Broward County and 14 partner.
Go Solar Florida Update March 25, 2015 Gold Coast Association of Code Enforcement Board.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Clean, Green, and on the Same Team! How Economic and Workforce Development are Partnering to Serve an Emerging Regional Industry.
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
Florida Turnaround Leaders Program Florida Turnaround Leaders Program Preparing Leaders for Florida’s Most Challenging Schools Florida Department of Education.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
Rooftop Solar Challenge II Planning Meeting What was accomplished in Phase I? What are the plans for Phase II? How can your municipality get involved?
February 9, 2010 Prescriptive Whole House Retrofit Program Webinar.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Community Planning and Permitting for Solar Energy Efficiencies.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Go SOLAR Broward Rooftop Solar Challenge Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Identification of Key Stakeholders Standardized Permitting.
Go Solar Florida Spanish Delegation to Renewable Energy Forum, November 14, 2014 Matthew R Anderson, Outreach/Marketing Chair- Go Solar Florida 1.
Go SOLAR Broward Rooftop Solar Challenge. Go SOLAR Broward Rooftop Solar Challenge Challenge Overview Proposed Permitting Solution Solar Contractors Feedback.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
Agenda Welcome Go SOLAR Grant Mid-Year Status Update On-going Challenges – In-kind Exchange Agreement for Structural Designs Potential solutions from.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
Mark Gordy, PMP Energy Enterprise Solutions, LLC 2013 Property Management Workshop May 22, 2013.
 Section (2), Florida Statutes, requires each local government to maintain a comprehensive plan of the type and in the manner set out in this.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
 Section (2), Florida Statutes, requires each local government to maintain a comprehensive plan of the type and in the manner set out in this.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Capital Improvements Program (CIP) Council Workshop January 29, 2008 Council Chambers 6:00 p.m.
Irrigation with AMR Proposition 84 Drought Round Grant Irrigation with Automated Meter Reading Project Grant Agreement with Association of Bay Area Governments.
Solar Energy Technologies Program Solar America Communities: Transforming the U.S. Solar Energy Market through Local Action April 4, 2011 Patty Kappaz.
MULTIFAMILY PERFORMANCE PROGRAM
Sample Fit-Gap Kick-off
The Administration of Subrecipient Agreements
TechStambha PMP Certification Training
Boating Safety Dashboard - How your state can participate
What is Go SOLAR Broward Rooftop Solar Challenge?
Continuity Guidance Circular Webinar
Solar Implementation in SE Florida: Go Solar Florida
Photovoltaic Systems Engineering Session 12
Planning Department FY 2019 Recommended Budget
Go Solar Florida Status Update
Rooftop Solar Challenge II: Go SOLAR Florida
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

Go Solar Florida Status Update

Overview For Today The Go SOLAR Florida Status Grant Progress - Context The Way Forward

Go SOLAR Florida Status Where we were (Sept when we were awarded the grant) Why we pivoted Where we are now (Jan. 29, 2015) Where we go from here

Go SOLAR Florida Status (cont.) Why we pivoted Not scalable Limited # of plans lead to too few choices No one had used it Does not allow for flexibility Technology changes too fast Electrical code is changing One size does not fit all

Go SOLAR Florida Status (cont.) Where we started (Sept when we were awarded the grant) Why we pivoted Where we are now (Jan. 29, 2015) Where we go from here

The Context Go Solar Florida 1.The Florida Solar Permitting System a.Plans Creation b.Permitting c.Future Expectations 2.Planning and Zoning Best Practices 3.Outreach and Education 4.Solar Financing Action Plan (active statewide effort)

GoSolarflorida.org The Florida Solar Permitting System Plans Creation

System Design and Plans Generation Electronic PV Design Manual (e-PVDM) Prepare a complete set of plans ready for permitting with minimal user inputs Develop a simple, easy to use interface Standardize the plans set for review, installation, inspection, and maintenance Built-in flexibility to remains current and not subject to limitations of pre-engineered plans

Resources National Electrical Code (NEC 2011) ASCE 7 – 10 Florida Building Code – Partners, Orange, Alachua, Miami-Dade, Broward Solar ABCS Expedited Permitting Solar ABCS Solar Reference Map FIU – International Hurricane Research Center Current and Previous SunShot Projects – Solar Nexus, Centecorp, TIAX, etc

Plans Approval Building officials issue permits based on documents endorsed by an approval authority Approval paths include – A licensed Engineer or Architect – An approved test lab or product evaluation entity – Adoption by the Florida Building Code – A Master Design Manual: F.S (9)(b)

Plans Approval Options Engineer or Architect sealed plans – Currently the most common path for applicants Product approval – High up-front cost, limited in scope, and ‘static’ Building Code reference – Can be a lengthy process Master Design Manual – Most viable option for and expedited process

Florida Statutes Master Design Manual defined by FL Statutes A restrictive design manual intended to be used for design, permitting, and construction Must be prepared by a licensed professional Must be peer reviewed Requires training for the users Florida Solar Energy Center Charged with Developing Standards for Solar Equipment

Program Sustainability Florida Statute charges the Center to develop standards for solar energy systems The e-PVDM can be developed as a recognized standard for Florida The standard and the e-PVDM can be maintained and updated with relative ease The standard can serve as a model for jurisdictions in other states

The Florida Solar Permitting System Permitting

Orange County FastTrack Online Application

LDMS System Property Validation

LDMS System People Validation

LDMS System Permit Issuance

LDMS System Permit Inspection and Completion

The Florida Solar Permitting System Permitting

Boris Sursky LEED AP BD+C Roofing Plans Processor Department of Regulatory & Economic Resources Miami-Dade County miamidade.gov miamidade.gov

Florida Building Codes FBC - FBC Building FBC Existing Building Code FBC Residential High Velocity Hurricane Zone HVHZ HVHZ Test Protocols - FBC Electrical - National Electrical Code NEC 2011 Article 690 Building Codes & Standards considered by Authority's Having Jurisdiction when permitting PV

Building Codes & Standards considered by Authority's Having Jurisdiction when permitting PV International Fire Code IFC ASCE 7-10 Minimum Design Loads for Buildings & Other Structures - Chapter 26 Wind Loads General Requirements - Chapter 31 Wind Loads Components & Cladding Florida Solar Energy Center FSEC PV system certification - Mandated by Florida Legislature Underwriters Laboratory UL - Electrical component certification - Module ratings

Welcome to the RER Website

The Florida Solar Permitting System Future Expectations

Context: Beyond Permitting The Florida Solar Permitting System includes a suite of web-based market incentive tools including:  Planning and Zoning Best Practices  Outreach/Marketing  Solar Financing Options

Planning and Zoning s/Pages/PlanningZoning.aspx

Planning and Zoning Best Management Practices  Review literature and previous research studies.  Assess how well existing zoning ordinances accommodate and encourage solar technology into existing construction and building plans.  Raise public awareness of solar technologies and rooftop photovoltaic systems.

Planning and Zoning Best Management Practices (cont’d)  Develop methods to promote solar rights.  Identify ways to re-assess how well existing zoning ordinances accommodate and encourage improvements to future developments in solar technology.

Planning and Zoning Model Zoning Ordinance (cont’d)  Define rooftop photovoltaic (PV) solar system as permitted accessory use in all zoning categories;  Define height of rooftop PV solar system separately from other height requirements;  Address design standards (including historic designation and special zoning districts); and,  Address removal/relocation of trees.

Planning and Zoning Model Zoning Ordinance (cont’d)  Acknowledge that issuance of a permit does not eliminate additional regulations or requirements related to a homeowner or condominium association or other restrictive covenants;  Acknowledge that issuance of a permit does not create a right to remain free of shadows and/or obstructions caused by development on adjoining property or growth of trees; and,  Require proper maintenance of the PV system.

Planning and Zoning Model Zoning Ordinance Deadline for adoption of solar-friendly zoning ordinance and amendments -- March 31, 2015  Broward County – June 26, 2012  Alachua County – September 23, 2014  Orange County – expected end of March  Miami-Dade reviewed the model zoning ordinance and concluded that the Miami-Dade zoning code does not need to be amended

Outreach and Marketing Marketing Website

Financing Options Financing Options Tab

Grant Progress Measured Against the SOPO Report Card Task 1 Develop governance structure Status Minutes of the kick-off meeting Go SOLAR-Florida Charter documenting key players, and other administrative elements of the governance structure Executed inter-county interlocal agreements 4 of 6 complete, St. Lucie County and the City of Venice withdrew Executed partner agreements with FSEC and FAU 1 of 2 complete, FAU withdrew

Grant Progress Measured Against the SOPO Report Card Task 2 Integrate new BC cities into Go Solar Broward Status Executed county-city interlocal agreements 5 of 9 complete Updated video of training webinar posted to gosolar gosolar Deferred New partner cities will be operational on Deferred

Grant Progress Measured Against the SOPO Report Card Task 3 Refine & replicate Go Solar Broward with Partners Status Weblink to the implemented FSEC online electronic plans storehouse Weblink exists to demo (due ) Design plans for, or weblinks to each partner county’s ePermit solution Weblinks for each partner exist, but are not linked to gosolarflorida.org because it is not live Completion of FSEC training in the use of their online electronic storehouse, documented by a video of a live webinar training posted online Will be scheduled upon completion of permit system

Grant Progress Measured Against the SOPO Report Card Task 4 Revise Planning & Zoning BMPs Status An inter-county Planning and Zoning Best Management Practices and model zoning ordinance Formal adoption of the zoning ordinance language by all permitting jurisdictions Targeted to be complete by

Grant Progress Measured Against the SOPO Report Card Task 5 Enhance Financing Options Status Weblink to the Florida Solar Financing Action Plan posted online Weblink to recommended proclamation language supporting Action Plan posted online Web link to all executed proclamations from all partner counties in support of Action Plan posted online Targeted to be complete by

Grant Progress Measured Against the SOPO Report Card Task 6 Outreach Campaign Status Go SOLAR Florida Marketing Plan Conduct at least four workshops on solar rights Conduct one workshop between partner county power companies to promote collaboration on consistent, statewide net metering and interconnection standards Complete the Second Annual Go SOLAR & Renewable Energy Fest

Bridging the Gap Incomplete TasksHow they will be addressed Task 2 Integrate new BC cities into Go Solar Broward 2.1 Executed county-city interlocal agreements Once the new Go SOLAR Florida permitting system is live, we will go back to the cities. The new system will be easier and they will see the value and want to be part of it. 2.2 Updated video of training webinar posted to This will be accomplished in Task 3.3 below. 2.3 New partner cities will be operational on New partner cities will be operational on Task 3 Refine & replicate Go Solar Broward with Partners 3.1 Weblink to the implemented FSEC online electronic plans storehouse Projected to go live Qtr Design plans for or weblinks to each partner county’s ePermit solution Will be completed as project goes live 3.3 Completion of FSEC training in the use of their online electronic plans storehouse, documented by a video of a live webinar training posted online and instructions for the use of the storehouse New proposed deadline: Qtr 3, 2015

Overall Report Cards As of Today Task #Status Overall79% Projected as of Task #Status Overall86%

Go SOLAR Florida Industry Advisory Council Recognized need for industry input as we develop plans system Formed with industry leaders from around the state Already met twice Enthusiastic response to assist us to create plans system that meets their needs

The Way Forward (cont.) Go DOE gives us the Go to move forward for Budget Period Two Complete the permitting/plans system Go live Develop a Functional Financial tool

The Way Forward (cont.) Fine-tune the plans system More plans entered into system More permits issued utilizing our system Contractors are impressed Building officials embrace consistent format of plans We entice lost sheep back in the fold

The Way Forward (cont.) Continue to work with partners to make permitting more standardized over the various jurisdictions. Work with Partners/Plans Team and the State to get an approved Master File System in place for the plans system. Work with partners to facilitate handoff of Go Solar Florida Website to FSEC.

Budget Period Two SOPO Task 7: Standardize solar permitting within each county – Subtask 7.1: Train partners and contractors to use system – Subtask 7.2: Monitor & evaluate, refine – Deliverable: Web links to all ePermit solutions implemented within all partner counties. (Q9)

Budget Period Two SOPO Task 8: Marketing & Outreach 1.Conduct at least two workshops on solar rights – Q10 2.Seek audience with the Florida Public Service Commission to presents results of Go-SOLAR Florida – Q10 3.Conduct one state-wide financial options workshop – Q10 4.Post all marketing and outreach materials online – Q10 5.Report on success of Go SOLAR-Florida Marketing Plan, including the estimated total number of customer touch points – Q10 6.The 3rd Annual Go SOLAR Fest will be conducted within a partner location, to include a qualitative/quantitative analysis of how Go SOLAR-Florida has impacted the solar market in participating jurisdications, and plans for the future. Impact metrics similar to Task 6– Q10

Budget Period Two SOPO Task 9 Project Management and Reporting – Market Maturity Indicators will be collected – Reports and deliverables will be provided to DOE with the Federal Assistance Reporting Checklist. (Q days)

Key Takeaways Team has made solid progress on grant commitments Go Solar Florida team is strongly committed to this project SunShot grant a unique catalyst for solar in Florida