Transferring Datums.

Slides:



Advertisements
Similar presentations
Unit 12 Construction Surveying
Advertisements

Basic Setting Out.
Solids in contact..
DATUMS AND BENCH MARKS Gun Metal Bolt Polished Flint Iron Covers Cover Stone Granite Pillar Gun Metal Bolt Name plate Concrete Firm Rock SECTION FUNDAMENTAL.
Maintaining Gage Datum: Levels at Gaging Stations.
Leveling terms Copy notes following into your workbooks M.S.Martin Sept M.S.Martin Sept
Unit 1003 Building methods and construction technology © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 1 Know about foundations,
Topographic Maps.
LEVELING (a most elevating passtime). The problem: I’m here standing on ground that’s metres above mean sea level I need to know the elevation.
Material Taken From: Mathematics for the international student Mathematical Studies SL Mal Coad, Glen Whiffen, John Owen, Robert Haese, Sandra Haese and.
Sheep fencing problems Calculus wall sheep fencing A farmer has a field in which there is a very long straight wall. The farmer also has 340 metres of.
How High Is That Building?. Can anyone think of an object on the school campus that we could not use a tape measure to directly measure?
Set out masonry structures
Principles of Surveying
Profile and Differential Leveling
Differential Leveling
Mean, median and mode from a frequency table.
Aberdeen Grammar School
Hexagons & Hexagonal Prisms. Hexagons Hexagons are 6 sided shapes. Hexagons can be dimensioned in 2 different ways. 1. Across the faces. 2. Across the.
Hexagonal Pyramid cut at an angle #1
Lesson Applying Profiling Leveling Techniques. Interest Approach Discuss with the students why producers sometimes put drainage ditches in their fields.
Drawing Abilities Teacher
The Key Remember, that the symbols are relevant only to the map you are using! Symbols change across different manufacturers maps, and may even change.
What is “Leveling” Levelling is the process by which differences in height between two or more points can be determined. Its purpose may be to provide.
High School by SSL Technologies Physics Ex-47 Click THE LAW OF REFLECTION When light strikes a surface and is reflected, it changes direction. The direction.
Chapter (5) Leveling Introduction:
Levelling Applications:
Unit 1 Measured Perspective Revision. Always ensure that you have positioned the plan correctly and to the correct scale.You must also draw in the correct.
17/02/03Designed by Barry Forbes Graphic Communication Hexagons & Hexagonal Prisms.
S.T.B.S College of Diploma Engineering, SURAT
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
Geology and Surveying (Part B - Surveying) Distance Measurement.
Copyright © 2009 Pearson Addison-Wesley Acute Angles and Right Triangle.
Setting up correctly Different types and their use
Chapter 4- Bench Checks1 Chapter 4 Bench Checks. Chapter 4- Bench Checks2 Before construction begins the BMs need to be checked. Why? From Design Phase.
Straightness measurement
Lesson Applying Differential Leveling Techniques.
Hexagons & Hexagonal Prisms.
This presentation, together with the next few presentations, outline the procedures for measuring and calculating vertical distances. Accurately It is.
Carpentry & Joinery Diploma Level 1 Flash Cards.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Hexagonal Prisms Developments.  A development is a flat template of a 3D shape that when folded up in the correct way makes the actual shape of the 3D.
CIVIL DEPRTMENT  Introduction :  The process of laying out engineering projects by placing pegs Or marks at the site of works is known as setting out.
2 Acute Angles and Right Triangles.
Copyright © 2017, 2013, 2009 Pearson Education, Inc.
Hexagonal Pyramid cut at an angle #1
Drawing Abilities Teacher
Chapter (5) Leveling Introduction:
Hexagonal Pyramid cut at an angle #2
Levelling – Height Measurement
Name: Ansari Kaushar Ali
Unit: Surveying Lesson: Differential Leveling
Levelling Horizontal Line Pull of Gravity Reduced Level Height
2.7 and 3.7 “I can use benchmark angles to estimate the measure of angles, and use a tool to measure and draw angles.” “I can understand that the measure.
Levelling Horizontal Line Pull of Gravity Reduced Level Height
Further Mathematics Support Programme
Leveling.
Leveling.
Leveling.
Leveling.
2 Equations, Inequalities, and Applications.
Leveling.
Leveling.
12.4 Volume of Prisms and Cylinders
Differential Leveling
Leveling.
Surveying With Construction Applications, 7th Edition
True Shapes.
Engineering Surveying Levelling
Lecture 7.
Presentation transcript:

Transferring Datums

Temporary Bench Mark (TBM) (TBM) from which levels are taken A Temporary Bench Mark (TBM) is a known height point from which all levels are taken. The TBM can be related to an Ordnance Survey Bench Mark. The TBM can be surrounded by concrete and a timber enclosure for protection.

Ordnance Survey Bench Mark Level taken from here Ordnance Survey Bench Mark – datum which marks the height above mean sea level at Newlyn in Cornwall. These datum's are established by the Government Survey Office and are usually permanently marked on public building, bridges etc.

Example of Ordnance Survey Bench Mark

A Datum peg is a level point that is established in relation to a Temporary Bench Mark. The datum is a level reference point for the building activities, a few are shown below. Datum peg at DPC level DPC Oversite concrete level Foundation concrete level Invert level

Using Straight Edge and Level Transferring Datums Using Straight Edge and Level

A B X Drive a peg (X) in the lengths of the straight Mark the position of the level on the straight edge to ensure it remains in the same position. B Drive a peg (X) in the lengths of the straight away from the datum and level. X

B X A Y To maintain accuracy the spirit level and straight edge should be reversed at each intermediate leveling point as seen point B on the straight edge remains on peg X and A swings round to peg Y.

A B A

Any inaccuracies in the level and straight edge are corrected by reversal of the level and straight edge as illustrated below. TBM Peg 1 Peg 2 Peg 3 Peg 4 Datum Level