ISO STEP AP242 “Managed Model Based 3D Engineering” Roadmap for T-Systems STEP applications Paris, the 26 th of March 2014.

Slides:



Advertisements
Similar presentations
PLM Implementation in L&T Heavy Engineering Ninth ARC India Forum, Pune August, 2011 Achieving Operational Excellence Through IT and Automation Solutions.
Advertisements

Autodesk Integrations Overview SmartDesk A seamlessly integrated, affordable, out-of-the-box, Windows based drawing and document management tool for.
Microsoft SharePoint 2010 technology for Developers
Kentico CMS 5.5 R2 What’s New. Highlights Intranet Solution Document management package – WebDAV support – Project & task management – Document libraries.
ENOVIA SmarTeam V5R17 Portfolio. ENOVIA SmarTeam 2 ENOVIA SmarTeam Offering © Dassault Systèmes, All Rights Reserved. Community: Strict access to.
Accelerate Business Success With CRM CRM Interoperability.
T-Systems PLM Products
SOA, EDA, ECM and more Discover a pragmatic architecture for an intelligent enterprise, to maximize impact on the business Patrice Bertrand Software Architect.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Translator Overview Joe Lackner Siemens Product Management.
Product Update & Road Map Jo Fuller Product Specialist.
Computer Aided Design, Manufacturing & Measurement Integration August Coordinate Measurement System Committee Albuquerque, New Mexico Richey-McIvor-Sandwith.
INTEGRATION OF MOBILE COMMUNICATION IN ENGINEERING APPLICATIONS Kamlesh Koladiya Supervisor: Dr. Eike Schallehn 1.
Application of PDM Technologies for Enterprise Integration 1 SS 14/15 By - Vathsala Arabaghatta Shivarudrappa.
BostonLogix, Inc. Product Information (A single source of the truth) IFT 2009.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
GMD German National Research Center for Information Technology Innovation through Research Jörg M. Haake Applying Collaborative Open Hypermedia.
“This presentation is for informational purposes only and may not be incorporated into a contract or agreement.”
By A + B Solutions and LC Consulting Services ®. How to Integrate Production in to T EAMCENTER by LC Consulting Services 8 Denison Parkway East Corning,
Innovate. Create. ACTUATE.. Design Engineering Computer Aided Design Interoperable Data Exchange.
Office Live Workspace Visio 2007 Outlook 2007 Groove 2007 Access 2007 Excel 2007 Word 2007.
Data Evaluation. Overview A&D now offers a professional data evaluation package to complement our testing tools –We have partnered to supply the commercial.
…. PrePlanPrepareMigratePost Pre- Deployment PlanPrepareMigrate Post- Deployment First Mailbox.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
Product data management
DEVELOPING A MESSAGING SOLUTION WITH MICROSOFT BIZTALK 2013 Ed Jones MCT, MCPD, MCTS.
Federated Product Data Exchange Mark Reisig Federation Inc.
Reuse of Legacy Data for Vehicle Support within the US Army Dr. Raj Iyer US Army Tank Automotive Research Development & Engineering Center (TARDEC) Warren,
Figure 9.1 Different management tools and PDM systems. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management.
Copyright Theorem Solutions Ltd 2001 Tony Ranger Technical Director Theorem Solutions Ltd. The PDM
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
S1 Global Plug Compatibility CAD Tools & Collaboration April 23, 2008 Don Mitchell, FNAL.
Be A Hero – ELIMINATE “END GAME” RoundUp 2007, Austin TX November 6 th, 2007.
Module 1: Overview of Microsoft Office SharePoint Server 2007.
Agile Enterprise Visualization Overview David Edwards, Product Marketing Manager.
LW TeamCenter Offline Packaging. LW TeamCenter Offline Packaging -features Linkware enable to create packages that can be download for offline work. Download.
Make Your Mark.. Paul Cannon Technical Specialist, Office Enterprise Groove and OneNote: Extending Collaboration with Office Enterprise OFC227.
PTC Creo Unite Technology
1 Enterprise Open Source Kit SharePoint PLM download available on Microsoft CodePlex
Application of the ISO for BIM Xenia Fiorentini, Engisis.
© CGI Group Inc. PrimePortal & #define Annika Maltesson, Project Krister Sundkvist,
Can you do this in SmarTeam?
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Adam Seligman Strategy Advisor Microsoft Corporation
© Copyright 2015 eQ Technologic, Inc. All rights reserved. eQube ® - Leveraging investment in Teamcenter Dinesh Khaladkar President & CEO PLM World 2015.
© Akaza Research, LLC : 1 :: 10 Professional open source for clinical research.
Presentation of Standard Interoperability PLM (SIP)
Autodesk Inventor and STEP Solutions
Presented by Martine Deprez Head of Unit, EC - SG/A1 – Development and Advice Carine Smets Team Leader e-TrustEx Business – EC - SG/A1 – Development.
AFNeT Standardization Day Paris
22 July, 2010 Fritz Feltus Presales – EMEA Distribution
Yogesh Khanzode Senior Manager, GTEC-GIS GPO Whirlpool Corporation
Theorem CADverter for STEP AP242
Jotne EPM Technology Please note the following:
ISO STEP AP242 Benchmark #1 results & Benchmark #2 planning
Product Liability and MBD
Teamcenter for CAD data management
PLM(Product Lifecycle Management) in
ECS Engineering Consulting & Solutions GmbH
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
STEP and Scriptable CAx Tool Integration
Underground Injection Control
IPMA Portal Presentation
SESSION 5: Cadence / EMA / Moog Workshop: Derived Outputs, Legacy ECAD Tool Conversion, and Constraint Manager for OrCAD Thu, Oct 18, :00 AM -
Increase productivity
Enterprise Productivity – HCL Proposition
Welcome to the ENOVIA User Community
MBSE for PLM: Part of the Digital Systems Life Cycle
Mark Quirk Head of Technology Developer & Platform Group
1888PressRelease - CoreTechnologie’s 3D_Analyzer® Viewer is now available through a mobile license-lending feature. Mobile Analysis: 3D and 2D CAD Viewer "to go"
Presentation transcript:

ISO STEP AP242 “Managed Model Based 3D Engineering” Roadmap for T-Systems STEP applications Paris, the 26 th of March 2014

2 AP242 Roadmap Applications T-Systems applications supporting STEP AP242 PDM WebConnectorV3.8SOA-based middleware for PDM system integration COM/PDMV1.1STEP based PDM data exchange for supplier integration COM/FOXV5.5.2CAx data conversion platform Supported AP242 Release AP242 BO Model XML (IS Review) 26 March public –

3 AP242 Roadmap Capabilities Overview 26 March public –

AP242 Roadmap Capabilities covered by PDM WebConnector and COM/PDM 426 March public – PDM data Assembly structure Configuration management Change management Using AP242 BO Model XML as data exchange format

5 AP242 Roadmap Capabilities covered by COM/FOX 26 March public – Focus on CAD mechanical data + assembly structure + visualization Using AP242 BO Model XML as data exchange format for assembly structure + kinematics Using JT for geometry and PMI Using PLM XML for motion data from/to CATIA V5

6 AP242 Roadmap Availability 26 March public – ProductVersionAP242 BO Model Rel. CapabilitiesAvailabili ty COM/FOXV5.5.2 IS ReviewAssembly structure Nested Assembly Kinematics (Prototype) March 7, 2014 V5.5.x ISAssembly structure Nested Assembly Kinematics (Product) Summer 2014 COM/PDM for: Aras Innovator Teamcenter UA Windchill Enovia V1.1 V9.4, V10 V9.x, V10.1x V8.x, V9.x, V10.x VPM V4, V6 ISGeneral Mgnt Info. Assembly structure Document Mgnt. Configuration Mgnt. Fall 2014 PDM WebConnector V3.8 ISGeneral Mgnt Info. Assembly structure Document Mgnt. Change Mgnt. Configuration Mgnt. End of 2014

7 AP242 Roadmap Covered Use Cases 1/2 26 March public – PDM WebConnector Legacy System s Mainfram e Delmia CATIA V5 Customer Business Process Connectivity Modules Multi-disciplinary Integration Process automation and monitoring PLM System Synchronization including Multisite PLM System Migration & Co- existence Secure Online & offline Collaboration Use Cases Services Flexibility - Interoperability - Loose Coupling Web Client Rich Client Portal External Clients Exalead (Cloud View,, One Part) Enterprise Search Engines COM/PDM (COM/TC, COM/WT, COM/ARAS) Collaboratio n Tools 3D Printing CAD Conversion Management Cockpit Printing & Conversion Individual Systems AccessPerformance Operation Load Monitoring Formats & Standards STEP AP214 ARM/AIM STEP AP242 BO Model OMG PLM Services XML JT, CATIA V4, V5, V6 Office, PDF, 3D PDF Formats & Standards STEP AP214 ARM/AIM STEP AP242 BO Model OMG PLM Services XML JT, CATIA V4, V5, V6 Office, PDF, 3D PDF

8 AP242 Roadmap Covered Use Cases 2/2 COM/PDM Asynchronous STEP data exchange for Supplier integration from/to Teamcenter UA, Windchill, Enovia VPM and Aras Innovator COM/FOX CAx data migration (system A  system B) CAx data conversion for visualization and Virtual Reality (VR) Internally between departments/applications or externally with suppliers/partners 26 March public –

THANK YOU! Your contacts: Systems.com Systems.com PDM Systems.com AP242 Steering Committee Member + PLM product Delivery Systems.com

ISO STEP AP242 “Managed Model Based 3D Engineering” Demonstration Paris, the 26 th of March 2014

11 AP242 Roadmap Capabilities covered by COM/FOX 26 March public – Focus on CAD mechanical data + assembly structure + visualization Using AP242 BO Model XML as data exchange format for assembly structure + kinematics Using JT for geometry and PMI Using PLM XML for motion data from/to CATIA V5

12 AP242 Roadmap Demonstration COM/FOX (‘Primary JT’ at Daimler) 26 March public –

AP242 Roadmap Capabilities covered by PDM WebConnector and COM/PDM 1326 March public – PDM data Assembly structure Configuration management Change management Using AP242 BO Model XML as data exchange format

14 AP242 Roadmap Demonstration COM/PDM (Sample OEM-Supplier Scenario) 26 March public –  Company Henry Mayer works together with suppliers Company FormLine and Company TrustDesign to design a new engine  Company Henry Mayer uses Teamcenter (UA)  Company FormLine has chosen Aras Innovator as its PLM system  Company TrustDesign does not have a PDM system and therefore sends the data in CATIA native format  After finishing the design, company Henry Mayer sends the engine assembly to FormLine in order for them to have the latest version.  FormLine receives the assembly package, inspects it and imports the data into Aras.  Meanwhile Henry Mayer has received a modification from TrustDesign, which TrustDesign would like to be considered in the assembly.  The designer at Henry Mayer opens this package and checks its contents incl. the geometry files to decide, if the modification should be imported or not. Imaginary Demonstration Scenario Overview