Efficient Renovation, Repair, and Minor New Construction LEAN - Job Order Contracting Best Management Practices Moderator: Peter Cholakis, CJE Board Member.

Slides:



Advertisements
Similar presentations
? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
JOB ORDER CONTRACTING Contract Management Department 8/28/121.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
1 State of Michigan Achieving Software Process Improvement with Capability Maturity Model (CMM)
Weekly Risk Report & Performance Metrics
Job Order Contracting Presented by the Center for Job Order Contracting Excellence.
90 th Annual Meeting & Exposition April 3 – 6, 2011 Memphis, Tennessee STRATEGIC VALUE OF PROCUREMENT – PART II How DO WE get there? The Sequel to: They.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Centralized vs. Decentralized: Pros, Cons & Best Practices
Contractor Assurance Discussion Forrestal Building Washington, D.C. December 14, 2011.
Shared Learning Services : Key Learnings Session 102 November 9, 2009.
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project October 2005.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
1 CorporateOverview Doing IT right – the first time.
Efficient Project Delivery Methods for Repair, Renovation, Sustainability, Construction Prepared for Pentagon/WHS-FSD| October 2014 Peter Nicholas Cholakis.
Core Performance Measures FY 2015
MDR Implementation: Drivers & Challenges Julie Smiley Director, Product Management for BioPharma Akana PhUSE SDE - May 14, 2015 Introductions.
ENSURING THE EFFICIENT IMPLEMENTATION OF THE PUBLIC PROCUREMENT LAW Effects of the Law’s implementation and the role of the Public Procurement Office in.
February 2006 The Importance of Subcontract Management to Program Success.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
JOB ORDER CONTRACTING CONSTRUCTION SERVICES FOR FACILITIES MAINTENANCE AND OPERATIONS April 26, 2014 Presentation for Presented by Troy Alexander Project.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Chapter 13 Research and Metrics McGraw-Hill/Irwin Purchasing and Supply Management, 13/e © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved.
Technical Manager; Bechtel Oil, Gas & Chemicals.
TOPIC-9- PROJECT ORGANIZATION
Fundamentals of PPPs VASCUPP September 25, 2013 Rick Norment, NCPPP.
More Construction for the Money “Back to the Future” Jim Porter 2004 Recipient Carroll H. Dunn Award of Excellence.
Job Order Contracting Process Bob Bourg, Claims & Disputes Manager Marlene Anglemyer, Cost Engineer.
Kevin Jacoby Chief Financial Officer City of Cape Town South Africa
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
DGS Recommendations to the Governor’s Task Force on Contracting & Procurement Review Report Overview August 12, 2002.
Chapter 11: Project Procurement Management
TOPIC-9- PROJECT ORGANIZATION
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
Hollings Manufacturing Extension Partnership MEP Overview 2015.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Culture, Social Media Technology, & BIM Dave Trebas, Chief Technology Officer 4Clicks Solutions, LLC Peter Cholakis, CMO 4Clicks Solutions,
Efficient Renovation, Repair, & Minor New Construction Job Order Contracting Best Management Practices.
Job Order Contracting 2016 & Beyond! Best Management Practices Moderator: Peter Cholakis, CJE Board Member Presenters: Charlie Bowers, LEED AP - National.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
PIPS!!! Performance Information Procurement System.
1 Detailed EM&V Approach for each of BGE’s Proposed Conservation Programs January 10, 2008.
TD Government Solutions
JOB ORDER CONTRACTING FUNDAMENTALS
TD Government Solutions
2016 SAME Small Business Conference - Atlanta
Subtitle Statement of Capabilities.
All IT Staff Meeting September 18, 2013
State of Michigan Achieving Software Process Improvement with
Job Order Contracting (JOC)
Enron Energy Services Energy Management Outsourcing Overview
Cost Containment Working Group Board Update
Job Order Contracting:
Metrics That Work for You
Job Order Contracting:
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Job Order Contracting:
Aim of this lecture The determinants of demand and supply on construction industry Various market structures Construction market structure The relationship.
Presentation transcript:

Efficient Renovation, Repair, and Minor New Construction LEAN - Job Order Contracting Best Management Practices Moderator: Peter Cholakis, CJE Board Member Presenters: Charlie Bowers, LEED AP – CJE Board Member, Center for Job Order Contracting Excellence Jacob Kashiwagi, PhD, - Program Manager/Lecturer, Performance Based Studies Research Group, School of Sustainable Engineering and the Built Environment, Ira A. Fulton Schools of Engineering, Arizona State University

Outline Definition of JOC (Termed SABER / Air Force) JOC Best Management Practice Areas Defining Characteristics of a JOC Program Experience, Capability, and Technology Requirements Roles – Owners, Contractors, Subcontractors, Oversight Groups, COOPs, Service Providers Performance Metrics Lessons Learned ASU 2015 National JOC Research Study 2 Center for Job Order Contracting Excellence

JOC Definition Center for Job Order Contracting Excellence Job Order Contracting, JOC: A competitively bid, fixed price, multi-year construction contract based on pre-established unit prices via a construction unit price book/catalog with a multiplier or coefficient applied to the unit prices. Most established unit price books have a local city cost index. The contract is an IDIQ or indefinite quantity contract for on-call construction services. A LEAN, collaborative, construction project delivery method using an Indefinite Delivery, Indefinite Quantity (IDIQ) contract for a specified period of time. JOC is a form of Alternative Project Delivery Method and an Integrated Project Delivery Method.

Defining Characteristics of a JOC Program 4 Collaboration Among Participants – Transparency, Mutual Respect Best Value Procurement Shared Risk/Reward Unit Price Book Long Term Relationship (3-5 years) Service Orientation More Dollars Allocated to Construction Fewer Change Orders and/or Legal Disputes Shorter Project Delivery Timelines

JOC – Best Management Practice Areas 5 Job Order Contracting involves competency in several Practice Areas: Setting Up a JOC Program Managing a JOC Program Use of a Unit Price Book (UPB), also called a Unit Price Guide (UPG) Supporting Technology Ongoing Education and Continuous Improvement Compliance with Laws and Regulations (FAR,DFARS, AFARS)

Setting Up JOC Program 6 Organizational Buy-in Goals Resources Template / Sample RFI’s, RFP’s What’s Your Market? Federal Government (FAR, DFARS, AFARS…), County, State, Local Government, Education, Healthcare, Transportation (Airports, Mass Transit, Highway)…

Managing a JOC Program 7 Internal COOP Outsourcing

Experience, Capability, & Technology Requirements 8 Collaborative, On-demand Work Ethic Line item cost estimating and estimate review Supporting technology – Key to consistent deployment, efficiency, and monitoring - Estimates, Estimate Comparisons, Unit Price Book, Reporting, Information Reuse/Updating Training – Owners and Contractors, Introductory, Advanced, Program Specific

Roles and Responsibilities Center for Job Order Contracting Excellence JOC Participants – Owners (Procurement/Contracting, Engineering/DPW, Oversight Groups), Contractors, Subcontractors, COOPs, Consultants, Outsourcing Providers. Assure quality, on-time, on-budget procurement, delivery of numerous renovation, repair, sustainability, and minor new construction projects. Compliance with JOC Contract and applicable Regulations. Monitor and report on JOC Program Key Performance Indicators

Technology Demonstration Center for Job Order Contracting Excellence

Key Performance Metrics Center for Job Order Contracting Excellence Projects Completed Projects Completed On-Time / On-Budget Change Orders Facility User Satisfaction – Responsiveness / Project Delivery Time / Quality / Dollars spent on Construction vs. Procurement Average Project Value

Lessons Learned Center for Job Order Contracting Excellence One size does NOT fit all Accuracy in volume expectations are important to all parties Expectations by all parties are a cut above other delivery methods All Owners and Contractors are NOT suited for JOC LEAN business management practices are fundamental Technology beyond spreadsheets is needed (transparency, productivity, cost effective deployment)

ASU National JOC Study – Research Overview 13 PBSRG GLOBAL Jacob Kashiwagi, PhD Dean Kashiwagi, PhD, P.E., Fulbright Scholar Research Director Performance Based Studies Research Group Pbsrg.com

Research Results of Construction Performance Biggest source of risk is the client’s decision making and procurement functions Dutch $1B infrastructure test showed client was responsible for 90% of all project cost and time deviation Minimization of client’s management, direction and control [MDC] of expert vendors will save from 5 – 50% of the client’s costs JOC is a “low hanging fruit” mechanism to increase value and decrease cost and time [23 years, 1800 tests, 7 countries]

Research Overview Follow-on study to the 1998 CJE JOC Industry Report Surveyed 58 clients and 13 contractors using JOC Reviewed current JOC literature research and state statutes Measured the economic and performance impact of Job Order Contracting (JOC). Compared the performance of JOC to other delivery methods (DBB, DB, etc.) Identified how JOC provides value to owners/buyers. Evaluated and defined best practices when utilizing JOC.

Client Participants in the Study (11) (24) (3) (2)

Major Findings 99% of owner/client participants recommend other owners to use JOC. Owners estimate a 24% administrative cost savings. Contractors estimate a 21% overall cost savings. 98% of projects were completed with satisfactory results. Users experience higher performance with JOC compared to DBB and DB In JOC, more time is spent on construction than design and procurement No state statutes were identified that place restrictions on the UPB Download Full Report at: PBSRG.com/JOCPBSRG.com/JOC

CJE – Contact Information 18