Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.

Slides:



Advertisements
Similar presentations
4th CSE ERI Stakeholders Group meeting AEEG – European regulatory affairs 15 maggio 2012 Overview of the regional work programme towards 2014.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Cross-regional roadmap for Capacity Calculation XXI Florence Forum Florence 5 December 2011.
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Electricity Regional Initiative Central South European Region Progress made and next steps for the CS Region By: Giusi Squicciarini AEEG 2nd Stakeholder.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
Name Surname Milan, November 2010 European Federation of Energy Traders 1 The Central South Region and the European Target Model – How to ensure consistency?
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
FUI Feedback on PCG Target Model and roadmap propositions FUI Stakeholder Group Meeting Paris, 4 th November 2009 These comments reflect the general views.
3rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland Electricity REM Roundup and next steps David Halldearn – Head of European Electricity Policy,
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Progress with coupling FUI and CWE region
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft document – Work in progress
Update on Ofgem’s interconnector policy consultation FUI IG, London, 13 th September.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
EURELECTRIC Views on the Regional Integration process CSE Stakeholder Group Meeting EURELECTRIC Views on the Regional Integration process Marco Foresti,
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
IG FUI, Brussels, 21 st of May European thinking on intraday target model.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
European Commission views on intra-day and balancing markets
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
Guidelines on Congestion Management ERGEG Public Hearing 30 June 2005 EuroPEX.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
All Island Single Electricity Market IWFA Update Laura Brien
2 nd Mini-Forum for Central-Southern European Region EuroPEX Discussion Points Milan, 17 th of July 2006.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Regulators’ update on Congestion Management and Balancing
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Structure of presentation
Presentation transcript:

Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG

2SG FUI, Paris, 4 th November The XV th Florence Forum invited ERGEG to establish a Project Coordination Group of experts, with the tasks of developing a practical and achievable model to harmonise interregional and then EU-wide coordinated congestion management, and of proposing a roadmap with concrete measures and a detailed timeframe, taking into account progress achieved in the ERGEG ERI.  Six workstreams were created to follow this objective. The XVI th Florence Forum in June 2009 encouraged the PCG  to finalise the generic target model before summer 2009 and  to prepare, in cooperation with ERGEG ERI, a roadmap including a concrete action plan on the regional and inter-regional implementation for the target model for different timeframes.  Each participant in ERI is kindly requested to provide its comment with regards to the draft proposition on the target model and the roadmap Background

3SG FUI, Paris, 4 th November 1. Synthesis of the target models time Products exchangeable on a secondary market Multi-annual Annual (Y+1)Y+2Y+3 Monthly Physical capacity used implicitly Flow-based or ATC-based pan- European price coupling Auctions of long-term FTRs and/or PTRs with UIOSI via a single platform capacity D-1 12h midday As soon as possible after midday on D-1 Intraday market Continuous trading through a common platform On D At H-1 Balancing mechanism Platform for exchanges between TSOs

4SG FUI, Paris, 4 th November  Main issues  The proposed amount of capacities is maximised  The proposed products can be physical or financial rights issued by TSOs  Pure financial products not directly linked to the level of capacity (like the CfDs available on Nordpool) can be proposed as a complement to physical/financial rights issued by TSOs  Firmness must be guaranteed  An effective secondary market must be implemented  Two different visions for the target models  100% FTRs (with physical execution of FTRs through market-coupling). A potential concern about OTC access  100% PTRs with UIOSI: no guarantee to have capacity for the DA (market- coupling) timeframe  Two possible interim solutions  A mix of PTRs/FTRs  PTRs with a minimum capacity reserved for the DA timeframe 2. Forward markets

5SG FUI, Paris, 4 th November Goal Price coupling all over Europe Only one algorithm Gate closure set at noon Ready by 2015 Main issues Governance: role of PXs, TSOs, OTC, decisions procedures … Better solved with top-down approach Prerequisites for implementation that need to be solved at regional level: management of different products, common regulation … 3. Day-ahead markets

6SG FUI, Paris, 4 th November Two levels Intra-regional cross-border (XB): to be decided at a regional level Inter-regional XB: continuous trading (potentially completed with auctions for significant additional intraday capacity). Ready by 2015 Main issues Ease of use: easy access, single screen, liquidity, transparent… Taking into account OTC trade Efficiency in solving the imbalance: trade up to H-1, fast, portfolio optimisation Maximisation of the social welfare: efficient use of the capacity 4. Intra-day markets

7SG FUI, Paris, 4 th November Goal Multilateral TSO-TSO mechanism with common order book No reservation of interconnection capacity No charges for using interconnectors for balancing purposes Main issues Full harmonisation of balancing markets is not necessary Importance of intra-day markets in the efficiency of the BM In case of common order book, common intra-day gate closure Each new integration step shall be assessed Costs shall not overcome the benefits (legal, technical…) 5. Balancing mechanisms

8SG FUI, Paris, 4 th November Goal: Maximum capacities should be provided at each time horizon in respect with TSOs security standards Main issues Increased level of coordination/cooperation amongst TSOs Establishment of a common grid model and sharing of best available information Coordinated reliability margin assessment Harmonisation and improvement of methodology and information about production and consumption amongst TSOs Coordinated (curative) redispatch measures Two possibilities based on the same common grid model and base cases Flow-based Allocation The market determines at the time of the allocation where to use the available capacities Coordinated Transfer Capacities Market assumptions have to be made by TSOs without knowing the markets preference when calculating capacities 6. Capacity calculation

9SG FUI, Paris, 4 th November Goal Definition of a “governance framework” for good operation and development of regional/ interregional solutions Main issues Important European “public interest goals” Multiple national jurisdictions Involvement of different parties having their own incentives The way forward Focus on the key functions The WG has started with the DA market and will continue with the other timeframes 7. Governance

10SG FUI, Paris, 4 th November Thank you for your attention!