PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug. 2015.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

LHC Injection in 07 “Summer MD-Planning” Milorad Popovic.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
H. Damerau, S. Hancock, LHC Beam Studies Review 28/08/2012 PS: the Longitudinal Plane 1 H. Damerau, S. Hancock LIU Beam Studies Review Meeting 28 August.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
MTE vs CT D.Manglunki for BE/OP - pictures from M.Giovannozzi - details in “Fifty years of the CERN Proton Synchrotron (Vol I)” CERN
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
E.M, PS-OP shut-down lectures, 20/02/ u Requirements of the LHC on its injectors u What are the nominal & already achieved beams at PS exit? u How.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Damping of Coupled-bunch Oscillations with Sub-harmonic RF Voltage? 1 H. Damerau LIU-PS Working Group Meeting 4 March 2014.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
Space charge studies at the CERN PS A. Huschauer, Raymond Wasef H. Damerau, S. Gilardoni, S.Hancock, D. Schoerling, R. Steerenberg Acknowledgements: All.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Introduction R. Garoby LIU 2014April 11,  LIU summary  LIU Highlights in 2013  Outcome of the «Review of LHC and Injectors Upgrade Plans» (Oct.2013)
High Intensity Beams in Existing Accelerators for CN2PY: SPS studies, PS issues E. Shaposhnikova Laguna-LBNO General Meeting CERN, Acknowledgments:
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
LIU-PS Beam Dynamics Working Group Introduction and objectives
BE-CO Activities for LIU-CPS and LIU-SPS
LIU Wire Scanner Milestones June 2017
Plans for ions in the injector complex D
LIU – EVM status and next steps
AD consolidation activities in LS2
EC Activities Status for the LIU
Power converters for 2GeV injection
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
Proposals for 2015 impedance-related MD requests for PSB and SPS
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Space Charge Study Group
Multiturn extraction for PS2
Impedance working group update
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Introduction to LHC beam production in PSB and PS
Beam dynamics requirements after LS2
Status of the BI Work Package in the LIU-PSB frame
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug. 2015

Space-charge study (Same as last time) Validated by simulations that observed emittance blow up and losses are due to space-charge exciting 8 th order vertical structure resonance yp (AU) Y(AU)

Possible improvements on operational beams Applying to 25 ns operational beam improvements studies for HL-LHC era -Space charge limits maximum tune shift between vertical integer 6 and structure resonance 8Qv=50 -Reducing chromaticity improves the interaction between the resonances and the neck-tie -Reducing chromaticity reduce the rise time and the headtail mode number on the injection flat bottom → use of the T-damper instead of linear coupling. -Working point during acceleration kept always below 8Qv=50 Transverse emittance reduced in both planes -Not quoting absolute values on purpose …

Magnets activities : follow-up last meeting -Magnet status - 3 quadrupoles (design exists) for low beta insertion → Call for tender in September -Only 1 magnet needed in → still on good track - Magnet for IPM horizontal plane

RF systems (main systems) Longitudinal damper: work progressing as planned - This week and next week first tests of coupled-bunch damping - Tests also in view of Finemet review 10 MHz system: - Final amplifier prototype ready for installation on spare cavity in PS ring during YETS 2015/16 - Status review in September T-damper upgrade - Schedule still compatible with commissioning needs for power amplifiers. Review on resources available for this activity on hold to give priority to Firmware development (more urgent) - New firmware for 80 bunches scheme currently under test. Confirmed decision not to implement a third 40 MHz system (pending as option) -Preliminary MD results with SPS: even with both 40 MHz cavities and nominal longitudinal emittance, the minimum losses remain almost unchanged; minor increase of 40 MHz voltage not sufficient for relevant effect on PS-SPS transfer -Two 40 MHz cavities allow to transfer larger longitudinal emittance without compromising bunch length  can be studies this year -Solution preferred to eventually run with two 40 MHz cavities (today: one used, one hot spare) with nominal/increased voltage and improved reliability; operation in degraded mode with one cavity possible  Renovation project (consolidation) for new anode power supplies  Pros: less maintenance compared to three cavities

Power converters -Boost of PV during end 2015 beg for construction of power converters for low energy converters. Confirmed payments in october-november. -Investigations ongoing on SIS to protect low-energy quadrupoles once new power converters installed during YETS Full solution with a WIC cannot be implemented now. Planned during LS2 it might be implemented during first EYETS. - Preferred solution: thermocouples installed on small number of magnets (8) to trip eventually all the 40 PC. - During tests turned out that existing protection is not effective even for existing PC. -Converging on design PC for injection bumpers - Simulation shows that ripple and tracking errors specified for power converters should not induce an emittance blow-up - New MDs to validate simulations recently repeated. Good results.

TT2 consolidation TT2 consolidation will be included in PS-LIU as agreed with EPC - restricted kick-off meeting in August. - general kick-off meeting in Sep. Date still to be fixed. Activity does not include the consolidation of the magnets - consolidation requested but not approved (yet) Renovation of FTN (nTOF) power converters should also take place - power converters in the same building (269) - if not done, impacting on final cost for TT2 consolidation Included in the budget simplified CV solution for water station - CV will see with Michael for more expensive consolidation including reallocation of man power in case final solution will be implemented

TT2 magnets: example of consolidation needs

TT2 consolidation documents TT2 specifications: TT2 infrastructure works: Agreement: Documents will not be re-approved in the LIU chain because already approved for consolidation. ECR or different document needed for replacing BHZ377 nTOF budget request will be presented to consolidation. Eventually also this activity might be moved to PS-LIU.

TT2-FTA renovation budget

BI -IPM to be installed end of this year. - BI still trying to get the system installed by the end of the YETS Agreed that the magnet installation is independent from installation of IPM - Some concerns (but already known) on production schedule -Re-iteration done recently with BI -Other instruments needed for LS2 -Still to clarify where to find the 250 kCHF missing for the normal BLMs cabling. For sure +30 kCHF for supports of fast BLMs. - BI meeting today - Trying to clarify if the budget is final or not - DICs for fast done. Trying to get the cables installed during YETS2015. Eventually the detectors can be installed later. Not clear yet when DICs for slow BLMs (possibly outcome of the next review)

BLMs proposed installation LHC IC Diamond detector - Integration agreed with Geometers and Magnet experts after integration tests on spare magnets. -Survey during next TS and eventually YETS2015 to check every magnet before going to production -Installation would be possible during a TS

Some fast BLMs signals already operational Example: Application for MTE extraction 5 turns Losses due to kicker rise time on de-bunched beam

Vacuum -Design of new injection region vacuum chamber well advanced - ECR of vacuum chambers replacement in injection region will be presented soon - Difficult to have both MU41 and MU42 replaced during next YETS due to production schedule - MU41 vacuum chamber replacement is priority for YETS2015. MU42 can be done eventually next YETS (or EYETS) - Rest of the work as support for other groups

Field homogeneity on straight lines being optimized (ABT+ABP study) 16 SMH42 ∫B y dl homogeneity BMP42 ∫B y dl homogeneity -Field quality of injector bumper improved and now better than +-2% (pictures are from old design and above 2%) -Tracking studies will be done to validate influence of multipoles generate by SMH42, BWS42 and other bumpers

Injection kicker status Progresses seems to be promising. - Two solutions analised, one reusing improved existing kicker, second green field solution using available technology - Agreed with ABT to delay first presentation on status of the works by one month. - ABT plans to have MDs to validate model predicting the emittance blow-up for a given ripple on the kicker

Budget (as 25/08)