Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/2008 1 BFW Card Status on behalf of: Keith Caban.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Venkat Srinivasan FAC: BFW Test Update 06/17/ Facility Advisory Committee BFW Calibration Test Results on behalf of: Jim.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
CLAS12 Drift Chamber Prototyping
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Tutorial On Fiducialization Of Accelerator Magnets And Undulators
Magnetic Measurements For The LCLS Undulator System
LCLS Undulator Fiducialization
Status of the PANDA Solenoid Magnet Production in BINP
Beam Finder Wire Assembly Undulator System
LARP Phase II Secondary Collimator RC-1
Cryomodule Assembly Plan
Undulator System Components Status Dean Walters
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
LCLS Undulator System Status and Schedule
BGC Collaboration Meeting –
Beam Finder Wire (BFW) Status
Undulator Alignment Plan
LCLS Undulator Magnetic Measurements
Presentation transcript:

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban Clive Field Geovanni Gordon Tom Nakashima Danny Peterswright Reggie Rogers Yung-Yung Sung

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ Task Status/Dates (from 1/23/2008) Status/Dates (4/29/08) Delivery of BFW assemblies from ANL1 st article to ship from ANL in early revised assembly received from ANL on 4/28/08. Two older design BFWs received earlier and to be sent back. Fabrication of Bench Assembly for SLAC Alignment of BFWSLAC: Ready 1/25/08Fabricated and used for alignment of BFW BFW electrical connections SLAC: To do copper tabs testing on prototype, feedthrough RF shielding Electrical Connections - RFI. Feedthrough RF shielding after BFW tests. Detector – PMT assemblySLAC: Start Feb 2008 (D. McCormick)No change (non-vacuum component) Fabrication of 40 BFW cards (Macor)SLAC: 1 st article ready for tests: 1/23/08.RFI BFW Card Coating – Kovar (40 pieces) SLAC: Start 01/28/08. Delayed due to tooling, Macor delivery, modifications. RFI BFW Card Wiring – Carbon wire, 40 piecesSLAC: Start 01/30/08RFI BFW Card Installation and alignmentSLAC: Start 02/11/08RFI BFW Assembly Pneumatics BoxesNeed pressure regulator in systemPut in system by P. Cutino for 33 BFW 90 psi airlineSLAC: Instrumentation. Start 02/04/08Put in system by P. Cutino for 33 BFW BFW Additional non-wired cards- 7 BFW cards fabricated, cleaned and coated. Waiting to be wired if needed. BFW Card: Status

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card : Old Slides

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card: Physics Overview (PRD r1) ParameterValueStatus Wires per BFW device22 Wire perpendicularity10 mrad ~1 mrad (early microscope test on prototype) Wire diameter mm0.034 Carbon wires Vertical position of Y-wire from Girder Axis (GA)0.20 mm0.186 mm [Slide 5] Horizontal position of X-wire from GA0.40 mm0.386 mm [Slide 5] Vacuum hardware clearance radius at target>2 mm>2 mm. [Slide 5] Two independent methods to measure beam intensity at wire location: (1) beam induced wire current (2) Scattered particles NA Only scattered particle detection in plan Y-wire vertical insertion reproducibility30 µm Dependent on overall BFW Assembly Alignment X-wire horizontal insertion reproducibility80 µm Dependent on overall BFW Assembly Alignment Roll, pitch, yaw tolerance10 mrad Dependent on overall BFW Assembly Alignment

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Wire Schematic ( r1) BFW Assembly Overview (J. Bailey) Assembly model courtesy: J. Bailey, ANL SLAC Deliverable: 1.BFW Card 2.Detection mechanism 3.Cabling 4.90 psi airline; 24V solenoid controller

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Prototype Drawing Prototype material: Al-6061 Actual material: Macor Thickness: 3/16” (4.8 mm) Coating: Kovar [tooling in progress] X-wire end point: mm Beam center: 40 mm Gap between beam and X-wire: mm Y-wire end point: mm Beam center: 37.2 mm Gap between beam and Y-wire: mm

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Wiring: Tooling Copper Tabs Rods for hanging BFW wire with weights Micrometer stage BFW Card Card holder ‘Carbon wire & weight’ Wires soldered to copper tabs Wires from copper tabs connect to BFW feedthrough Feedthrough to be grounded and RF shielded

Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card: Alignment Plan Assembly model courtesy: J. Bailey, ANL 1.Place BFW assembly on bench assembly using flange locating pins 2.Bench assembly locates on CMM 3.Locate wires to local fiducials (card edges and hole) – optically. 4.Locate local fiducials to outside tooling balls – using CMM. -Card’s alignment pin holes are slotted in horizontal direction. -Card’s horizontal position is verified/altered using shim/thickness gages. Adjustment Bench located on CMM Bench Fiducials Flange Locating Pins Pneumatic supply Slide Fiducials Wire Card Fiducials are edges of card and additional hole at bottom of card Vertical and Horizontal Adjustment Screws Use shim/thickness gages to measure gap between card holder and card