FSP progress update & camera concept Contents: Mechanical structure System components CCD sensor and circuit examples Hybrid concept IIC concept and tasks.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
ESODAC Study for a new ESO Detector Array Controller.
CHARGE COUPLING TRUE CDS PIXEL PROCESSING True CDS CMOS pixel noise data 2.8 e- CMOS photon transfer.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS Detector Control System Hardware Dirk Gottschalk Volker Kiworra Volker Lindenstruth Vojtech Petracek Marc Stockmeier Heinz Tilsner Chair of Computer.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
CaRIBOu Hardware Design and Status
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
08/10/2007Julie Prast, LAPP, Annecy1 The DHCAL DIF and the DIF Task Force Julie Prast, LAPP, Annecy.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Fig. 1: Cross section of a circular DEPMOS- FET pixel cell. Charges collected in the “in- ternal gate’ modulate the transistor current. DEPMOSFET team,
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
RAL, 17-May-2007Vladimir Rajović / Birmingham MAPS TEST PCB SCHEMATICS REVIEW.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
FEC electronicsRD-51 mini week, CERN, Sept Towards the scalable readout system: FEC electronics for APV25, AFTER and Timepix J.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
ILD/ECAL MEETING 2014, 東京大学, JAPAN
1 UA9 telescope first ideas Rome – 12/3/2010 Mark Raymond –
High Speed Digital Systems Lab Spring/Winter 2010 Project definition Instructor: Rolf Hilgendorf Students: Elad Mor, Ilya Zavolsky Integration of an A/D.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Marc R. StockmeierDCS-meeting, CERN DCS status ● DCS overview ● Implementation ● Examples – DCS board.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Juin 1st 2010 Christophe Beigbeder PID meeting1 PID meeting Electronics Integration.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
EDET DH80k TEM camera: System overview Johannes Treis MPI Halbleiterlabor 20 th international workshop on DEPFET Detectors Seeon monastery Non-BELLE.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
FPGA-Workshop FPGA-based Tomographycameras / Jülich Jörg Burmester, Jörn Plewka, Stephan Meyer-Loges HZG/TKE.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
Backplanes for Analog Modular Cameras EVO meeting. March 14 th,
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Calorimeter Mu2e Development electronics Front-end Review
Readout System of the CMS Pixel Detector
Hybrid Pixel R&D and Interconnect Technologies
MECH 373 Instrumentation and Measurements
Development, manufacturing and commercialisation of precision equipment for science
MECH 373 Instrumentation and Measurements
Detectors of JWST Near IR Instruments
FSP vacuum considerations
BCTW calibration status and future
Data Transmission System Digital Design Chris Langley NRAO
Detailed information FOR INTERNAL USE ONLY! CUBE20.
Presentation transcript:

FSP progress update & camera concept Contents: Mechanical structure System components CCD sensor and circuit examples Hybrid concept IIC concept and tasks Feedthrough and connector interface Johannes Treis MPI Halbleiterlabor Munich,

Mechanical structure Johannes Treis / Halbleiterlabor der MPG Status: Revised design has been evaluated at MPS Design has been verified in the essential parts Feasibility has been shown Open issues to be discussed: Application of spring load Heat pipe vs. heat exchangers Next steps: Finalisation of “proto-design” for building of thermal mockup Manufacturing of components Experimental verification of design in vacuum chamber

Mechanical structure Johannes Treis / Halbleiterlabor der MPG Application of spring load on therad plates Integrate heat exchanger in mechanical support Avoid temperature limitation of heatpipes

System components Johannes Treis / Halbleiterlabor der MPG SequencerADC / DAQ Outboard Interface Inboard Interface Hybrid Power Sensor Backend Instrument Interface circuitry (IIC) Cooling

CCD sensor Johannes Treis / Halbleiterlabor der MPG CCD sensor: Concept: Backside illumi- nated, frame store, split frame, column-parallel readout pnCCD Format: 1k x 1k storage, 2 x 1 k x 0.5 k framestore Pixel size: 36 x 36  m 2 Total sensitive area: 36.8 x 73.3 mm 2 Total chip size: 4.2 x 8.1 mm 2 Operating temperature: -35°C (target) 16 “blinded” common mode correction channels for each hemisphere (re- wired on pitchadapter) Target operating framerate: 400 Hz (~4  s / row) Data rate: 840 Mbyte / s (16 bit) Backside optimized for optical wavelength using ARC

Hybrids Johannes Treis / Halbleiterlabor der MPG In addition: RFET circuitry on each hybrid

Focal plane assembly Johannes Treis / Halbleiterlabor der MPG

CCD channel schematic Johannes Treis / Halbleiterlabor der MPG

RESET FET control Johannes Treis / Halbleiterlabor der MPG 1 channel per hybrid required Galvanical decoupling, as digital part of MAX 4420 not „floating“ Bootstrapped RFET_Gate_hi power supply ~ 10 V switching amplitude ~ - 18 V Lo level

 -Driver schematics Johannes Treis / Halbleiterlabor der MPG 6 channels per hemisphere required (NW, SW hybrids) Galvanical decoupling, as digital part of EL7457 not „floating“ Bootstrapped Phi_hi, Amp_hi Power supplies ~ 10 V switching amplitude (Amp_hi - Amp_lo) ~ - 18 V Phi_Lo level Identical circuitry for FS and ST 4th „dummy“ channel for monitoring purposes?

Calibration Switch Johannes Treis / Halbleiterlabor der MPG 1 channel per hybrid or 1 channel per system? Optional „source spy“ could make absolute source node potential observable Useful for debugging and parameter adjustment Analog output Multiplexer with zero pass-through resistance, „bidirectional“ Digitization of source potential?

FET source regulation Johannes Treis / Halbleiterlabor der MPG Veritas FE current regulation: Input stage current for CCD FET Need to regulate VSSS current core-individually Monitoring of current is mandatory

Thermal management Johannes Treis / Halbleiterlabor der MPG CoolingTemperature control

Circuit temperature Housekeeping: Environmental sensors Johannes Treis / Halbleiterlabor der MPG DAQ central housekeeping slow control interface IIC inboard compartment IIC outboard compartment Casing temperature Circuit(s) temperature Heatsink temperature Backbone temperature Pressure sensor Humidity sensor (?) Hybrid temperature Sensor temperature PHI temperature Hybrid temperature Sensor temperature PHI temperature Hybrid temperature Sensor temperature PHI temperature Hybrid temperature Sensor temperature PHI temperature Hybrids Housekeeping circuitryrequires „IRQish“ functionality to e.g. Trigger transition to safe mode In case of critical errors

ASIC supply currents Detector supply currents PHI driver supplies? ASIC supply currents Detector supply currents PHI driver supplies? ASIC supply currents Detector supply currents PHI driver supplies? ASIC supply currents Detector supply currents PHI driver supplies? Housekeeping: Monitoring of supplies DAQ central housekeeping slow control interface IIC inboard compartment IIC outboard compartment Common supplies Current draw Locally generated secondary voltages Current draw Locally generated secondary voltages Hybrids Johannes Treis / Halbleiterlabor der MPG

Housekeeping: Watchdog Johannes Treis / Halbleiterlabor der MPG DAQ central housekeeping slow control interface IIC inboard compartment IIC outboard compartment Hybrids Digital HB of all VERITAS Implement PHI HB? Digital HB of all VERITAS Implement PHI HB? Digital HB of all VERITAS Implement PHI HB? Digital HB of all VERITAS Implement PHI HB? FPGA HB ? Watchdog signal requires „IRQish“ functionality to e.g. Trigger transition to safe mode In case of critical errors

Sequence distribution Johannes Treis / Halbleiterlabor der MPG DAQ central housekeeping slow control interface IIC inboard compartment SW Hybrid NW Hybrid NE Hybrid SE Hybrid IIC outboard compartment Phi, RFET, SCK, MCK RFET, SCK, MCK

Power Johannes Treis / Halbleiterlabor der MPG Simple Main power supply: Few voltages, few feedthroughs Veritas supply w/ sense lines to inboard IIC (depending on trace resistance also other high current supplies Local power generation on inboard IIC for low power, low current supplies Inboard compartment contains distribution / decoupling, measurement and power up circuitry

Example vacuum feedthrough Johannes Treis / Halbleiterlabor der MPG Power feedthrough: ~20 power pins + ~10 sense lines Different current loads require different pin sizing / multiplicies Digital signal feedthrough: 36 sequencer pins (18 control signals from sequencer) 16 configuration and monitoring interface pins (2 independent 4-wire-interfaces) 16 monitoring pins (8 selectable heartbeat signal outputs Analog signal feedthrough: 64 analog signal pins (4 x 8 differential analog output signals) 8 analog monitoring pins (4 x 2 single ended selectable analog signal outputs) Min. Number of pinsComments Power feedthrough30 x x GNDsDedicated cross sections / optimized resistance Digital feedthrough68Input and output Analog feedthrough72Differential and single ended

Example hybrid pinout Johannes Treis / Halbleiterlabor der MPG Summary: If common connector: pins for one single connector (sufficient grounding pins?) “Pin Multiplicity” for ground and supply lines ( as function ofr current draw) needs to be determined If separate connectors: x pins for supply & bias connector, x pins for signal connector Dedicated connectors reduce the need for “high pin multiplicity”, as choice of proper connector design e.g. for power can provide suitable connector impedance. As small and compact design as possible (size constraints!) Vacuum compatible