Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.

Slides:



Advertisements
Similar presentations
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Advertisements

Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Overview of Data Management solutions for the Control and Operation of the CERN Accelerators Database Futures Workshop, CERN June 2011 Zory Zaharieva,
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Front-end amplifiers for the beam phase loops in the CERN PS Alessandro Meoli (CERN BE/RF/FB) Supervised by Heiko Damerau 21 April CERN.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
RF Systems Commissioning O. Brunner AB/RF on behalf of the RF group (LTC – March ’08) Many thanks to L. Arnaudon, Ph. Baudrenghien, W. Hofle, D. Valuch,
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
AB-RF-FB LLRF Developments at CERN Historic Overview, Highlights, Future Challenges Flemming Pedersen.
Draft for approval in ABMB, 4 Feb 08 Andy Butterworth Claude-Henri Sicard for the Controls Coordination Committee (CO3) 22 Jan 20081ATC/ABOC Days.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
RF and Transverse Dampers Current Systems Wolfgang Hofle W. Hofle - RF+Dampers - R2E and Availability Workshop OCtober Acknowledgements: RF.
Controls renovation workshop Standardized Hardware Modules Javier Serrano, AB-CO-HT MJD
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
The 1 st year of TMS operations Stéphane Bart Pedersen BE-BI-SW November 2011.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Jan 23rd, 2008M.Vanden Eynden on behalf of the AB-CO Group1 AB-CO MTTR & Spare Part Policy for the LHC Injectors, Experimental Areas & other Facilities.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
The ACCOR Project Status Report and Outlook for 2010 and beyond M.Vanden Eynden on behalf of the ACCOR Project Team 1M.Vanden Eynden (BE/CO) - IEFC Workshop,
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
ISOLDE Vacuum Controls (CERN-GSI WS), S. Blanchard TE-VSC-ICM UNICOS implementation in ISOLDE Sebastien Blanchard TE/VSC Interlocks, Controls.
LS1 Mid-Point Status Report of the PSB Low Level RF, Transverse Feedback & High Level RF. Autumn 2013 A. Akroh, M.E. Angoletta, A. Blas, L. Arnaudon, A.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
AWAKE synchronization with SPS Andy Butterworth, Thomas Bohl (BE/RF) Thanks to: Urs Wehrle (BE/RF), Ioan Kozsar, Jean-Claude Bau (BE/CO)
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
ALBA RF Systems Francis Perez.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
V4.
Injector II Low Level RF & Interlock – Status
CC LLRF SM18 test plan and BA6 infrastructure
RF acceleration and transverse damper systems
Accelerator Controls Renovation Project “ACCOR”
Controls & software Andy Butterworth.
Summary of Session 6 ATC/ABOC days
PS status 10 August – 17 August 2017
LHC-RF activities in LHC PT 4 TS2 YETS LS2
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Overview and System Design for ESS LLRF Systems
ILC LLRF Status Ruben Carcagno, Brian Chase
DLS Standard PLC System
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
352MHz Klystron Control for the 3MeV Linac test stand
Linac4 RF System Operation for the Reliability Run in 2017
RF and Sequences Andy Butterworth BE/RF
PS Machine Changes during the 2009 Shutdown
Presentation transcript:

Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008

Overview Motivation Work Packages Resources Conclusions

Motivation Renewal of RF equipment Renewal of obsolete equipment controls hardware and legacy systems – CAMAC, 1980s Simatic, relay logic… – Reliability, availability of spares – Chaotic evolution due to backward compatibility, responsibility split across groups – Obsolescence of some CO HW modules Pentek synthesizer… Renewal of CO HW platforms – Performance limitations of RIO2 “New model” for controls – Clarifies responsibilities – Migration to current SW standards will enhance maintainability – More standardization of controls across RF group

Work packages: SPS (1/2) Work Package:SPS Front-end & Application software Scope: All SPS Front-End SW to FESA on new PC platform; MMI application eradication Motivation: Obsolescence: HP-UX no longer supported. Target date: Q2/2009 kCHF: 10Budgeted:No FTE:1.3 Work Package:SPS Travelling Wave 800 MHz power and cavity controls Scope: New PLC systems + FESA for 800MHz transmitters and TW200/800 cavities Motivation: Upgrade of 800MHz power plant, obsolete relay logic in cavity controllers Target date: Q2/2010 kCHF: 30Budgeted:Yes FTE:0.8 Work Package:SPS Travelling Wave 200MHz cavity controls Scope: New PLC systems + FESA for 800MHz Tx and TW200/800 cavities Motivation: Obsolete Simatic logic controllers, spares availability becoming critical Target date: Q1/2011 ? kCHF: 30Budgeted:Yes FTE:0.8

Work packages: SPS (2/2) Work Package: SPS Schottky (CAMAC/Equipment Module) Scope: New controls solution for plates movement (BA1) and amplifiers (BA2) Motivation: Obsolescence: CAMAC/Equipment Module Target date: 2012 ? (Currently not used) kCHF: ?Budgeted:No FTE:0.3

Work packages: CPS Work Package:CPS 40MHz cavities tuning Scope: Install missing controls functionality for cavity tuners (timings, GFAS) Motivation: Tuning becoming critical for efficient operation Target date: Q2/2009 kCHF: 5Budgeted:No FTE:0.1 Work Package:CPS Timing distribution Scope: Replace CAMAC Timing Surveillance Modules with VME version. Or upgrade timing modules to CTRVs (internal diagnostics). Motivation: Obsolete CAMAC HW. Reduce complexity and increase reliability. Target date: 2012 ? kCHF: 20Budgeted:No FTE:0.3

Work packages: PSB, ADE, REX-ISOLDE Work Package:PSB Digital upgrade for beam control Scope: Replace all beam control HW with DSP-based systems Motivation: Performance for high intensity LHC beams, LINAC4 Target date: 2010 kCHF (controls): 50 Budgeted:Yes FTE (controls):1.0 Work Package:ADE Stochastic cooling pickup motor control Scope: Replace existing analogue system with new digital controllers Motivation: Motion controller HW obsolete; spares & reliability issues. Target date: Q2/2009 ? kCHF: 30Budgeted:Yes FTE (controls):0.3 Work Package:REXTRAP RF control Scope: New HW and SW for RF signal generation for the REXTRAP Penning trap Motivation: Legacy system (stand-alone) from REX collaboration. Alignment with CO standards. Target date: Q2/2010 kCHF (controls): 25 Budgeted:Yes (REX budget?) FTE (controls):1.2 (Technical student)

Work packages: CTF3 Work Package:CTF3 Low Level RF and interlocks PLC control Scope: Develop new FESA class to interface new PLC software; new PC platform Motivation: PLC & existing front-end overloaded Target date: Q2/2009 kCHF (controls): 3.5 Budgeted:No FTE (controls):0.2 Work Package:LPI klystron modulator controls Scope: New PLC system + interface electronics for 7 modulators; 1 new FESA class Motivation: Obsolete HW (CAMAC/G64), from multiple groups. Operational problems: loses data after power cut etc. Target date: 2011 kCHF: 250 (Eq. HW + cabling)Budgeted:Not yet FTE (controls):0.8

Work packages: Front-End software Work Package:Redevelopment of RF specific front-end software Scope: 14 additional GM classes (CPS, PSB, ADE and CTF) to migrate to FESA Motivation: CO migration of front-ends to new CPUs + Linux. Responsibility for these classes passes to RF group as agreed in CO3. Target date: , following CO front-end HW upgrades kCHF: FTE:3.5

GM classes for renovation POW: Currently responsibility of PO – will change in future? LINPSBLN3LEICPSSPSADEISOCTFAccClassNameCreatorDescription 1 1 CPSRFBURSTV.ADORNIRF BURST generator RFPSL.MERARDControl cavities RF for PS, PSB, EPA & ADE 1 PERTUM.GOURBERCVM for C200MHz radial perturbation 2 RFMATC.H.SICARDCPS RF Matrix Control (9.5 & 200 MHz) RFMEASJ.M. BOUCHETrain RF Measurements 1 PSBHP5335AJ. SERRANO Measures frequency with Universal Counter HP5335A 1 1 LINRFLNPL.MERARDLINAC 2 radio frequency (PLC) 1 1 LN3RFLINDAVYDENKOcontrol for LINAC 2 radio frequency 1 ADESTOCAMPV.ADORNIStochastic cooling AD 1 STOCPOWV.ADORNIStochastic cooling AD 1CTFCGUNL.MERARDCTF control du gun Clio 1 FDELAYS.DEGHAYEFine-delay crate control (Jonathan Sladen) 1 HP8665BJ.M.NONGLATONGPIB ENET control HP8665B Synthesizer 1 MDKL.MERARDLPI modulator klystrons 1 MDKPL.MERARDCTF3 modulator (PLC) 1 RFMKSPJ-M.NONGLATONCTF3 modulateur controle de phase

Resources AB/RF/CS section comprises: – Software: 3 staff associates (  2+1 in 2010) – Controls hardware & PLCs: 2.5 staff Total of 8.1 FTEs needed over 2009, 2010, 2011 to complete the above WPs – Of which 3.5 for Front End SW renovation – Will have to be found within the section or using additional manpower (PJAS, students)

Conclusions A number of renovations driven by equipment renewal, obsolescence and operational requirements A large proportion of the software renovation driven by HW platform upgrade Human resources will be the limiting factor – Will probably need additional manpower (PJAS…) – Software renovation will need to be carefully staged