Global Design Effort - CFS ILC Integrated Design Meeting, DESY, 28-29 May 2009 1 ML Single Tunnel Configurations In Deep Underground Accessed with Long.

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Conventional Facilities and Siting 1 Alternate Site and Tunnel Configuration Status Report KEK (2) Nov. 2008, Chicago Global Design Effort Masami Tanaka.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
SLAC_OCT07 BDS-KOM-CFS 1 Beam Delivery System & Interaction Region KOM Conventional Facility & Siting Overview Fred Asiri/SLAC Acknowledgment: Atsushi.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
BAW1 RDR Confg For Mntn Rgn (S. Fukuda) 1 RDR configuration for Mountain Region S. Fukuda/KEK.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
June Recent Development of DRFS (Fukuda) SCRF-Meeting 1 1 Recent Development of DRFS (Based on Japanese CFS Tunnel Plan) S. Fukuda KEK.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
Conventional Facility & Siting (CF&S) Overview for the Positron Source
Americas KlyCluster Cost Analysis Overview
CLIC / ILC Collaboration for CFS works
Summary Some Issues of Future Consideration
Status of Cryogenics Facilities Design
CLIC Civil Engineering Update
ILC CFS AD&I Daresbury Lab Summary
Presentation transcript:

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long Sloped Tunnels Atsushi Enomoto KEK

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Contents of this talk  Talk limited to the Main Linac area  Two alternatives of RF power distribution systems compared with RDR.  Pros and cons.  Cost impacts.  Risk assessment.  Construction schedule, operation, & availability.  Site-specific issues.  Work plan for ALCPG09.

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May RDR RF power distribution system (1 RF unit) RF Output 10 MW peak ~75 kW average 26 1 Cryogenic Module

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Klystron Cluster power distribution system A Klystron Cluster with 70 klystrons feeds 64 accelerator modules. RDR X 70 RDR X 64 Long high-power waveguides

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Reference slides: RF Cluster Scheme,

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Surface Station of RF Cluster Scheme A cluster of 70 Klystrons feed 64 RF units

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Estimation of floor size

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Local distribution of RF Cluster Scheme

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Schematic layouts of conventional facilities and RF units Four more surface stations

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May DRFS power distribution system (1 RF unit) Distributed 13 small klystrons feed 26 cavities in one accelerator modules. X 13 Lower voltage

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May reference slides:

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May (2) Distributed RF System (Tunnel view)

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May (2) Distributed RF System (Tunnel view)

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May (2) Distributed RF System (Tunnel view) Tunnel Size Under Consideration Pros; no big step-up transformer, less waveguides. Cons; more klystrons and drive systems. - XFEL and TESLA design are references -

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Pros and Cons on CFS compared with RDR CF ItemsRDRRF ClusterDistributed RF Civil Tunnel:  4.5m, 22.3 km x 2 Penetration:  0.43m x 10 m x 560  0.3m x 10 m x 2 x 560 Safety path: 1.2m x 2.2m x 20m X48 Sloped tunnel: 7m x 6.5m x ~1,270m x 6 Cavern: 16m X18m X120m x 6 Surface building: 4,300m 2 Half long tunnel Eliminated penetrations Smaller shaft-base caverns Four additional shafts / tunnels Larger surface area and buildings Fire compartments / refuge areas Half long tunnel Eliminated penetrations --- Fire compartments / refuge areas Larger tunnel diameter ? Fire compartments / refuge areas Electricity RF: 76 MW Conventional Power: MW Emergency Power: 0.4 MW Reduced tunnel maintenance electricity ~10% more electricity for klystron Reduced tunnel maintenance electricity --- Process Cooling Water LCW: 56 MW Chilled water: 21 MW Eliminated tunnel LCW Skids Reduced size but stainless pipe for LCW ~10% more heat loads for klystron HVAC Eliminated tunnel fan coil and chilled water HVAC for four additional shafts / tunnels Other Areas Reduced safety equipment Increased piped utilities for fire suppression Reduced safety equipment Increased piped utilities for fire suppression

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Pros and Cons compared with RDR CF ItemsRDRRF ClusterDistributed RF Safety Opposite tunnel is the refuge area when troubles occurred. Escape paths connect two tunnels at every 500 m. High-power equipment moved to surface Need smoke exhaust ducts and refuge areas at every 600 m (US regulation) Or Need fire/smoke compartment at a proper distance Lower-voltage equipment Need smoke exhaust ducts and refuge areas at every 600 m (US regulation) Or Need fire/smoke compartment at a proper distance Availability Service tunnel accessible even during operation. More surface equipment Some tunnel equipment not accessible --- Some tunnel equipment not accessible Construction s Less underground Civil E works More surface works Less underground Civil E works - Risks High-power treatment

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Details on CE criteria for cost estimates Main Linac CFRDRRF ClusterDistributed RF Tunnel Penetration Safety path Safety area  4.5m, 22.3 km X2 (double) (  0.43m,  0.3m X2) X10m X m X2.2m X20m X48 Opposite tunnel  4.5m, 22.3 km X1 (single) None Refuge area  4.5m, 22.3 km X1 (single) None Fire/smoke protection Access shaft/tunnel (Size and quantity) X6 7m X6.5m X~1,270m X10 7m X6.5m X~1,270m X m X3.5m X~1,270m X4 X6 7m X6.5m X~1,270m X6 Shaft-base cavernX6 16m X18m X120m X6 ~ half X6 16m X18m X120m Surface buildingX6 4,300m 2 X10 (4,300m 2 +1,000m 2 )X6 ~3,800m 2 X10 X6 4,300m 2 X6 Remarks Tunnel and shaft-base cavern decreased but access-tunnels and surface buildings increased Tunnel decreased half

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Preliminary cost estimates based on RDR cost WBS

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Preliminary results (only for Civil work) Main Linac CFRDRRF ClusterDistributed RF 1711 Engineering8.4% -1.9% 6.5% -3.1% 5.3% 1712 Underground75.3% -26.8% 48.5% -28.8% 46.5% 1713 Surface6.7% +14.6% 21.3% +0% 6.7% 1714 Site development9.6% +2.3% 11.9% -2.2% 7.4% 171 Total100.0% -11.8% 88.2% -34.1% 65.9% Remarks Decreased cavern size and increased access tunnels almost cancelled

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Reference slide: Cost impact factor (RDR)

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Process Cooling Water 10.8 MW Chilled Water 3.4 MW 104 RF units 208 Cooling Fans 26 skids Racks in 104 RF units 26 skids In RF cluster scheme, ~40% of the heat loads remain in the undergroud. Area for substation at shaft-base cavern and RF skids will be reduced in capacity but not eliminated. Cooling system evaluation will be studied

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Site specific issues for Asian sample site

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Inpacts on design: Longer transportaion of RF (RF cluster)

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Longer transportaion of RF (RF cluster)

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Potential plans for further study

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Summary of this talk  As a study of minimum machine, two kinds of single-tunnel schemes were investigated if they might be applied for the Asian sample site (deep tunnel).  Though both of two are considered applicable, from a civil-engineering point of view, “Distributed RF Scheme” seems more suitable for the Asian site.  Further studies should cover overall CF designs such as cooling issues until ALC09.

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May APPENDIX 1

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May GDE ACCELERATOR ADVISORY PANNEL REVIEW CONVENTIONAL FACILITIES AND SITING GROUP Fire Safety for Single Tunnel Preliminary Study Masami Tanaka

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May Purpose of Study ▪ Change of tunnel scheme from twin to single configuration has been studied as effective cost reduction means in the value engineering efforts of TDP-1. configuration has been studied as effective cost reduction means in the value engineering efforts of TDP-1. ▪ Study of an impact or drawback on operation and safety caused by change of tunnel configuration has been performed. ▪ Among safety issues, fire safety is the essential concern.

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Safety Measures ▪ Following fire safety measures which are planned for twin tunnel are applicable to single Tunnel too. ▪ Following fire safety measures which are planned for twin tunnel are applicable to single Tunnel too. ・ Prevention ・ Prevention ・ Early detection ・ Early detection ・ Smoke control ・ Smoke control ・ Evacuation support equipment ・ Evacuation support equipment ・ Operational measures ・ Operational measures 30

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Evacuation Scheme ▪ Evacuation method for twin tunnel illustrated below is not possible for single tunnel. ▪ Evacuation method for twin tunnel illustrated below is not possible for single tunnel. ▪ Alternative method must be developed. ▪ Alternative method must be developed. 31

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Evacuation Methods for Single Tunnel ▪ Following four methods are conceived at present 32

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Evacuation Passageway Method ▪ A narrow passageway is provided in the is provided in the tunnel. tunnel. ▪ The passageway is shielded with fire wall shielded with fire wall and fire door from the and fire door from the tunnel. Fire and smoke tunnel. Fire and smoke free inside the passageway. free inside the passageway. ▪ Diameter of tunnel is enlarged. 33

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Compartmentation Method ▪ Dividing a space in limited areas with fire wall is the most effective way to fire wall is the most effective way to prevent a spreading of fire and smoke. prevent a spreading of fire and smoke. ▪ People are safe by moving to the adjacent area. adjacent area. Fire 500 m Fire 500 m Water screen Fire door Water screen Fire door Water screen method Fire door method Water screen method Fire door method (XFEL) (CLIC) (XFEL) (CLIC) 34

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Refugee Area Solution ▪ The alcoves are 1.25 km. along the tunnel. Water curtains protect it from fire the tunnel. Water curtains protect it from fire and smoke. and smoke. ▪ The refugee area is provided inside provided inside the alcove. the alcove. ▪ It is shielded by fire wall and fire fire wall and fire door. door. (Figure by T. Lackowski, FNAL) (Figure by T. Lackowski, FNAL) 35

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Shielded Power Sources Solution ▪ This solution is conceived in conjunction with Distributed RF System. with Distributed RF System. ▪ Potential sources of fire shall be located in the shall be located in the area shielded by fire wall area shielded by fire wall in the tunnel. in the tunnel. 36

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Summary ▪ Evacuation method optimum and conforming to selected tunnel configuration shall be to selected tunnel configuration shall be chosen from above mentioned methods. chosen from above mentioned methods. ▪ Presumably, there will be no drawbacks on safety for single tunnel configuration. safety for single tunnel configuration. 37

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May APPENDIX 2

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Allowance of Safety Equipment* in Japan Masanobu Miyahara KEK CF Department * except radiation safety 39

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 General Laws for Safety and Jurisdiction authority ▪ Architecture The Japanese Construction Standard Act. Ministry of Land, Infrastructure, and Transport. ▪ Car Tunnel ▪ Car Tunnel Regulations exists. Ministry of Land, Infrastructure, and Transport. ▪ Subway Regulation exists (revised strictly after Korean accident), Ministry of Land, Infrastructure, and Transport. ▪ Railway Tunnel Independent Regulation, Japanese Railway Co. 40

Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May 2009 Standars for Safety Equipment of Public Facilities vs. KEK Accelerators 41 ■Regulations for Road Tunnel ●Japanese Construction Standard ○ Spontaneous by KEK Items Public FacilityKEK Accelerator Remarks Road tnl.Infra tTunnelHall AlarmEmergency Call ■ × ○● Emergency Button ■ × ○● Fire Alarm ■ × ○● Emergency Alarm ■ ×× ● Fire FightingFire extinguish eq. ■▲▲● ▲ Fire Fighting Regulation Hydrant ■ ×× ● Escape Smoke exhaust Or Escape way ■ ××○*×○* ● ○ * Escape-way within 300m without smoke exaust Escape-way Sign ■ × ○● OthersBroadcast ■ ×× ● Sprinkler ■ ×× ●*●* ● * connectable water pipe Surveillance camera ■ × ○● Fire compartment ▲▲● ▲ Fire Fighting Regulation