Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March 2016 www.europeanspallationsource.se.

Slides:



Advertisements
Similar presentations
1 Requirements Conformance for SRF cryomodules October 2014 Lund P. Bosland (on behalf of the CEA/Irfu and CNRS/IPNO teams) ESS elliptical cryomodules.
Advertisements

Overview Interfaces Planning.  One PC to control 2 cavities in one cryo-module  Standard PLC and hardware components  Expected PLC cycle time 2ms.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SRF Cryomodules November 2013 Meeting
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
ESS cavities interfaces
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
The ESS Cryomodules 2012 December, 5th Christine Darve
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Accelerator / Elliptical Cavities Cryomodules
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
1 P. Bosland - SRF Collaboration 15 December 2015 Daresbury Status of the prototype M-ECCTD and high beta prototypes M-ECCTD: Engineering studies completed.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
C. Darve / Technical Board – December 13 th, 2012Preliminary pressure vessel code requirements Preliminary pressure vessel code requirements Technical.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.
Christine Darve ESS deputy WP leader Pierre BOSLAND, CEA Saclay External WP5 leader With special Acknowledgment to Nuno Elias (ESS) and Gilles Olivier.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
THE ESS ELLIPTICAL CAVITIES CRYOMODULES STAT US ON THE CEA SACLAY ACTIVITIES P. BOSLAND & F. ARDELLIER TAC13 07 th APRIL 2016.
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
Accelerator/Elliptical Cavities Cryomodules Pierre BOSLAND, CEA Saclay External WP5 leader Christine Darve, ESS deputy WP leader
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
RF Systems and Controls for the LERF CM Tests
Cryomodule test stand at ESS site
WP5 Elliptical cavities
at STFC Daresbury laboratory
Medium beta cryomodule demonstrator M-ECCTD
T5.2: Harmonization - Material and Component Reference
Uppsala Commitment to ESS and FREIA Planning
XFEL Vacuum System Commissioning
Test plan of ESS HB elliptical cavity
ESS RF Development at Uppsala University
UK RFD Pre-Series cryomodule
Optimum cryomodule length at the ESS
IHEP Cryomodule Status
SPOKE Cavities frequency preparation plan and RF control procedures
Cryomodule Assembly Plan
Cryomodules Challenges for PERLE
RF systems introduction
Daresbury ESS In-Kind Contributions
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Licensing requirements for Cryomodules
The spoke CM tests at FREIA
Tasks, Responsibilities Expectations and Needs
How Do We Define Acceptance of a Cryomodule? - A Discussion
Pierre Bosland – on behalf of the ESSI team (ESS Irfu)
RF introduction Anders Sunesson RF group leader
Facility for Research Instrumentation and Accelerator Development
High level ESS SRF test plan
Presentation transcript:

Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March

Background 2  Use the H-ECCTD to complete the objective of the M-ECCTD See 2013, November 21: Cryomodule Workshop - Interface WP4/5-WP11, define ECCTD : Elliptical Cavity Cryomodule Technology DemonstratorNovember 21: Cryomodule Workshop - Interface WP4/5-WP11, define ECCTD Technical Annexes (CEA): #1.1 – Component supply #1.2 – Assembly in CM #1.3 – Support expertise -impact on STFC -impact on LASA #1.4 – Installation Commissioning Requirements Interfaces 

Cryogenic distridution Cryomodule Stakeholders ESS lead engineers and WPs leaders Cryomodule designers Cavity package designers Component assembly teams Control command (Control Box, PLC, LLRF, MPS) Instrumentation teams (diagnostic, TT, pu, PT) Safety team (PPS, ODH, etc..) RF team (RFDS, LLRF, Interlock, HPRF) ESS system engineer, QA Survey experts Test stand service Toolings Transport Conv. Fac. Cryogenic distribution Radio-frequency Beam Vacuum Beam Diagnostic Beam Optics Control system ACCSYS Work Package leaders ACCSYS Integration section

Cavity Cryomodule Technology Demonstrator Validate designs (incl. SRF cavities, coupler, CTS) Prepare the industrialization process by validating component life-cycles (incl. assembling process, QA) Validate performances (incl. RF, mechanical, thermal) Develop ESS 704 MHz SRF linac operating procedures Validate control command strategy (Control box, PLC, EPICS, LLRF) Test the ESS integration and interface with cryogenics, vacuum systems Train people and build collaboration Develop expertise in SRF technology One full scale cell of 704 MHz high- and medium-beta cavity cryomodule  Similar process for the spoke cryomodules A staged approach towards the ESS Linac tunnel installation

Goal of Cryomodules Technology Demonstrators Validate the life-cycles of the cryomodule fabrication, assembly and operation Validate interfaces of the cryomodule with the Stakeholders –RF, CRYO, Vacuum, ctl, support, etc.. Validate the performance of the ECCTD at low RF power and cryogenic condition, before initiating series fabrication Identify possible issues and transfer knowledge to industry for series fabrication Support control system (control box, instrumentation, process variables, EPICS, etc) 5 Power coupler Cold tuning System Helium tank 5-cell elliptical cavity Space frame Other components: Magnetic and Thermal Shields Supporting system Etc..

RF power test stations at CEA Saclay 704 MHz RF Plateform Pilot Switch RF Security box water C/C Water vacuum Safety RF Fast acquisition (RF signals, electron pick-up, arc detector by photomultipliers) + slow acquisitions (vacuum…) Signals for fast interlock Coupler Conditioning Security box C/C Water Vacuum Cryo safety RF ESS Cryomodule (ECCTD+ pre-series) Security box C/C Klystron: 704 MHz 1 MW Modulator HT 110 kV Circulator + load waveguides Supratech Cryogenic system Manual switch What we have:

Tests station at Saclay What we have:

 Design the ESS Engineering data management system  Common platform aiming at ESS Linac operation and maintenance  Content for the management of: Cavities and cryomodules PBS 3D cad of main accelerator components Track S/N Track component signature, e.g. calibration Track life-cycle of identified components Include installation procedures Include operating procedures Include maintenance procedures Etc.. What we need:

9

Radiation hardness 12

Tunnel cross-section 13

ESS Wish list – H-ECCTD ? Validate the life-cycles of the cryomodule fabrication, assembly and operation procedures Validate the performances…  Test plan shall including elements to qualify: –Cryogenic  e.g. heaters to calibrate heat load measured on cavities, power coupler –Vacuum  e.g. pump down time –RF load  test the LLRF system, CTS sequences –ICS: Control variables, EPICS –Support control system (instrumentation, process variables, EPICS, etc) Support the risk analysis –Failure scenarios and what-if analysis, FMEA –Maximal Credible Incident –Maintenance modes –Instrumentation and fail-safe modes –Valves and Instrumentation standardized CEA test area extrapolation to ESS tunnel: constraints and boundary conditions 14

RF - LLRF and interlock system 15 Test cold tuning system with the M-ECCTD and H-ECCTD - Fast, piezo - Slow tuning system, stepper motor - LLRF Control of CTS – slow tuner with IOC

WP 8: LLRF and control schematic 16 RF cell control LLRF system Cavity with subsystems

EXTRA 17

Cavity fabrication Cryomodule components fabrication Cavity string assembling in clean room Validation test of the cavity in vertical cryostat Validation test of the cryomodule Cryomodule on beam line Power coupler fabrication Coupler RF processing Cryomodule assembling Tools fabrication Chemical treatment High pressure rinsing In clean room (ISO5 or ISO4) Assembling in clean room Transport Qualified cavity storage Cryomodule reception and storage Cryomodule storage Processed couplers storage Courtesy of Pierre Bosland CEA/IRFU Space frame Beam valves and extremity flange TA6V rods in X pattern to keep the beam axis at the same position during cool down Magnetic shield Tuning system Cryomodule life-cycle

P. Bosland CEA-Saclay Access traps to the tuners Helium safety valve Cavity supports: TA6V rods Cryogenic line interface Space frame Magnetic shield close to the cavity Thermal shield inside the space frame 1,2 m