August 16, 2007ILC Video Conference at FNAL Update on testing of Jlab fabricated 9-cell cavities P. Kneisel, G. Ciovati.

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
3.9 GHz Deflecting Mode Cavity Timothy W. Koeth July 12, 2005.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
US Cavities Status and Plan Mark Champion 01 October 2009.
Cavity package T.Saeki BCD meeting 20 Dec Cavity shape BCD: TESLA shape Pros: small wakefield, HOM thoroughly investigated single-cell: 43 MV/m.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
R.L. Geng, 8/28/07AES cavity meeting, JLAB1 AES 9-cell ILC Cavity Processing and Testing at JLAB What have been learned and proposals for future steps.
STF B.L.C. #4 second Vertical Test Summary Period : 2006/09/05~09/08 Contents : ▪ Q 0 -E acc 2K&4K ▪ Q 0 &E acc time 2K&4K ▪ Summary.
3 June 2012 BE-KT Innovation Day Prevessin, CERN, Switzerland
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
High Q R&D at JLab G. Ciovati, P. Dhakal, R. Geng, P. Kneisel, G. Myneni TTC Topical Meeting on CW SRF Cornell Univ., June 12 th -14 th, 2013.
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Advanced Energy Systems, Inc. Prototype Cavity Fabrication & Test Presented by Ilan Ben-Zvi, BNL for Michael Cole, AES.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
Summary of temperature mapping developments G. Ciovati, M. Champion AES Cavity Meeting, JLab, August 28 th 2007.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
ELBE SRF Gun Testing Status PeterKneisel (JLAB) For the Rossendorf Team A.Arnold,P.Murcek,J.Teichert,P.Michel,P.Lu, H.Vennekate,R.Xiang T.Kamps (HZB Berlin)
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Update at Peking University Jiankui Hao & Kexin Liu Institute of Heavy Ion Physics Peking University, Beijing LCC-ILC-Cavity Meeting March 04, 2015.
TE-type Sample Host Cavity development at Cornell Yi Xie, Matthias Liepe Cornell University Yi Xie – TE cavity developments at Cornell, TFSRF12.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
Possible Relationship Between Defect Pre-Heating and Defect Size H. Padamsee Cornell S0 Meeting, Jan 26, 2009.
Cost Optimization Models for SRF Linacs
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
Status and plans for the 3.9 GHz section of XFEL
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
for the FNAL/ANL, JLab, and Cornell cavity teams
Surface Analysis of the Quench Area Sample of Cavity Z111
Summary of Fuse Testing for Barrel Module Fuse Boxes
High Q via N infusion R&D at Jefferson Lab
ELLIPTICAL SCRF CAVITIES
Mircea Stirbet Jefferson Laboratory
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
SRF Pb/Nb photoinjector; recent results
Nick Walker (DESY) EU GDE Meeting Oxford
TTC Meeting, 28 February - 2 March, 2011, Milan
Presentation transcript:

August 16, 2007ILC Video Conference at FNAL Update on testing of Jlab fabricated 9-cell cavities P. Kneisel, G. Ciovati

August 16, 2007ILC Video Conference at FNAL One fine grain prototype (SC1) and two large grain (LG1 and LG2) cavities were completed at the beginning of 2007 All cavities received initial bcp of ~ 100 micron and hydrogen degassing at 600C for 10 hrs All cavities were tuned to a flat field profile, no attempt was made to reach 1300 MHz at 2K after final bcp Frequencies after flat field profile tuning: SC1: f = MHz, LG1: f = MHz LG2: f = MHz

August 16, 2007ILC Video Conference at FNAL Testing Testing concentrated on SC1 with bcp We had hoped that we could test the cavity in a shallower dewar (D3, 9 feet deep) to save capacity for the S0 effort (D7/8, 12 feet deep) First two test attempts showed that the helium level could not be maintained above the cavity and the cavity warmed up at low field levels

August 16, 2007ILC Video Conference at FNAL Test #1:shallow dewar 50 micron bcp after hydrogen degassing

August 16, 2007ILC Video Conference at FNAL Test #2: shallow dewar Cavity lowered by 10” in dewar, ~ 7 micron add. bcp ( intended was 20 micron)

August 16, 2007ILC Video Conference at FNAL Test #3: deep dewar Cavity was bcp’d by ~ 11 micron; developed leak at 2K limiting performance to ~ 19 MV/m

August 16, 2007ILC Video Conference at FNAL Test #4: Input probe removed, HPR; heliax-cable breakdown, app. 1 ft below connector,TDR trace showed discontinuity Cable breakdown

August 16, 2007ILC Video Conference at FNAL Test #5 Disassembly of field probe and input probe, HPR, re- assembly; input probe dia increased to 0.25”

August 16, 2007ILC Video Conference at FNAL Stored Energies in pass-band modes

August 16, 2007ILC Video Conference at FNAL Test #5,cont’d Add. Resistance: exponential growth

August 16, 2007ILC Video Conference at FNAL Pass – band mode analysis Normalized stored energies(based on mode calculations by J.Sekutowicz)

August 16, 2007ILC Video Conference at FNAL Pass-band mode analysis,cont’d Test #5: suspect are cells 4/6; 5,1/9

August 16, 2007ILC Video Conference at FNAL Next steps Post-purify cavity at 1250 C at Jlab Remove suffcient material ( ~ 60 micron) prior to re-testing Have results – hopefully – available for discussion on “Fate” of AES cavities ( Aug. 28) Meanwhile continue with large grain cavity LG 1

August 16, 2007ILC Video Conference at FNAL Proposal for T-mapping system Proposal for 2-cell thermometry system for ILC 9-cell cavities G. Ciovati, P. Kneisel Use existing T-mapping system at Jlab based on 16 Allen-Bradley 100 Ohm resistors per card Place thermometers around equator region on two cells, which have been identified by mode analysis in a previous test On each cell 160 thermometers are placed in 5 rows The azimuthal spacing is app. 22 mm and ~ 15 mm along the meridian ( in superfluid helium the spatial distribution of the heat is app. 10 mm)

August 16, 2007ILC Video Conference at FNAL T – mapping, cont’d 2-cell proposalsingle cell system

August 16, 2007ILC Video Conference at FNAL Cost and schedule Procurements:k$ 7.5 Labor (loaded)k$ 31 Schedule: possibly the system could be built in 3 months with sufficient priority