Presentation on Eco-Tourism Development Plan at Sagar Island a part of Integrated Coastal Zone Management Project, West Bengal 20 TH MAY,2016 THE WORLD.

Slides:



Advertisements
Similar presentations
Elevation Skilled & quality craftsmanship of Merlin tradition to make the complex a symbol of class. Foundation Reinforced cement.
Advertisements

Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
COST EFFECTIVE SOFTWARES IN ENGINEERING
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
Aum Sri Sai Ram Current status of construction of plant houses in Odisha.
SEN BUILT versus UNBUILT SEN BUILT versus UNBUILT Source: Environment and energy sustainability: An approach for India, McKinsey & Company.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Skyscraper Construction
Pulivendula 1.  construction area of 1.32 Lakhs Sq.ft comprising Laboratory Animal House, Community center, Shopping Complex, Primary School, Auditorium,
HOUSE BUSINESS COMMITTEE PRESENTATION BY GHRC ON CITY GATE PROJECT 13 th October, 2014.
FACTORS AFFECTING THE COST VARIATION. PRESENTATION STRUCTURE External Development Works External Development Works –Civil Works –Plumbing Works –Electrical.
1 Mid Day Meal Scheme Madhya Pradesh Government of Madhya Pradesh Panchayat & Rural Development Deptt.
CONSTRUCTION OF IGCARL RESEARCH BUILDING COMPLEX
Competency: Draw Foundation Plans
SUBJECT CODE : CE1301 BUILDING TECHNOLOGY
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
DESCRIPTION AND UNITS OF MEASUREMENT FOR COMMON ITEMS
FLOORSFLATSTOTAL AREA FIRST SECOND THIRD ST, 2 ND & 3 RD FLOOR PLAN FLOOR PLAN OF 2 BHK LUX. APARTMENT ON PLOT NO.
Civil engineering branches & scopes
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
School Building ready for Slab casting.. View of the Children's Home.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
TADIPUDI LIFT IRRIGATION SCHEME
FOUNDATION Piling foundation and/or as per Geo Technical engineers recommendation STRUCTURE RCC framed structure WALLS External – 10” including.
Specification & Quantities Estimating
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
ROB at Koratty in lieu of LC No.54 Progress as on
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Week 6 Timber based columns
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
INTEGRATED COASTAL ZONE MANAGEMENT PROJECT AT SAGAR ISLAND MONTHLY PROGRESS REPORT AS OF 31 st JANUARY, 2016 GHOSH, BOSE & ASSOCIATES ( P) Ltd, 8, HARRINGTON.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
Estimating and Scheduling CEE 492
FRONT VIEW OF PETROLEUM HOUSE 1. PLOT SIZE.175 ft x 200ft (35000 Sft) ( Sq yard) (7.778 Kannals) 2. DATE OF START STIPULATED.
PRESENTATION ON PREPARATION OF ESTIMATE OF BUILDING BY Er
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
. TEMPLE ARCHITECTURE Gudied By Presented By Ms KAVITHA P ESARATH K THANKAPPAN LecturerSemester 7,CIVIL Dept of CIVILRoll No:49.
A REPORT ON PRACTICAL TRAINING CONDUCTED AT PUBLIC WORK DEPARTMENT(PWD),KOTA FROM 15/6/2011 TO 14/7/2011 Submitted to: Mr. Rajneesh Sharma HOD {Civil Dep.}
Pradhan Mantri Awaas Yojana (Gramin)
(Integrated Coastal Zone Management Project) Department of Disaster Management Government of West Bengal.
(A State Government Company)
Tanvee Housing Complex (HIG & MIG)
Construction prodecure of Building
ELCITA UPDATE November 2016.
Termiticide: Method of Application
Table (3.1)- the averages of the 10 models costs
Building Planning and Drawing
RIBA Plan of Work 2013.
CEN 180: Civil Engineering Drawing II
Construction Project Management
City:- Corporation of City of Panaji
Pre-Contract Cost Control
DO’s and DON’Ts of toilet construction
Awarding Criterion for late tender: the lowest bid- why?
Building Construction I Sofia Sebastian 1
Component or parts of a building
ELCITA UPDATE December 2016.
Value of contract: Length of contract: Contract start date:
Concrete A structural material made by combining cement, sand, aggregate, and water.
TCU-PROJECT: 7TH Semester Course
DO’s and DON’Ts of toilet construction
DO’s and DON’Ts of toilet construction
::Address Location:: 1450, Madurdaha, Hussainpur,
Competency: Draw Foundation Plans
6th. Semester Schedule: 1st. Week
RIBA Plan of Work 2013.
Presentation transcript:

Presentation on Eco-Tourism Development Plan at Sagar Island a part of Integrated Coastal Zone Management Project, West Bengal 20 TH MAY,2016 THE WORLD BANK

INTEGRATED COASTAL ZONE MANAGEMENT PROJECT AT SAGAR ISLAND

INTEGRATED COASTAL ZONE MANAGEMENT PROJECT AT SAGAR ISLAND Name of Project : Eco-Tourism Development Plan at Sagar Island, West Bengal, India Co-ordinator : State Project Monitoring Unit (SPMU), West Bengal PEA: : Sundarban Infrastructure Development Corporation ( a Govt. Enterprises of West Bengal) Consultant (ACF With PMC ) : HYDEA SpA, Italy and Ghosh, Bose & Associates (P) Ltd, India JV Project Cost : Crore

BRIEF DESCRIPTION AND LOCATION OF THE PROJECT Sl. No. Name of WorkBrief Description and Location of Site Name of the Contractor Value of Work Awarded 1 Public Rain Shelter Cum Nat Mandir And Public Rain Shelter Cum Dala Arcade. Nat Mandir – An Open Pavilion with domed roof having an area of 450 Sq m Location –As on faces the temple, on the right side of the paved approach, right in front of the temple. Dala Arcade – A shopping arcade having 124 nos 10’ X 10’ shops to accumulate the dala vendors. Location – On the left side of the paved approach as face towards the temple M/s Viraj Project (P) Ltd Rs Core 2 Eco- Camp Complex, Beach Shelter & Drainage. Eco-Camp – Consisting of Reception Centre, 20 nos small Eco-Huts, 10 nos Large tented Huts, Eating House & Toilet Blocks. Location – The Complex is located behind the temple complex between road no. 4 & 5. Beach Shelter – On the Beach overlook from the Temple. M/s Viraj Project (P) Ltd Rs 9.11 Core 3 Leach Pit Based Toilet and Permanent & Temporary Composite Solid Waste Management Facilities 20 Nos leach Pit Based Toilet Blocks comprising of 10 nos toilet in each block to be set up at 2 location, one near the exiting toilet right side of Road no. And another at the beach. 4 nos solid waste handling facilities shall be located at different locations covering the entire pilgrim area M/s N.K. Basu & Company Rs 2.12 Crore 4Bus Terminal.Bus Stand shall have Waiting Area, Food Court, Toilet Block and Tourist Information Centre & Transport Office Location – In the Road island at the confluence of Road No. 3,4&5 at the start of the Mela Ground M/s N.K. Basu & Company Rs 1.85 Crore

LOCATION OF ADOPTED ECOTOURISM FACILITIES ECO CAMP BUS STAND DALA ARCADE NAT MANDIR KAPIL MUNI ASHRAM BEACH SHELTERS COMPOSTING PLANT N LEACH PIT BASED TOILETS LEACH PIT BASED TOILET

Tendered Amount :- Rs 10,90,10, Name of Agency :- M/s Viraj Projects Pvt. Ltd. Date of Commencement as Per Work Order :- 27/01/2015 Expected Date of Completion :- 31/10/2016 Name of Job :- Public Rain Shelter Cum Dala Arcade

DALA ARCADE Area sqm BIRDS’ EYE VIEW

NO. OF SHOPS – 124 AREA – SQM DALA ARCADE MAN EYE VIEW

Brief Description of the Project as on 30 th April 2016 Excavation :- 85% Completed. Filling Below Foundation (Yellow Sand) :- 80% Completed. Column Foundation (Base Raft) :- 19 Nos Out of 22 Nos Completed Column Casting 1 st Lift :- 22 Nos Out of 28 Nos Completed Column Casting 2 nd :- 18 Nos Out of 28 Nos Completed Column Casting 3 rd :- 18 Nos Out of 28 Nos Completed Toilet Block Slab at (+)3.45 m Level :- 01 Nos Out of 04 Nos Completed Lintel Casting :- 45 % Completed Damp Proof Course Work :- 50 % Completed Base Raft for Brick Work :- 75 % Completed Brick Work in Sub- Structure :- 70 % Completed Brick Work in Super Structure :- 60 % Completed Inside Shop Brick Work :- 30 % Completed Silver Sand Filling (Below Floor) :- 65 % Completed Grade Slab :- 40 % Completed Roof Slab Casting :- 30 % Completed

Sl.No.DescriptionUnit Tender Quantity Tentative Revised Qty Executed Qty.Physical Progress Up to March In AprilCumulative Up to March In AprilCumulative 1Earth Work in Excavation Cum %5.24%47.65% 2 Silver Sand Filling/ yellow sand filling Cum Plain Cement ConcreteCum Reinforced Cement ConcreteCum Brick WorkCum ReinforcementMt Back FillingCum Anti Termite (Base & Wall)Sqm Anti Termite (Below Floor)Sqm Damp Proof CourseSqm Earth DisposlCum PlasterCum ShutteringSqm Staging WorkCum FlooringCum6420

Completion Status Major Mile Stone Basis Up to April 2016 Description of work Weight age % on the basis of Man Power Required Completion % as per weight age Excavation Sand Filling in foundation21.6 Foundation Concrete54 Brick Work UPTO FFL107 Brick Wall from FFL to Bottom of Roof106 Floor Filling63.9 Floor Concreting104 Roof Concreting257.5 Partition Wall30.9 Inside Plaster20 Outside Plaster20 Finish Flooring20 Electrical20 Painting10 Sanitory10 Land Scaping20 Door Windows10 MISC WORK10 TOTAL

Roof Casting Work is on Progress

Public Rain Shelter Cum Dala Arcade ( Silver Sand Filling work is on Progress)

Sand Filling and Foundation work is on Progress

Brick Work is on Progress

BAR CHART PUBLIC RAIN SHALTER CUM DALA ARCADE Approved Drawing for Foundation received on so consider same date as start 3rd week WEEK Scope of work Site was demobilised and work was completely stopped due to Ganga sagar mel aa Mobilization Excavation, Filling & Ramming Work was stooped due to decission in of excavation quantity not finalised P.C.C Footing P.C.C For Masonary R.C.C Footing R.C.C Column Upto GR,Level Masonary Upto GR,Level R.C.C Column upto Bottom of Slab Masonary Upto Bottom of Slab Slab (R.C.C) Water Proofing Fixing of Door Windows Internal Plaster Electrical Inernal Flooring 5 Sanitary Internal Inside Painting Land Scaping Land Lighting Out Side Plastering Out Side Painting Cleaning & Misc. ORIGINAL REVISED BAR (incorporated the 52 days of work loss due to heavy rainfall ) This Programme is Archiveable when all condition of the contract will be Honoured by Employer

Tendered Amount :- Rs 23,828, Name of Agency :- M/s Viraj Projects Pvt. Ltd. Date of Commencement as Per Work Order :- 27/01/2015 Expected Date of Completion :- 31/10/2016 Name of Job :- Public Rain Shelter Cum Nat Mandir

VIEW OF NAT MANDIR Area – sqmSitting Capacity - 725

Brief Description of Project as of 30 th April 2016 Foundation : - Completed. Filling below foundation (Yellow Sand) :- Completed. Back Filling by Excavated Earth :- Completed. Tie Beam :- Completed. Column up to Roof Beam Bottom :- Completed. Silver Sand Filling below Plinth :- Completed. Plain Cement Concrete below Floor :- Completed. Grade Slab :- Completed. Roof Beam & Dome Shuttering :- 50% Completed. (As per Previous Drawing) Reinforcement Work for Roof :- 40% Completed. (As per Previous Drawing) Roof & Dome Casting :- 1 st Dome 50% & 2 nd Dome 40% (As per previous Drawing. Dome Shuttering (As Per Revised Drg.) :- 2 Nos Dome Completed & Work is in Progress in another 2 Nos Dome. Reinforcement Work (As Per Revised Drg.) :- 2 Nos Dome Completed. Casting of Dome :- Work in progress in 2 Nos Dome Note: - The Work Stopped due to disagreement of Mohanto of Kapil Muni Ashram regarding the shape of dome from 20 th November Revised drawing had been issued and the work started from 17/3/2016.

Sno.DescriptionUnit Tender Quantity Tentative Revised Qty Executed Qty.Physical Progress Up to March In AprilCumulative Up to March In AprilCumulative 1 Earth Work in Excavation Cum %4.72%63.80% 2 Silver Sand Filling/ yellow sand filling Cum Plain Cement Concrete Cum Reinforced Cement Concrete Cum Brick WorkCum ReinforcementMt Back FillingCum PlasterCum3365 9ShutteringSqm FlooringCum1905

Completion Status Major Mile Stone Basis up to April 2016 Description of work Weight age % on the basis of Man Power Required Completion % as per weight age Excavation15 Sand filling44 Foundation15 Column + Masonary upto FFL55 Floor At GRL10 Column upto Bottom of Roof10 Roof Casting244.8 Tiling work60.0 Plaster20.0 Electrical20.0 Painting20.0 Landscaping50.0 TOTAL

Dome Shuttering & Concreting work is on progress

Date; BAR CHART PUBLIC RAIN SHALTER CUM NAT MANDIR Date of Proceed of Work : Foundation Drawings recived on 24:04:2015 MONTHS WEEK Scope of work Mobilization Excavation,Filling & Ramming P.C.C Footing R.C.C Footing R.C.C Column & Tie Beam Upto PL,Level Outer Side Brick Stalt Ground Floor P.C.C & R.C.C Column's upto Floor Level Electrical Internal Work Stopped on 21:11:2015 client instruction due to change in Drawing.Changed roof Drawings released on 17:02:16 Top Slab Internal & External Plaster Flooring Water Proofing Painting (Internal & External) Land Scapping Landscap Lightining Cleaning & Misc. ORIGINAL REVISED BAR (incorporated the 52 days of work loss due to heavy rainfall )

ECO-CAMP SITE EATING HOUSE 8500 X 8500 SMALL HUT (20 NOS) 5000 X 4100 LARGE HUT (10 NOS) 6500 X 6500 RECEPTION X 8000 TOILET BLOCK

LARGE HUTSMALL HUT EATING HOUSETOILET BLOCK

Tender Amount :- Rs 51,294, Name of Agency :- M/s Viraj Projects Pvt. Ltd. Date of Commencement as Per Work Order :- 27/01/2015 Expected Date of Completion :- Name of Job :- Eco-Camp Complex

Large Hut (10 Nos) Excavation :- 8 Out of 10 Nos Hut Completed. Foundation :- 8 Out of 10 Nos Hut Completed. Column upto Plinth Level Slab :- 8 Out of 10 Nos Hut Complete. Casting of Plinth Slab :- 7 Out of 10 Nos Hut Completed. Column up to Eaves Beam Bottom :- 7 Out of 10 Nos Hut Completed. Casting of Eaves Beam :- 7 Out of 10 Nos Hut Completed. Brick work Above Plinth :- 6 Out of 10 Nos Hut Completed. Small Hut (20 Nos) Excavation :- 14 Out of 20 Nos Hut Completed. Foundation :- 11 Out of 20 Nos Hut Completed. Column upto Plinth Level Slab :- 11 Out of 20 Nos Hut Completed. Casting of Plinth Slab :- 9 Out of 20 Nos Hut Completed. Column up to Eaves Beam Bottom :- 9 Out of 20 Nos Hut Completed. Casting of Eaves Beam :- 5 Out of 20 Nos Hut Completed. Brick work Above Plinth :- 2 Out of 20 Nos Completed.

Eating House (1 No.) Excavation :- Completed. Foundation :- Completed. Column up to Plinth Level Slab :- Completed. Casting of Plinth Slab :- Completed. Column up to Eaves Beam Bottom :- Completed. Casting of Eaves Beam :- Completed. Brick Work Above Plinth :- Completed. Toilet Block (2 Nos) Excavation :- 2 Out of 2 Nos Block Completed. Foundation :- 2 Out of 2 Nos Block Completed. Column up to Plinth Level Beam :- 2 Out of 2 Nos Block Completed. Plinth Level Beam :- 2 Out of 2 Nos Block Completed. Plinth Level Slab :- 2 Out of 2 Nos Completed. Brick Work above Plinth :- 1 Out of 2 Nos Completed up to Lintel Level. Reception Block (1 No.) Excavation :- Completed. Foundation :- Complete. Pedestal upto Plinth Level Slab :- Complete. Plinth Level Slab :- Complete.

Sl.No. DescriptionUnit Tender Quantity Tentative Revised Qty Executed Qty.Physical Progress Up to March In AprilCumulative Up to March In AprilCumulative 1Earth Work in ExcavationCum % 3.69% 34.15% 2 Silver Sand Filling / Yellow Sand Filling Cum Plain Cement ConcreteCum Reinforced Cement ConcreteCum Brick WorkCum ReinforcementMt ShutteringSqm Back FillingCum FlooringCum

Completion Status Major Mile Stone Basis up to April 2016 Description of work Weightage % on the basis of Man Power Required Completion % as per weightage Excavation Sand Filling in foundation21.4 Foundation107.0 Upto Floor Slab106.0 Upto Eaves Beam105.5 Masonary upto Eaves Beam103 Roof100 Plastering50 Door Windows20 Flooring30 Electrical50 Sanitory30 Painting20 Land Scaping30 MISC WORK100 TOTAL

ECO-CAMP – EATING HOUSE-BRICK WORK COMPLETED ECO-CAMP – TOILET BLOCK-I (UP TO LINTEL LEVEL) ECO- CAMP – LARGE HUT (BRICK WORK ABOVE PLINTH) ECO- CAMP – LARGE HUT– STRUCTURAL WORK IN PROGRESS

ECO-CAMP TOILET BLOCK II– (COLUMN COMPLETED UPTO LINTEL LEVEL) ECO-CAMP – RECEPTION CENTRE– PLINTH SLAB COMPLETE ECO-CAMP – SMALL HUT – EAVES BEAM WORK IS IN PROGRESS ECO-CAMP – SMALL HUT (BRICK WORK)

Tender Amount :- Rs 40,484, Name of Agency :- M/s Viraj Project Pvt. Ltd. Date of Commencement as Per Work Order :- 27/01/2015 Work Not Yet Started. Name of Job :- Drainage & Beach Shelter

BUS STAND No. of Buses- 38.

FOOD COURT (BUS STAND) TOURIST INFORMATION & TRANSPORT OPERATOR’S OFFICE FRONT ELEVATION

WAITING AREA (BUS STAND)

Tender Amount :- Rs 18,517, Name of Agency :- M/s N.K. Basu & Company Date of Commencement as Per Work Order :- 27/01/2015 Expected Date of Completion : Name of Job :- Bus Terminal

Bus Terminal Present Position Waiting Area. Foundation :- Completed. Column :- Completed. Tie Beam :- Completed. Eaves Beam :- Completed. Brick Work :- Stair Brick Work Completed. Back Filling :- Completed. Plastering work :- Completed. Grade Slab :- Completed. Food & Drink Facility. Foundation :- Completed. Column :- Completed. Tie Beam :- Completed. Eaves Beam :- Completed. Back Filing :- Completed. Brick Work :- Completed. Plastering work :- Completed Grade Slab :- Completed. Toilet Block. Foundation :- Completed. Column :- Completed. Tie Beam :- Completed. Back Filing :- Completed. Lintel & Chajjah Casting :- Completed. Eaves Beam :- Completed. Brick Work :- Completed. Plastering :- Completed. Grade Slab :- Completed. Tourist & Information Office. Excavation :- Completed. Foundation :- Completed. Pedestal :- Completed. Back Filling :- Completed. Tie-Beam :- Completed. Column :- Completed up to Eaves Beam Bottom Brick Work (Above Plinth) :- Completed up to Eaves Beam Bottom Septic Tank & Soak Pit :- 2 nos Completed.

Sl.No.DescriptionUnit Tender Quantity Tentative Revised Qty Executed Qty.Physical Progress Up to March In AprilCumulative Up to March In AprilCumulative 1 Earth Work in Excavation Cum %0.10%52.55% 2Yelow Sand FillingCum Silver Sand FillingCum Plain Cement ConcreteCum Reinforced Cement Concrete Cum Brick WorkCum ReinforcementMt ShutteringSqm Back FillingCum Septic Tank & Soak PitNos PlasterCum

Description of work Weightage % on the basis of Man Power Required Completion % as per weightage Excavation2520 Sand filling52.8 Foundation Massonary Above Plinth32.47 Floor At GRL33 Column upto Bottom of Roof76 Roof Casting100.0 Tiling work30.0 Plaster31.5 Electrical10.0 Painting10.0 Brick Pavement100.0 Plumbing & Sanitary10.2 Landscaping20.0 Door & Window Fixing10.0 Misc Work20.0 TOTAL Completion Status Major Mile Stone Basis up to April 2016

Description of work Weightage % on the basis of Man Power Required Completion % as per weightage Excavation2520 Sand filling52.8 Foundation Massonary Above Plinth32.47 Floor At GRL33 Column upto Bottom of Roof76 Roof Casting10 Tiling work3 Plaster31.5 Electrical1 Painting1 Brick Pavement10 Plumbing & Sanitary10.2 Landscaping2 Door & Window Fixing1 Misc Work2 TOTAL

BUS TERMINAL – WAITING AREA – PLASTERING COMPLETE BUS TERMINAL – FOOD & DRINK FACILITY – PLASTERING COMPLETE BUS TERMINAL – TOURIST & INFORMATION CENTRE –BRICK WORK COMPLETE BUS TERMINAL – TOILET BLOCK – PLASTERING COMPLETE

Name of Job :- Leach Pit Based Toilet & Temporary and Permanent Composite Solid Waste Facility Tender Amount :-Rs. 21,224, Name of Contractor :- M/s N.K. Basu & Company Date of Commencement as Per Work Order :- 27/01/2015 Expected Date of Completion :

Brief Description of the Project as on 30 th April 2016 Out of 20 Nos Unit – Work is on Progress in 12 Nos Unit 5 Nos Block Completed up to Super Structure. 2 Nos Block Completed up to Sub Structure. 5 Nos Block Excavation & Leach Pit Brick Work Completed Sl.No.DescriptionUnit Tender Quantity Tentative Revised Qty Executed Qty.Physical Progress Up to March In April Cumulative Up to March In AprilCumulative 1. Construction of temporary toilet blocks with Leach Pit based onsite treatment system - 10 toilet per unit Nos %5%45% Leach Pit Based Toilet

(under construction)

Name of Agency :- M/s N.K. Basu & Company Date of Commencement as Per Work Order :- 27/01/2015 Work Not Yet Started. Name of Job :- Temporary & Permanent Composite ` Soild Waste Facility

FINANCIAL PROGRESS AS OF 30 th APRIL, 2016 Sl. no.Name of ContractorName of JobContact Value Financial Progress Up to March In AprilCumulative 1M/s Viraj Project (P) Ltd. Construction of Rain Shelter cum Nat Mandir 23,828, %3.54%32.50% 2M/s Viraj Project (P) Ltd. Construction of Rain Shelter cum Dala Arcade 109,010, %2.81%30.774% 3M/s Viraj Project (P) Ltd. Construction of Eco- Camp Complex, 51,294, %4.42%44.66% 4M/s Viraj Project (P) Ltd. Construction of Beach Shelter & Drainage 40,484, % 5M/s N.K. Basu & Company Construction of Bus Terminal 18,517, %0.92%45.74% 6M/s N.K. Basu & Company Construction of Leach Pit Based Toilet & Temporary and permanent composite solid waste facility 21,224, %0.00%9.99%

Financial Progress

PAYMENT DETAILS Package -1: Construction of Public Rain Shelter cum Nat Mandir & Public Rain Shelter cum Dala Arcade Package -2: Construction of ECO - Camp Complex, Beach Shelter and Drainage Sl. No. RA Bill reference & DateDate of Certification Amount (Rs) Remarks 1. Mobilisation Advance million 2.1 st RA Bill25/8/ Lac 3.2 nd RA Bill18/09/ Lac 4.3 rd RA Bill01/10/ Lac 5.4 th RA Bill18/12/ Lac 6.5 th RA Bill28/12/ Lac 7.6 th RA Bill13/01/ Lac 8.7 th RA Bill22/03/ Lac 98 th RA Bill27/04/ Lac Total = lac Sl. No. RA Bill reference & DateDate of Certification Amount ( Rs) Remarks 1. Mobilisation Advance million 2.1 st RA Bill25/8/ Lac 3.2 nd RA Bill18/09/ Lac 4.3 rd RA Bill01/10/ Lac 5.4 th RA Bill18/12/ Lac 6.5 th RA Bill28/12/ Lac 7.6 th RA Bill13/01/ Lac 8.7 th RA Bill01/02/ Lac 9.8 th RA Bill08/03/ Lac 109 th RA Bill27/04/ Lac Total = Lac

Package -3: Construction of Leach Pit Based Toilet and Solid Waste Management Facility Package -4: Construction of Bus Terminus Sl. No. RA Bill reference & Date Date of Certification Amount (Rs.)Remarks 1. Mobilisation Advance1.061 million 2.1 st RA Bill23/01/ LacsTotal = Lac Sl. No. RA Bill reference & Date Date of Certification Amount (Rs.) Remarks 1. Mobilisation Advance0.925 million 2.1 st RA Bill25/8/ Lac 3.2 nd RA Bill31/10/ Lac 4. 3 rd RA Bill7/12/ Lac 5. 4 th RA Bill22/03/ Lac Total = Lac

BOTTLENECK OF THE PROJECT Change in Design & Bill of quantity as per Soil Investigation after award of contract. Inaccessibility of the site during rainy season Labour problem during election Period Frequent revision of Drawings of the structure and not timely submission also. Variation of quantities of BOQ with actual site condition and problems arise from that Inappropriate Monitoring of the progress of work by the Consultant in respect of the work Programme.

Measures Taken Drawing protocol has been finalised to avoid frequent revisions. Consultant has been requested for close monitoring for progress and appropriate action on agency thereon.

THANK YOU